Planning application

Christs College, First Court St Andrews Street Cambridge Cambridgeshire CB2 3BU

Granted Cambridge 24/03687/FUL Full Application

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Removal of chimney ref. CM07 to ridge level and reconstructing using Ketton stone to mirror the size, proportions and detailing of the existing.

As published by the council, reference 24/03687/FUL

Application record

Reference
24/03687/FUL
Type
Full Application
Status
Decided
Decision
Granted Permission
Received
1 Oct 2024
Validated
7 Oct 2024
Decided
29 Nov 2024
Ward
Market
Decision by
Delegated Decision
Postcode
CB2 3BU

Timeline

Dates from the published record

  1. 1 Oct 2024

    Received by Cambridge

  2. 7 Oct 2024

    Validated

    Checked as complete and ready for consideration.

  3. 29 Nov 2024

    Decision issued: Granted Permission

  4. 14 Aug 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

19 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • Christs College, First Court St Andrews Street Cambridge Cambridgeshire CB2 3BU

    24/03517/LBC Submitted 18 Sep 2024 0m away

    Rebuilding of CM07 using Ketton stone and installation of insulation to the roof to second floor rooms within the roof to L, M, N & O staircases.

    Granted Heritage and listed buildings 20 docs
  • Opposite Christs College St Andrews Street Cambridge Cambridgeshire CB2 3BU

    26/03347/TELNOT Submitted 2 Sep 2026 18m away

    93% historically approved · decision due ~28 Oct

    Installation of 1 no. omni antenna installed at 5.4m and 5.5m in height on the existing lamppost, 1 no. standalone feeder pillar installed against the wall behind the lamppost and ancially development thereto including 1 no. Baseband unit (BBU) installed at 5.9m, 2 no. Remote Radio Units (RRUs) installed at 5.65m and 5.75m on the existing lamppost.

    Awaiting decision Telecoms 4 docs
  • Christs College, First Court St Andrews Street Cambridge Cambridgeshire CB2 3BU

    22/05155/LBC Submitted 28 Nov 2022 36m away

    Refurbishment to H, I and K staircases of First Court, Christ's College. To include full re-roofing, external repairs and minor internal alterations.

    Granted Heritage and listed buildings 46 docs
  • 1-5 Sidney Street Cambridge Cambridgeshire CB2 3HG

    26/02663/LBC Submitted 13 Jul 2026 37m away

    98% historically approved · decision due ~7 Sep

    Replacement and repair of selected internal doors, frames and architraves.

    Awaiting decision Heritage and listed buildings 18 docs
  • Christs College Library Christs College St Andrews Street Cambridge Cambridgeshire

    26/02109/FUL Submitted 5 Jun 2026 52m away

    93% historically approved · decision due ~5 Aug

    Demolition of 1970s library and replacement with new library, social and study spaces including re-provision of bridge to the Bodley Library. Alterations to kitchen, Upper Hall and adjacent areas including new plant, access improvements and alterations to wc, provision in the south east range of Second Court. Re-landscaping of Bath Court and ancillary works, installation of temporary kitchen and dining facility in Second Court for the duration of the works.

    Awaiting decision Full applications Demolition 280 docs
  • 17-18 Petty Cury Cambridge Cambridgeshire CB2 3NE

    26/01748/FUL Submitted 8 May 2026 56m away

    93% historically approved · decision due ~3 Jul

    Replacement of existing shopfront.

    Awaiting decision Full applications Windows or glazing 17 docs

In Cambridge

  • 26/03345/FUL Awaiting decision

    Robinson College Grange Road Cambridge Cambridgeshire CB3 9AN

    Installation of 6no condenser units on flat roof of G-Staircase and removal of existing ground level air handling unit enclosure from College gardens.

    2 Sep 2026 Full applications
  • 26/03300/FUL Awaiting decision

    St Johns College Playing Field Grange Road Cambridge Cambridgeshire CB3 0EE

    Demolition of existing sports pavilion and car park and construction of a replacement sports pavilion with new pedestrian access from Madingley Road, associated works and landscaping.

    1 Sep 2026 Full applications
  • 26/03280/FUL Awaiting decision

    7 Thorleye Road Cambridge Cambridgeshire CB5 8NF

    Erection of an ancillary outbuilding to provide flexible communal accommodation for HMO residents at 7 Thorleye Road.

    28 Aug 2026 Full applications
  • 26/02124/FUL Granted

    1-3 Flat Brookfields Cambridge Cambridgeshire CB1 3NW

    Retrospective installation of Security roller Shutters to front and side elevations.

    8 Jun 2026 Full applications
  • 26/02560/FUL Granted

    Memorial Court Clare College Queens Road Cambridge Cambridgeshire CB3 9AJ

    Provision of new ASHP plant on the site of the present skip and bin store, relocation of bin store to NE corner of site, associated cabling and landscaping works.

    6 Jul 2026 Full applications