Proposal

S73 variation of conditions 2 (Approved plans), 15 (Traffic Management plan) and 27 (Surface Water Drainage) of planning permission 18/1890/FUL (Erection of nine residential units comprising a terrace of 4 x three bedroom houses, 4 x two bedroom flats and 1 x one bedroom flat with access, car parking, and associated landscaping, following the demolition of the existing building on site, at Malta Road, Cambridge) to move the townhouses 0.5m off the northern boundary, to change the balcony material and to allow the commencement of foul drainage works to commence on site prior to submission of a traffic management plan and surface water drainage scheme.

As published by the council, reference 22/04331/S73

Application record

Reference
22/04331/S73
Type
Section 73 - Remove/Vary Condition
Status
Decided
Decision
Granted As published: Granted Permission
Received
30 Sep 2022
Validated
1 Nov 2022
Decided
27 Jan 2023
Ward
Coleridge
Decision by
Delegated Decision
Postcode
CB1 3LW

Timeline

Dates from the published record

  1. 30 Sep 2022

    Received by Cambridge

  2. 1 Nov 2022

    Validated

    Checked as complete and ready for consideration.

  3. 27 Jan 2023

    Decision issued: Granted Permission

  4. 14 Aug 2026

    Added to PlanIndex

Cases linked to this one on the register

  • Application: 18/1890/FUL (Decided)

Who's behind it

Company information only, from the register and Companies House

Pegasus Group Ltd Agent

1,231 applications on PlanIndex · across 171 councils · 91% granted

Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.

See their track record

This Land Ltd. Applicant, registered in Histon

Active · incorporated 2016 · Histon

2 applications on PlanIndex

Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.

See their track record

Documents

Plans, drawings, consultee responses and the officer's report

83 documents on file for this application

  • DELEGATED REPORT Application Committee / Delegated Report · 27 Jan 2023
  • DECISION NOTICE Application Decision Notice · 27 Jan 2023
  • HIGHWAY AUTHORITY Consultee Comments · 25 Jan 2023
  • DRAINAGE Consultee Comments · 06 Jan 2023
  • INITIAL DRAINAGE WORKS Drawings · 21 Dec 2022
  • MALTA ROAD METHOD STATEMENT Application Information · 21 Dec 2022
  • EOT CONFIRMATION Agent / Applicant Comments · 21 Dec 2022
  • EOT REQUEST Extension of Time Request · 16 Dec 2022
  • LANDSCAPE Consultee Comments · 06 Dec 2022
  • NATURE CONSERVATION Consultee Comments · 24 Nov 2022
  • LOCAL HIGHWAY AUTHORITY Consultee Comments · 23 Nov 2022
  • LOCAL HIGHWAY AUTHORITY Consultee Comments · 09 Nov 2022
  • QUALITY AND GROWTH Consultee Comments · 04 Nov 2022
  • SITE NOTICE Application Press/Site Notices · 02 Nov 2022
  • ACKNOWLEDGEMENT LETTER Application Officer Correspondence · 28 Oct 2022
  • NOTIFIED NEIGHBOURS LIST Neighbour/Consultee Notification List · 28 Oct 2022
  • MAP OF NOTIFIED NEIGHBOURS Neighbour/Consultee Notification List · 28 Oct 2022
  • WASTE Consultee Comments · 28 Oct 2022
  • INVALID LETTER Application Information · 28 Oct 2022
  • APPLICATION FORM - NO PERSONAL INFO Application Information · 30 Sep 2022
  • FEE CALCULATION Application Information · 30 Sep 2022
  • ATTACHMENT SUMMARY FROM PORTAL Attachment Summary · 30 Sep 2022
  • LANDSCAPE MASTERPLAN Drawings · 30 Sep 2022
  • INITIAL DRAINAGE WORKS Drawings · 30 Sep 2022
  • LANDSCAPE MASTERPLAN Drawings · 30 Sep 2022
  • DETAILED HARD LANDSCAPE PROPOSALS Drawings · 30 Sep 2022
  • LANDSCAPE SPECIFICATION AND DETAILS Drawings · 30 Sep 2022
  • DETAILED HARD LANDSCAPE PROPOSALS Drawings · 30 Sep 2022
  • TRANSPORT NOTE Application Survey / Assessment / Statement · 30 Sep 2022
  • DETAILED PLANTING PROPOSALS Drawings · 30 Sep 2022
  • EXTERNAL ELECTRICAL SERVICES LAYOUT Drawings · 30 Sep 2022
  • DETAILED PLANTING PROPOSALS Drawings · 30 Sep 2022
  • SITE PLAN - PROPOSED SITE AND GROUND FLOOR PLAN Drawings · 30 Sep 2022
  • EXTERNAL LIGHTING LUX LAYOUT Drawings · 30 Sep 2022
  • PROPOSED SECOND FLOOR PLAN Drawings · 30 Sep 2022
  • PROPOSED ROOF PLAN Drawings · 30 Sep 2022
  • PROPOSED ELEVATIONS IN CONTEXT Drawings · 30 Sep 2022
  • PERSPECTIVE VIEW 1 Application Information · 30 Sep 2022
  • PERSPECTIVE VIEW 2 Application Information · 30 Sep 2022
  • PERSPECTIVE VIEW 3 Application Information · 30 Sep 2022
  • PERSPECTIVE VIEW 4 Application Information · 30 Sep 2022
  • CASE STUDY BEDFORDSHIRE Application Information · 30 Sep 2022
  • CASE STUDY CARRBRIDGE HOMES Application Information · 30 Sep 2022
  • DETAILS OF ECODAN AND ACCESSORIES Application Information · 30 Sep 2022
  • ENERGY STATEMENT Application Survey / Assessment / Statement · 30 Sep 2022
  • NOISE & VIBRATION CONTROL MANAGEMENT PLAN Application Information · 30 Sep 2022
  • PROPOSED FIRST FLOOR PLAN Drawings · 30 Sep 2022
  • EXTERNAL LIGHTING CALCULATIONS Application Information · 30 Sep 2022
  • COVER LETTER Application Information · 30 Sep 2022
  • LOCATION PLAN Drawings · 30 Sep 2022
  • SUBMISSION SCHEDULE Application Information · 30 Sep 2022
  • PLANNING STATEMENT Application Survey / Assessment / Statement · 30 Sep 2022
  • REGULATIONS COMPLIANCE REPORT Application Survey / Assessment / Statement · 30 Sep 2022
  • REGULATIONS COMPLIANCE REPORT Application Survey / Assessment / Statement · 30 Sep 2022
  • OVERHEATING COMPLIANCE Application Survey / Assessment / Statement · 30 Sep 2022
  • REGULATIONS COMPLIANCE REPORT Application Survey / Assessment / Statement · 30 Sep 2022
  • REGULATION COMPLIANCE REPORT Application Survey / Assessment / Statement · 30 Sep 2022
  • OVERHEATING REPORT Application Survey / Assessment / Statement · 30 Sep 2022
  • REGULATION COMPLIANCE REPORT Application Survey / Assessment / Statement · 30 Sep 2022
  • REGULATION COMPLIANCE REPORT Application Survey / Assessment / Statement · 30 Sep 2022
  • OVERHEATING REPORT Application Survey / Assessment / Statement · 30 Sep 2022
  • REGULATION COMPLIANCE REPORT Application Survey / Assessment / Statement · 30 Sep 2022
  • REGULATION COMPLIANCE REPORT Application Survey / Assessment / Statement · 30 Sep 2022
  • OVERHEATING REPORT Application Survey / Assessment / Statement · 30 Sep 2022
  • REGULATION COMPLIANCE REPORT Application Survey / Assessment / Statement · 30 Sep 2022
  • OVERHEATING COMPLIANCE Application Survey / Assessment / Statement · 30 Sep 2022
  • REGULATION COMPLIANCE REPORT Application Survey / Assessment / Statement · 30 Sep 2022
  • REGULATION COMPLIANCE REPORT Application Survey / Assessment / Statement · 30 Sep 2022
  • REGULATION COMPLIANCE REPORT Application Survey / Assessment / Statement · 30 Sep 2022
  • OVERHEATING COMPLIANCE Application Survey / Assessment / Statement · 30 Sep 2022
  • REGULATION COMPLIANCE REPORT Application Survey / Assessment / Statement · 30 Sep 2022
  • REGULATION COMPLIANCE REPORT Application Survey / Assessment / Statement · 30 Sep 2022
  • OVERHEATING COMPLIANCE Application Information · 30 Sep 2022
  • REGULATION COMPLIANCE REPORT Application Survey / Assessment / Statement · 30 Sep 2022
  • REGULATION COMPLIANCE REPORT Application Survey / Assessment / Statement · 30 Sep 2022
  • OVERHEATING REPORT Application Survey / Assessment / Statement · 30 Sep 2022
  • REGULATION COMPLIANCE REPORT Application Survey / Assessment / Statement · 30 Sep 2022
  • REGULATION COMPLIANCE REPORT Application Survey / Assessment / Statement · 30 Sep 2022
  • OVERHEATING REPORT Application Survey / Assessment / Statement · 30 Sep 2022
  • UPDATED BAT ROOST ASSESSMENT Application Survey / Assessment / Statement · 30 Sep 2022
  • GEO-ENVIRONMENTAL & GEOTECHNICAL ASSESSMENT PAGE 1-50 Application Survey / Assessment / Statement · 30 Sep 2022
  • GEO-ENVIRONMENTAL & GEOTECHNICAL ASSESSMENT PAGE 51-100 Application Survey / Assessment / Statement · 30 Sep 2022
  • GEO-ENVIRONMENTAL & GEOTECHNICAL ASSESSMENT PAGE 101-107 Application Survey / Assessment / Statement · 30 Sep 2022

Watch members (£5 a month) open the document list from here.

Open the documents

What this grant of permission means

Cambridge granted permission on 27 January 2023, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About amendment applications

An amendment application makes limited changes to a permission that already exists; anything beyond modest adjustment needs a fresh application. More in our guide to planning application types.

Nearby applications

Within 0.3 miles

  • Family Centre Malta Road Cambridge Cambridgeshire CB1 3LW

    18/1890/CONDF Submitted 10 Aug 2026 50 yards away

    98% historically approved · decision due ~9 Oct

    Submission of details required by condition 15 (Construction Traffic Management Plan) of planning application 18/1890/FUL

    Awaiting decision Conditions 9 docs
  • Family Centre Malta Road Cambridge Cambridgeshire CB1 3LW

    18/1890/CONDD Submitted 19 Aug 2024 50 yards away

    98% historically approved · decision due ~14 Oct

    Submission of details required by condition 15 (Construction Traffic Management Plan) of planning permission 18/1890/FUL

    Awaiting decision Conditions 7 docs
  • Family Centre Malta Road Cambridge Cambridgeshire CB1 3LW

    18/1890/CONDE Submitted 4 Aug 2026 50 yards away

    98% historically approved · decision due ~29 Sep

    Submission of details required by condition 26 (solid screens) of planning application 18/1890/FUL

    Awaiting decision Conditions 8 docs
  • 33 Coleridge Road Cambridge Cambridgeshire CB1 3PH

    26/03159/FUL Submitted 19 Aug 2026 100 yards away

    91% historically approved · decision due ~14 Oct

    Erection of detached two-bedroom dwelling along with access, cycle parking and associated infrastructure following demolition of existing dwelling

    Awaiting decision Full applications Demolition 20 docs
    Domestic
  • 132 Hobart Road Cambridge CB1 3PS

    21/00565/CL2PD Submitted 10 Feb 2021 100 yards away

    Certificate of lawfulness under S192 for a rear dormer roof extension and two roof lights to front elevation.

    Granted Lawful development Extension Loft or dormer 12 docs
  • 132 Hobart Road Cambridge Cambridgeshire CB1 3PS

    21/00574/PRI01A Submitted 8 Feb 2021 100 yards away

    Ground floor rear extension

    Granted Householder Extension 13 docs
    Domestic

In Cambridge

  • 23/04687/NMA2 Awaiting decision

    Barnwell Local Centre Barnwell Road Cambridge Cambridgeshire CB5 8RG

    Non material amendment on application 23/04687/FUL to: 1 - Community Centre Hall (Block ABC east elevation) single exit doors within garden space amended to double doors to comply with fire strategy. 2 - Community Centre (Block ABC west elevation) 1no. window to one to one room at request of Cambridge City Council due to operational requirements. 3 - Community Centre (Block ABC link roof) 1no. Skylight introduced for access and natural light. 4 - Community Centre (Block ABC) Glazing to garden wall omitted for hit and miss brick detail at request of Cambridge City Council due to vandalism and maintenance concerns. 5 - Community Centre (Garden) Ramp omitted due to appropriate existing levels allowing level access. 6 - All Blocks (Elevations) 825mm reduction in parapet height to accommodate appropriate technical floor and roof build ups, and service voids, which would have otherwise increased overall building height. 7 - Block ABC (North and East Elevations) 3no. RWP's introduced on both elevations because loadings on roof are too great to comply with warranty provider requirements if falls only go from front to back. additionally higher parapets would have been required contradicting above change. 8 - Block D (North elevation) Plant room door omitted as no longer a requirement for electrical plant room. 9 - Block A (South elevation) M4(3) slopes introduced to patios of units to allow easier wheelchair access at request of Cambridge City Council

    Received 6 Oct, published by the council 9 Oct 2026 Amendments
  • 26/02814/NMA1 Awaiting decision

    115 Wadloes Road Cambridge Cambridgeshire CB5 8PF

    Non material amendment on application 26/02814/HFUL to the ridge line of the building on the original plan from mainly E/W to N/S on the new plan and the eaves on the new plan are 90mm higher

    Received 6 Oct, published by the council 9 Oct 2026 Amendments
  • 23/04732/NMA6 Awaiting decision

    Devonshire Gardens Devonshire Road Cambridge CB1 2BJ

    Non material amendment on application 23/04732/S73 for changes to the Permitted Scheme comprising the omission of the balustrades on the western elevation of Block F&G parapet gutters.

    Received 5 Oct, published by the council 8 Oct 2026 Amendments
  • 26/03739/S73 Awaiting decision

    98 Riverside Cambridge Cambridgeshire CB5 8HN

    S73 to vary condition 2 (approved plans) of ref: 26/01087/HFUL (Part single, part two storey side extension with first floor terrace and sedum roof. Roof extension including rear dormer, following demolition of existing carport building and separate lean-to structures. Alterations to fenestration.) to include repositioning of three walls to align with existing structure, patio door changed to window, addition of rooflights, metal balustrade instead of glass, and amended attic windows.

    Received 2 Oct, published by the council 9 Oct 2026 Amendments
  • 24/04593/NMA1 Granted

    12 Aylestone Road Cambridge Cambridgeshire CB4 1HF

    Non material amendment on application 24/04593/FUL to include additional 2no projecting solar shade louvre installation to the rear elevation.

    Received 21 Aug, published by the council 11 Sep 2026 Amendments