Planning application
Eden Baptist Chapel 1 Fitzroy Street Cambridge Cambridgeshire CB1 1ER
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Removal of 2 No. existing gas boilers from the internal plant room and replace with 4 No. air source heat pumps on the flat roof at the rear of the building and the re-purpose of the plant room as additional worship space.
As published by the council, reference 26/02494/FUL
Application record
- Reference
- 26/02494/FUL
- Type
- Full Application
- Status
- Decided
- Decision
- Granted Permission
- Received
- 1 Jul 2026
- Validated
- 9 Jul 2026
- Decided
- 2 Sep 2026
- Ward
- Market
- Decision by
- Delegated Decision
- Postcode
- CB1 1ER
Timeline
Dates from the published record
-
1 Jul 2026
Received by Cambridge
-
9 Jul 2026
Validated
Checked as complete and ready for consideration.
-
23 Jul 2026
Added to PlanIndex
-
2 Sep 2026
Decision issued: Granted Permission
Who's behind it
Company information only, from the register and Companies House
ORANGEHOUSE RENEWABLES LIMITED Agent, registered in March
Active · incorporated 2008 · March
2 applications on PlanIndex · across 2 councils
Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.
See their track recordDocuments
Plans, drawings, consultee responses and the officer's report
22 documents on file for this application
- DELEGATED REPORT
- DECISION NOTICE
- ENVIRONMENTAL QUALITY AND GROWTH
- MCS PLANNING NOISE ASSESSMENT
- LOCAL HIGHWAY AUTHORITY
- ENVIRONMENTAL QUALITY AND GROWTH
- CONSERVATION
- ACKNOWLEDGEMENT LETTER
- MAP OF NOTIFIED NEIGHBOURS
- SITE NOTICE
- ROOF PLAN
- INVALID LETTER
- APPLICATION FORM - NO PERSONAL INFO
- FEE CALCULATION
- ATTACHMENT SUMMARY FROM PORTAL
- INSTALLATION AND MAINTENANCE MANUAL
- DESIGN AND ACCESS STATEMENT
- CTC ECOAIR 400 MANUAL
- LOCATION PLAN
- FIRST FLOOR PLAN
- GROUND FLOOR PLAN
- STREET ELEVATIONS
Trade members open them from here.
Open the documentsWhat this grant of permission means
Cambridge granted permission on 2 September 2026, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About full applications
A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.
Nearby applications
Within 500 metres
-
Eden Baptist Chapel 1 Fitzroy Street Cambridge CB1 1ER
Improvements to main entrance and insertion of window in south elevation.
Granted Full applications Windows or glazing 22 docs -
Pavement O/S 4 Fitzroy Street Cambridge Cambridgeshire CB1 1EW
1no. new BT street hub, incorporating 2no. digital 75" LCD advert screens, and associated BT phone kiosk removal.
Refused Full applications 35 docs -
Pavement O/S 4 Fitzroy Street Cambridge Cambridgeshire CB1 1EW
Installation of 2no. digital LCD display screens, one on each side of the street hub unit.
Refused Advertising 29 docs -
11 Fitzroy Street Cambridge Cambridgeshire CB1 1ER
Replace existing Signage with 1 No. internally illuminated Signage.
Granted Advertising 16 docs -
2-14 Fitzroy Street Cambridge Cambridgeshire CB1 1EW
Certificate of lawfulness under S191 for the carrying out drainage construction works approved under planning permission (22/04491/FUL) for the Refurbishment and extension, including terrace and replacement plant and flue at roof top level, external alterations and re-ordering of service yard, parking provision, replacement plant and new bin and plant enclosure.
Granted Lawful development Extension 16 docs -
28 Maids Causeway Cambridge Cambridgeshire CB5 8DD
Demolition of roof, construction of replacement roof including hipped mansard roof to front and reconfiguration of second floor windows. Installation of solar panels to house and garage roofs. Entrance railings and steps to be replaced and paved with stone.
Granted Householder Loft or dormer Roofing +2 16 docsDomestic
Other full applications
In Cambridge
-
26/02687/FUL Granted
Brookfields Health Centre Seymour Street Cambridge Cambridgeshire CB1 3DQ
Retrospective retention of existing modular building for a period of 5 years
-
26/02187/FUL Granted
43 Hinton Avenue Cambridge Cambridgeshire CB1 7AR
Retrospective change of use of land to residential curtilage and installation of gravel area.
-
26/02187/HFUL Granted
43 Hinton Avenue Cambridge Cambridgeshire CB1 7AR
Retrospective change of use of land to residential curtilage and installation of gravel area.
-
26/02716/FUL Granted
8 Lion Estates, Unit 1 Coldhams Road Cambridge Cambridgeshire CB1 3EW
Change of use from Class B8 warehouse with ancillary offices to a mixed use as Class E(g)(i) offices and Class F1(f) place of worship, or Class E(g)(i) and B8 in the alternative
-
26/02485/FUL Granted
Institute Of Astronomy, Observatory Building And Library Madingley Road Cambridge Cambridgeshire CB3 0HA
Alterations to provide improved disabled access, alongside general maintenance works. The scheme comprises the following: new external ramp to the eastern side of the central portico, new external ramp to service the exterior door in the western facade of the building, with interior mat well removed, regrading of external site levels to service the exterior door in the eastern facade of the building, with interior mat well removed, mechanisation of exterior doors and rearrangement of toilet block within eastern wing to provide disabled wc facility.