Planning application

Land North West Of 379 To 381 Milton Road Cambridge Cambridgeshire

Granted Cambridge 26/01786/FUL Full Application

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Construction of a substation compound, to incorporate 3 primary transformers and a switch house building (with associated basement) to accommodate the required 33kV and 11kV switchgear and associated fencing.

As published by the council, reference 26/01786/FUL

Application record

Reference
26/01786/FUL
Type
Full Application
Status
Decided
Decision
Granted Permission
Received
12 May 2026
Validated
14 May 2026
Decided
20 Jul 2026
Ward
Kings Hedges
Decision by
Delegated Decision

Timeline

Dates from the published record

  1. 12 May 2026

    Received by Cambridge

  2. 14 May 2026

    Validated

    Checked as complete and ready for consideration.

  3. 20 Jul 2026

    Decision issued: Granted Permission

  4. 23 Jul 2026

    Added to PlanIndex

Who's behind it

Company information only, from the register and Companies House

Tetra Tech Ltd Agent, registered in Leeds

Active · incorporated 1985 · Leeds

167 applications on PlanIndex · across 83 councils · 97% granted

Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.

See their track record

Documents

Plans, drawings, consultee responses and the officer's report

34 documents on file for this application

  • DECISION NOTICE Application Decision Notice · 20 Jul 2026
  • DELEGATED REPORT Application Committee / Delegated Report · 20 Jul 2026
  • LANDSCAPE Consultee Comments · 10 Jun 2026
  • ENVIRONMENTAL QUALITY AND GROWTH Consultee Comments · 10 Jun 2026
  • URBAN DESIGN Consultee Comments · 10 Jun 2026
  • SITE NOTICE Application Press/Site Notices · 02 Jun 2026
  • DRAINAGE Consultee Comments · 02 Jun 2026
  • LOCAL HIGHWAY AUTHORITY Consultee Comments · 01 Jun 2026
  • ECOLOGY Consultee Comments · 27 May 2026
  • ACKNOWLEDGEMENT LETTER Application Officer Correspondence · 19 May 2026
  • MAP OF NOTIFIED NEIGHBOURS Neighbour/Consultee Notification List · 19 May 2026
  • SITE NOTICE Application Press/Site Notices · 19 May 2026
  • SITE NOTICE PHOTO Application Press/Site Notices · 19 May 2026
  • SITE NOTICE PHOTO Application Press/Site Notices · 19 May 2026
  • INVALID LETTER Application Information · 14 May 2026
  • BNG METRIC CALCULATION Application Information · 14 May 2026
  • FEE CALCULATION Application Information · 12 May 2026
  • APPLICATION FORM - NO PERSONAL INFO Application Information · 12 May 2026
  • ATTACHMENT SUMMARY FROM PORTAL Attachment Summary · 12 May 2026
  • PROPOSED SWITCHROOM ELEVATIONS Drawings · 12 May 2026
  • PROPOSED SITE ELEVATIONS Drawings · 12 May 2026
  • SUBSTATION COMPOUND LAYOUT Drawings · 12 May 2026
  • EMF ASSESSMENT Application Survey / Assessment / Statement · 12 May 2026
  • PROPOSED SITE PLAN Drawings · 12 May 2026
  • EXISTING SITE PLAN Drawings · 12 May 2026
  • BIODIVERSITY NET GAIN BASELINE REPORT Application Information · 12 May 2026
  • PRELIMINARY ECOLOGICAL APPRAISAL ADDENDUM Application Information · 12 May 2026
  • ARBORICULTURAL METHOD STATEMENT Application Survey / Assessment / Statement · 12 May 2026
  • PRELIMINARY ECOLOGICAL APPRAISAL Application Survey / Assessment / Statement · 12 May 2026
  • ACOUSTICS ASSESSMENT Application Survey / Assessment / Statement · 12 May 2026
  • DRAINAGE REPORT Application Information · 12 May 2026
  • HERITAGE DESK-BASED ASSESSMENT Application Survey / Assessment / Statement · 12 May 2026
  • PLANNING DESIGN AND ACCESS STATEMENT Design and Access Statement · 12 May 2026
  • SITE LOCATION PLAN Drawings · 12 May 2026

Trade members open them from here.

Open the documents

What this grant of permission means

Cambridge granted permission on 20 July 2026, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About full applications

A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.

Nearby applications

Within 500 metres

In Cambridge

  • 26/02687/FUL Granted

    Brookfields Health Centre Seymour Street Cambridge Cambridgeshire CB1 3DQ

    Retrospective retention of existing modular building for a period of 5 years

    15 Jul 2026 Full applications
  • 26/02187/FUL Granted

    43 Hinton Avenue Cambridge Cambridgeshire CB1 7AR

    Retrospective change of use of land to residential curtilage and installation of gravel area.

    10 Jun 2026 Full applications
  • 26/02187/HFUL Granted

    43 Hinton Avenue Cambridge Cambridgeshire CB1 7AR

    Retrospective change of use of land to residential curtilage and installation of gravel area.

    10 Jun 2026 Full applications
  • 26/02716/FUL Granted

    8 Lion Estates, Unit 1 Coldhams Road Cambridge Cambridgeshire CB1 3EW

    Change of use from Class B8 warehouse with ancillary offices to a mixed use as Class E(g)(i) offices and Class F1(f) place of worship, or Class E(g)(i) and B8 in the alternative

    17 Jul 2026 Full applications
  • 26/02485/FUL Granted

    Institute Of Astronomy, Observatory Building And Library Madingley Road Cambridge Cambridgeshire CB3 0HA

    Alterations to provide improved disabled access, alongside general maintenance works. The scheme comprises the following: new external ramp to the eastern side of the central portico, new external ramp to service the exterior door in the western facade of the building, with interior mat well removed, regrading of external site levels to service the exterior door in the eastern facade of the building, with interior mat well removed, mechanisation of exterior doors and rearrangement of toilet block within eastern wing to provide disabled wc facility.

    30 Jun 2026 Full applications