Skip to content
PlanIndex Get alerts
Menu

Planning application

222 The Victoria Project, Rooms 1 - 3 Victoria Road Cambridge Cambridgeshire CB4 3LG

Awaiting decision Cambridge 26/01634/FUL Full Application

Works: Trees

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

Widening of the existing car park entrance and resurfaced to provide 5 parking bays, installation of an electric vehicle charging point within the car park, addition of root protection measures to existing trees, resurfacing of rear courtyard, removal of existing cycle store and replaced with new cycle store, construction of a new secure bin store within Briggs Passage and replace existing fencing, pedestrian gates and vehicle access gates associated with Cherry House, installation of bollards around access points and replacement of existing external entrance doors.

As published by the council, reference 26/01634/FUL

Application record

Reference
26/01634/FUL
Type
Full Application
Status
Awaiting decision
Received
29 Apr 2026
Validated
24 Jul 2026
Ward
Arbury
Postcode
CB4 3LG

Timeline

Dates from the published record

  1. 29 Apr 2026

    Received by Cambridge

  2. 24 Jul 2026

    Validated

    Checked as complete and ready for consideration.

  3. 1 Aug 2026

    Added to PlanIndex

  4. Decision

    Awaiting decision

    Decision expected by 18 September 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    Cambridge took a median of 52 days over the applications it decided in the last year.

Who's behind it

Company information only, from the register and Companies House

Storm Tempest Ltd. Agent, registered in Hebburn

Active · incorporated 2005 · Hebburn

24 applications on PlanIndex · across 13 councils · 76% granted

Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.

See their track record

Documents

Plans, drawings, consultee responses and the officer's report

29 documents on file for this application

  • LOCAL HIGHWAY AUTHORITY Consultee Comments · 13 Aug 2026
  • ENVIRONMENTAL QUALITY AND GROWTH Consultee Comments · 12 Aug 2026
  • CONSERVATION Consultee Comments · 29 Jul 2026
  • EXISTING SITE PLAN Drawings · 24 Jul 2026
  • PROPOSED SITE PLAN Drawings · 24 Jul 2026
  • PRODUCT DETAILS Application Information · 24 Jul 2026
  • ACKNOWLEDGEMENT LETTER Application Officer Correspondence · 24 Jul 2026
  • MAP OF NOTIFIED NEIGHBOURS Neighbour/Consultee Notification List · 24 Jul 2026
  • SITE NOTICE Application Press/Site Notices · 24 Jul 2026
  • INVALID CHASE Application Information · 18 May 2026
  • INVALID LETTER Application Information · 01 May 2026
  • FEE CALCULATION Application Information · 29 Apr 2026
  • APPLICATION FORM - NO PERSONAL INFO Application Information · 29 Apr 2026
  • ATTACHMENT SUMMARY FROM PORTAL Attachment Summary · 29 Apr 2026
  • EXISTING RECEPTION AREA Drawings · 29 Apr 2026
  • HERITAGE STATEMENT Application Survey / Assessment / Statement · 29 Apr 2026
  • PROPOSED RECEPTION AREA Drawings · 29 Apr 2026
  • PROPOSED PHASE ONE GROUND FLOOR Drawings · 29 Apr 2026
  • TENDER SUMMARY SHEET Application Information · 29 Apr 2026
  • PROPOSED RECEPTION AREA FLOORING Drawings · 29 Apr 2026
  • DESIGN AND ACCESS STATEMENT Design and Access Statement · 29 Apr 2026
  • LOCATION PLAN Drawings · 29 Apr 2026
  • PHASE TWO EXISTING FIRST FLOOR Drawings · 29 Apr 2026
  • EXISTING GROUND FLOOR Drawings · 29 Apr 2026
  • PROPOSED PHASE ONE Drawings · 29 Apr 2026
  • PROPOSED PHASE ONE Drawings · 29 Apr 2026
  • PHASE TWO PROPOSED FIRST FLOOR Drawings · 29 Apr 2026
  • PHASE TWO PROPOSED GROUND FLOOR Drawings · 29 Apr 2026
  • PHASE TWO GROUND FLOOR M&E DOORS, CEILING AND DECORATION Drawings · 29 Apr 2026

Trade members open them from here.

Open the documents

What happens while it is decided

This application is with Cambridge for determination, against a statutory target of eight weeks. Over the last year Cambridge decided full applications in a median of 70 days. More in our guide to how long planning decisions take.

About full applications

A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.

Nearby applications

Within 500 metres

In Cambridge

  • 26/02687/FUL Granted

    Brookfields Health Centre Seymour Street Cambridge Cambridgeshire CB1 3DQ

    Retrospective retention of existing modular building for a period of 5 years

    15 Jul 2026 Full applications
  • 26/02187/FUL Granted

    43 Hinton Avenue Cambridge Cambridgeshire CB1 7AR

    Retrospective change of use of land to residential curtilage and installation of gravel area.

    10 Jun 2026 Full applications
  • 26/02187/HFUL Granted

    43 Hinton Avenue Cambridge Cambridgeshire CB1 7AR

    Retrospective change of use of land to residential curtilage and installation of gravel area.

    10 Jun 2026 Full applications
  • 26/02716/FUL Granted

    8 Lion Estates, Unit 1 Coldhams Road Cambridge Cambridgeshire CB1 3EW

    Change of use from Class B8 warehouse with ancillary offices to a mixed use as Class E(g)(i) offices and Class F1(f) place of worship, or Class E(g)(i) and B8 in the alternative

    17 Jul 2026 Full applications
  • 26/02485/FUL Granted

    Institute Of Astronomy, Observatory Building And Library Madingley Road Cambridge Cambridgeshire CB3 0HA

    Alterations to provide improved disabled access, alongside general maintenance works. The scheme comprises the following: new external ramp to the eastern side of the central portico, new external ramp to service the exterior door in the western facade of the building, with interior mat well removed, regrading of external site levels to service the exterior door in the eastern facade of the building, with interior mat well removed, mechanisation of exterior doors and rearrangement of toilet block within eastern wing to provide disabled wc facility.

    30 Jun 2026 Full applications