Skip to content
PlanIndex Get alerts
Menu

Planning application

77 Sumatra Road London NW6 1PT

Granted Camden 2011/6446/P Full applications

Works: Extension Loft or dormer

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Erection of two rear dormer roof extensions and two roof lights to the front roof slope of existing house (Class C3).

As published by the council, reference 2011/6446/P

Application record

Reference
2011/6446/P
Category
Full applications
Status
Final Decision
Decision
Granted
Decided
9 Feb 2012
Postcode
NW6 1PT

Site history

Applications at this address on the Camden register

This site has had 3 applications since 2010: 3 approved, 0 refused.

  • 2010/4866/P Granted

    77 Sumatra Road London NW6 1PT

    Alterations to existing dwelling house (Class C3) including the erection of a side extension at ground floor level, the erection of a dormer roof extension within existing loft, the installation of two rear dormer windows and two velux roof windows at front elevation.

    Decided 2 Nov 2010 Full applications
  • 2010/3198/P Granted

    77 Sumatra Road London NW6 1PT

    Change of use from 2 non self-contained flats to a single dwelling (Class C3).

    Decided 12 Aug 2010 Full applications

Timeline

Dates from the published record

  1. 9 Feb 2012

    Decision issued: Granted

  2. 22 Jul 2026

    Added to PlanIndex

What this grant of permission means

Camden granted permission on 9 February 2012, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About full applications

A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.

Nearby applications

Within 500 metres

  • 77 Sumatra Road London NW6 1PT

    2010/4866/P 0m away

    Alterations to existing dwelling house (Class C3) including the erection of a side extension at ground floor level, the erection of a dormer roof extension within existing loft, the installation of two rear dormer windows and two velux roof windows at front elevation.

    Granted Full applications Extension Loft or dormer +1
    Domestic
  • 77 Sumatra Road London NW6 1PT

    2010/3198/P 0m away

    Change of use from 2 non self-contained flats to a single dwelling (Class C3).

    Granted Full applications New dwelling
    Domestic
  • 75 Sumatra Road London NW6 1PT

    2014/7883/P 4m away

    Erection of a single storey side/rear infill extension and alterations to first floor rear elevation window.

    Granted Full applications Extension Windows or glazing
    Small domestic
  • 75 Sumatra Road London NW6 1PT

    2014/7771/P 4m away

    Demolition of existing rear dormer to permit the construction of L-shaped rear dormer and the addition of 3 rooflights to front elevation.

    Split decision Full applications Loft or dormer Demolition
  • 73 Sumatra Road London NW6 1PT

    2015/0297/P 10m away

    Erection of side/rear ground floor extension.

    Granted Full applications Extension
  • 73 Sumatra Road London NW6 1PT

    2014/7029/P 10m away

    Installation of two rooflights to front roofslope and dormer to rear roofslope

    Granted Full applications Loft or dormer

In Camden

  • 2026/3898/P Awaiting decision

    98 Marchmont Street London WC1N 1AG

    Installation of a new kitchen extraction and ventilation system to the rear of the premises, including associated external ductwork, extraction plant and ancillary equipment.

    16 Sep 2026 Full applications
  • 2026/2709/P Awaiting decision

    166A Camden Street London NW1 9PT

    Change of use from Use Class E to C3 Residential, demolition of existing store and office space, and erection of a three-bedroom dwellinghouse.

    16 Sep 2026 Full applications
  • 2026/3994/P Awaiting decision

    Euston Tower 286 Euston Road London NW1 3DP

    Details to discharge Condition 23 (LUL Subculture) of planning reference 2023/5240/P dated 26/01/26 for redevelopment of Euston Tower comprising retention of parts of the existing building (including central core, basement and foundations) and erection of a new building incorporating these retained elements, to provide a 32-storey mixed-use building providing offices and research and development floorspace (Class E(g)) and office, retail, caf?? and restaurant space (Class E) and Enterprise Space (Class E/F) at ground and first floors, and associated external terraces; public realm enhancements, including new landscaping and provision of new publicly accessible steps and ramp; short and long stay cycle storage; servicing; refuse storage; plant and other ancillary and associated work.

    15 Sep 2026 Full applications
  • 2026/3993/P Awaiting decision

    Euston Tower 286 Euston Road London NW1 3DP

    Details to discharge Condition 22 (LUL Infrastructure) of planning reference 2023/5240/P dated 26/01/26 for redevelopment of Euston Tower comprising retention of parts of the existing building (including central core, basement and foundations) and erection of a new building incorporating these retained elements, to provide a 32-storey mixed-use building providing offices and research and development floorspace (Class E(g)) and office, retail, caf?? and restaurant space (Class E) and Enterprise Space (Class E/F) at ground and first floors, and associated external terraces; public realm enhancements, including new landscaping and provision of new publicly accessible steps and ramp; short and long stay cycle storage; servicing; refuse storage; plant and other ancillary and associated work.

    15 Sep 2026 Full applications
  • 2026/3861/P Awaiting decision

    Beaumont Court 1-45 College Grove London NW1 0RW

    Installation of condensors and minor alterations to elevations at lower floors.

    15 Sep 2026 Full applications