Planning application
Grafton Centre Fitzroy Street Cambridge Cambridgeshire
Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.
Proposal
Non material amendment on application 23/02685/FUL for amendments to conditions 3, 12 and 20.
As published by the council, reference 23/02685/NMA2
Application record
- Reference
- 23/02685/NMA2
- Type
- Non-Material Amendment
- Status
- Awaiting decision
- Received
- 1 Sep 2026
- Validated
- 1 Sep 2026
- Ward
- Market
Timeline
Dates from the published record
-
1 Sep 2026
Received by Cambridge
-
3 Sep 2026
Added to PlanIndex
-
Decision
Awaiting decision
Decision expected by 27 October 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.
Cambridge took a median of 52 days over the applications it decided in the last year.
Who's behind it
Company information only, from the register and Companies House
Agent on file, registered in Cambridge
648 applications on PlanIndex · across 82 councils · 89% granted
Trade members see who it is, their full track record, and every application they have filed.
See who's behind itDocuments
Plans, drawings, consultee responses and the officer's report
7 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat happens while it is decided
This application is with Cambridge for determination, against a statutory target of eight weeks. Over the last year Cambridge decided amendment applications in a median of 35 days. More in our guide to how long planning decisions take.
About amendment applications
An amendment application makes limited changes to a permission that already exists; anything beyond modest adjustment needs a fresh application. More in our guide to planning application types.
Other amendment applications
In Cambridge
-
23/04732/NMA5 Awaiting decision
Devonshire Gardens Devonshire Road Cambridge CB1 2BJ
Non material amendment of planning permission 23/04732/S73 Addition of oak pergola to terrace areas of the Blocks B, C and D, Roof access walkways / handrails added to provide maintenance access to PV panels and rooflights on roofs of Blocks B, C and D, Rainwater overflows added to Block B to meet requirements of blue/green roof system, Roof access walkway/handrail added to Block C to provide maintenance access for PV Panels and Rainwater overflows added to Block D to meet requirements of blue/green roof system.
-
26/02644/S73 Granted
14 Lyndewode Road Cambridge Cambridgeshire CB1 2HL
S73 to vary condition 2 (approved plans) of planning permission 25/00583/HFUL (Demolition of existing rear extension and garden room with new single storey rear extension and new annex in the rear garden and associated landscaping works) to incorporate front garden landscaping arrangements and the addition of a cycle store within the side passage.
-
25/02891/NMA1 Granted
19 Selwyn Road Cambridge Cambridgeshire CB3 9EA
Non material amendment on application 25/02891/HFUL for outbuilding reduction in size.
-
25/04475/NMA1 Granted
11 Romsey Terrace Cambridge Cambridgeshire CB1 3NH
Non material amendment on application 25/04475/HFUL to include changes to fully glass/glazed roof for the side return we wish to switch it with a tiled roof containing three standardised roof lights and a vent for an extractor fan.
-
26/03325/S73 Awaiting decision
Robinson College Grange Road Cambridge Cambridgeshire CB3 9AN
S73 to vary condition 2 (approved drawings) of planning permission 25/02613/FUL (Upgrade and modifications to the ductwork, ventilation canopies and HVAC system to the main basement kitchen, including the creation of a new plant room and associated internal and external works) to allow revised extract ductwork across the Cloister Corridor, discharging through new louvres within an existing masonry opening, together with associated alterations to the positioning of condenser units.