Planning application
Institute of Education 20 Bedford Way London WC1H 0AL
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Internal works to replace partitions, raised access floor and suspended ceiling, and associated alterations to fifth floor wing of educational facility (Class D1).
As published by the council, reference 2012/6178/L
Application record
- Reference
- 2012/6178/L
- Category
- Heritage and listed buildings
- Status
- Final Decision
- Decision
- Granted
- Decided
- 15 Jan 2013
- Postcode
- WC1H 0AL
Site history
Applications at this address on the Camden register
This site has had 42 applications since 2012: 36 approved, 2 refused.
-
2026/3533/P Awaiting decision
Institute Of Education 20 Bedford Way London WC1H 0AL
Variation of condition 2 (approved plans) of planning permission 2024/3198/P dated 02/10/2024 (for: Upgrading of the existing Bloomsbury District Heat network through the installation of roof mounted air source heat pumps and supporting equipment within an acoustic enclosure, and associated external works.) NAMELY, the reconfiguration of plant, amendment of the steelwork structure distributing the load of the new plant areas through the existing building, and the amendment of the louvred plant screens to satisfy the opposing requirements of ventilation to plant and sound attenuation.
-
2026/3505/L Awaiting decision
Institute Of Education 20 Bedford Way London WC1H 0AL
Variation of condition 2 (approved plans) of Listed Building Consent 2024/3245/L dated 02/10/2024 (for: Upgrading of the existing Bloomsbury District Heat network through the installation of roof mounted air source heat pumps and supporting equipment within an acoustic enclosure, and associated external works.) NAMELY, the reconfiguration of plant, amendment of the steelwork structure distributing the load of the new plant areas through the existing building, and the amendment of the louvred plant screens to satisfy the opposing requirements of ventilation to plant and sound attenuation.
-
2024/3644/L Granted
Institute of Education 20 Bedford Way London WC1H 0AL
Internal works comprising reconfiguration and refurbishment of Levels 5-9 Core A nib and wing, Level 6 wing A Lawton Room, Level 1 plantroom, Level 4 Room 426, Level 5 Zone C and Levels 1, 3 and 4 foyers; replacement mezzanine levels to selected rooms at Levels 2 and 3 in Core C and Levels 4 and 5; creation of new plant room at Level 8 wing A; new post room to Level 4; installation of platform lifts at Level 3 and 4 foyers; installation of fixed furniture and security gates in foyers; replacement of doors to the IALs building at Levels 4-9; infill of Level 1 drama hall window; replacement of existing halls signage with new digital signage at Levels 1-9 Cores A and B, Level 3 and 4 Zone B and Level 5 Zone C; and other associated internal works. External works comprising a new extended entrance at Bedford Way; a reconfigured entrance at Thornhaugh Mews; alterations to roof plant enclosure and new chiller unit; repairs and installation of insulation to external Levels 6-9 terraces; installation of secondary glazing to selected panels; new louvres at Level 8 wing A; smoke ventilation panels along Bedford Way elevation; refurbishment and repairs to Level 4 and 10 roof; new external gate at Level 5 wing A; replacement rooflights at Level 4; external beacons at Level 6 and 10 roof; and other associated external works
-
2024/3607/P Granted
Institute of Education 20 Bedford Way London WC1H 0AL
Installation of new extended entrance at Bedford Way; a reconfigured entrance at Thornhaugh Mews; alterations to roof plant enclosure and new chiller unit; repairs and installation of insulation to external Levels 6-9 terraces; installation of secondary glazing to selected panels; new louvres at Level 8 wing A; smoke ventilation panels along Bedford Way elevation; refurbishment and repairs to Level 4 and 10 roof; new external gate at Level 5 wing A; replacement rooflights at Level 4; external beacons at Level 6 and 10 roof; and other associated external works.
-
2024/3245/L Granted
Institute Of Education 20 Bedford Way London WC1H 0AL
Upgrading of the existing Bloomsbury District Heat network through the installation of roof mounted air source heat pumps and supporting equipment within an acoustic enclosure, and associated external and internal works
-
2024/3198/P Granted
Institute Of Education 20 Bedford Way London WC1H 0AL
Upgrading of the existing Bloomsbury District Heat network through the installation of roof mounted air source heat pumps and supporting equipment within an acoustic enclosure, and associated external works
-
2021/6235/P Granted
Institute Of Education 20 Bedford Way London WC1H 0AL
Refurbishment and reconfiguration of selected areas comprising: a new extended entrance at Bedford Way, a reconfigured entrance at Thornhaugh Mews; and other associated works.
-
2021/6242/L Granted
Institute Of Education 20 Bedford Way London WC1H 0AL
Refurbishment and reconfiguration of selected areas comprising: a new extended entrance at Bedford Way, a reconfigured entrance at Thornhaugh Mews; insertion of a new platform lift at Level 3 and a platform lift serving Level 3 and 4; refurbishment of the foyers at Levels 1, 3 and 4 including the installation of fixed furniture and security gates; replacement of doors to the IALS building at Levels 4-9; and other associated works.
-
2020/1787/L Granted
Institute Of Education 20 Bedford Way London WC1H 0AL
Refurbishment of the lifts within the Cores B and C including the upgrade of landing indicators, evacuations intercoms, landing stations, fire control switches, landing doors, service stations, header/overgate panels and other associated works.
-
2020/1567/L Granted
Institute Of Education 20 Bedford Way London WC1H 0AL
Refurbishment and reconfiguration of selected areas of the Institute of Education comprising: repairs and installation of insulation to the external terraces; creation of a new plant room at Level 8 Wing A and installation of new louvres to serve this plant room; refurbishment and repairs to the lobby roof on level 4 and the roof at Level 10; installation of new external gate at Level 5 of Wing A; and associated works.
Timeline
Dates from the published record
-
15 Jan 2013
Decision issued: Granted
-
22 Jul 2026
Added to PlanIndex
What this grant of permission means
Camden granted permission on 15 January 2013, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About heritage and listed building applications
Listed building consent is needed for works that affect the special interest of a listed building, and carrying out such works without it is a criminal offence. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
University Of London Institute Of Education 20 Bedford Way London WC1H 0AL
Details of external noise levels required by condition 4 of planning permission 2020/1520/P approved 15/06/2020 for the refurbishment and reconfiguration of selected areas of the Institute of Education comprising: repairs and installation of insulation to the external terraces; creation of a new plant room at Level 8 Wing A and installation of new louvres to serve this plant room; refurbishment and repairs to the lobby roof on level 4 and the roof at Level 10; installation of new external gate at Level 5 of Wing A; and associated works.
Granted Full applications 5 docs -
Institute of Education 20 Bedford Way London WC1H 0AL
Internal works comprising reconfiguration and refurbishment of Levels 5-9 Core A nib and wing, Level 6 wing A Lawton Room, Level 1 plantroom, Level 4 Room 426, Level 5 Zone C and Levels 1, 3 and 4 foyers; replacement mezzanine levels to selected rooms at Levels 2 and 3 in Core C and Levels 4 and 5; creation of new plant room at Level 8 wing A; new post room to Level 4; installation of platform lifts at Level 3 and 4 foyers; installation of fixed furniture and security gates in foyers; replacement of doors to the IALs building at Levels 4-9; infill of Level 1 drama hall window; replacement of existing halls signage with new digital signage at Levels 1-9 Cores A and B, Level 3 and 4 Zone B and Level 5 Zone C; and other associated internal works. External works comprising a new extended entrance at Bedford Way; a reconfigured entrance at Thornhaugh Mews; alterations to roof plant enclosure and new chiller unit; repairs and installation of insulation to external Levels 6-9 terraces; installation of secondary glazing to selected panels; new louvres at Level 8 wing A; smoke ventilation panels along Bedford Way elevation; refurbishment and repairs to Level 4 and 10 roof; new external gate at Level 5 wing A; replacement rooflights at Level 4; external beacons at Level 6 and 10 roof; and other associated external works
Granted Heritage and listed buildings Extension Loft or dormer +1 -
Institute of Education 20 Bedford Way London WC1H 0AL
Display of 1x non illuminated fascia sign on the west elevation, 2 x acrylic panels signs on east elevation and 3 x free standing signs within flowerbed on west side.
Granted -
University Of London Institute Of Education 20 Bedford Way London Camden WC1H 0AL
The Discharge of Condition 6 a) (Sample Panel) (ref: 2021/6242/L granted 02/03/2022) For: Refurbishment and reconfiguration of selected areas within the IoE, No. 20 Bedford Way.
Granted Heritage and listed buildings -
Institute of Education 20 Bedford Way London WC1H 0AL
Display of 1x non illuminated fascia sign on the west elevation, 2 x acrylic panels signs on east elevation and 3 x free standing signs within flowerbed on west side.
Granted Heritage and listed buildings -
20 Bedford Way London WC1H 0AL
Internal works at 2nd floor level to create a new mezzanine level and associated internal alterations.
Granted Heritage and listed buildings
Other heritage and listed building applications
In Camden
-
2026/1913/L Withdrawn
12 Woburn Square London WC1H 0NS
External works comprising replacement of all existing windows with timber framed slimline double-glazed units, blocking up windows to rear elevtion, replacement external doors at rear, raising parapet level of rear closet wing, and associated minor alterations and refurbishment works. Interal works comprising alterations to floorplans, new service fitouts, structural and fire safety upgrades, and other associated works.
-
2026/4396/L Awaiting decision
34 Cumberland Terrace London NW1 4HP
Internal alterations to third-floor apartment including reconfiguration of layout and installation of new fittings and finishes. installation of new fixtures and finishes.
-
2026/2511/L Granted
Flat A 26 Eton Avenue London NW3 3HL
Proposed internal refurbishments including floor and wall insulation and underfloor heating, roof insulation to existing single storey rear extension, installation of 1 x ASHP with associated acoustic enclosure and a replacement shed in rear garden and replacement of front windows.
-
2026/3683/L Granted
Kenwood House Hampstead Lane Haringey London NW3 7JR
Temporary works for a period of 12 months to the Grade II listed former Dairy buildings associated with the installation of an electrical supply to the temporary sauna facility, comprising the lifting and reinstatement of existing floorboards, installation of electrical cabling beneath the floor, formation of a cable opening through the external wall at subfloor level and subsequent reinstatement following removal of the temporary connection.
-
2026/4394/L Granted
82 Hampstead High Street London NW3 1RE
Discharge of details for condition 4a and b (details of new windows and doors) of listed building consent 2025/2518/L granted on 19 November 2025 for "Proposed refurbishment of the ground floor commercial unit (Class E), first and second floor apartments (Class C3) with proposed single-storey rear extensions together with the Change of Use of the existing first floor commercial space to one additional apartment".