Planning application
26/02019/FUL
4 Trumpington Street Cambridge Cambridgeshire CB2 1QA
Proposal
Installation of a retractable canvas awning to the front elevation.
As published by the council, reference 26/02019/FUL
Timeline
Dates from the published record
-
29 May 2026
Received by Cambridge
-
5 Jun 2026
Validated
Checked as complete and ready for consideration.
-
23 Jul 2026
Added to PlanIndex
-
Decision
Awaiting decision
The statutory target is eight weeks for most applications and thirteen for major development. Extensions of time are common.
What happens while it is decided
The process from here
This application is with Cambridge for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.
The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
22/05096/FUL Granted
10 Trumpington Street Cambridge Cambridgeshire CB2 1QA
Replacement and restoration of steps and canopy (part retrospective).
-
22/05097/LBC Granted
10 Trumpington Street Cambridge Cambridgeshire CB2 1QA
Replacement and restoration of steps and canopy.
-
26/02380/S19LB Awaiting decision
1 Trumpington Street Cambridge Cambridgeshire CB2 1QA
S19LB to vary condition 2 (approved drawings) of ref: 25/04390/LBC (Garden wall rebuild and repairs at 1 Trumpington Street and 1 Bene't Place) showing additonal section of wall to be rebuilt.
-
25/04389/NMA1 Granted
1 Trumpington Street Cambridge Cambridgeshire CB2 1QA
Non material amendment on application 25/04389/FUL for additional section of wall to be deconstructed and rebuilt in conjunction with the shorter boundary wall. This will entail propping 2no. arches (one was going to be propped and rebuilt as part of the original LBC works), and the general deconstruction and rebuilding of the wall, the return wall with significant cracks and the main boundary wall require these works to remove the lean, belly, and risk of further movement (and potential collapse).
-
26/02474/LBC Awaiting decision
1 Trumpington Street Cambridge Cambridgeshire CB2 1QA
Internal repairs at ground floor due to moisture ingress affecting timber joists, lintels and plasterwork
-
26/01684/PRIOR Granted
69 - 71 Lensfield Road Cambridge Cambridgeshire CB2 1EN
Change of use from Use Class E to Use Class C3 on first and second floors to create 3no dwellings.
Other full applications applications
In Cambridge
-
26/02897/FUL Awaiting decision
Friends Meeting House 12 Jesus Lane Cambridge Cambridgeshire CB5 8BA
Retrofit and refurbishment of Jesus Lane Quaker Meeting House, including alterations to fenestration and openings, alternations to external material, extending parapet, new roof top mechanical equiptment for heating, mvhr and solar pv, new lift core, new single storey rear courtyard extension and amendments to public realm, part change of use from residential class C3 to place of Worship class F1
-
26/02885/FUL Awaiting decision
7A Cambridge Leisure Park Clifton Way Cambridge Cambridgeshire CB1 7DY
New Shopfront and addition of external Seating Area and the installation of 1 No. internally illuminated fascia sign and 1 No. internally illuminated projecting sign.
-
26/01569/FUL Granted
1 New Square Cambridge Cambridgeshire CB1 1EY
Re-building of rear external wall and internal alterations together with Decarbonisation strategy including installation of air source heat pump, window glazing upgrade and associated energy efficiency building works.
-
25/04039/FUL Granted
Kett House Station Road Cambridge Cambridgeshire
Demolition of the existing building and structures, erection of an office building (Class E) to include ground floor flexible units (Class E, F1, F2) and a single basement for car parking and plant, hard and soft landscaping to create a new public realm, stopping up of the existing vehicular access on Hills Road and the provision of vehicular access on Station Road, provision of cycle access/parking, and related infrastructure and servicing.
-
26/00696/FUL Withdrawn
27-28 Bridge Street Cambridge Cambridgeshire CB2 1UJ
Installation of new shopfront and seating at the rear external court yard with conservatory glass roof.