Skip to content
PlanIndex Get alerts
Menu

Planning application

Ashton House Newnham Road Cambridge Cambridgeshire CB3 9EY

Granted Cambridge 22/01495/FUL Full Application

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Refurbishment and alterations for the conversion of house to seven bedroom HMO for student accommodation and associated works.

As published by the council, reference 22/01495/FUL

Application record

Reference
22/01495/FUL
Type
Full Application
Status
Decided
Decision
Granted As published: Granted Permission
Received
28 Mar 2022
Validated
28 Mar 2022
Decided
6 Jan 2023
Ward
Newnham
Decision by
Delegated Decision
Postcode
CB3 9EY

Site history

Applications at this address on the Cambridge register

This site has had 2 applications since 2022: 2 approved, 0 refused.

  • 22/01775/LBC Granted

    Ashton House Newnham Road Cambridge Cambridgeshire CB3 9EY

    Remove existing rear porch along with small brick structures to the north and south, within the curtilage along with internal alterations. Conversion of existing house to seven bedroom HMO for student accommodation and associated works.

    Decided 6 Jan 2023 Heritage and listed buildings

Timeline

Dates from the published record

  1. 28 Mar 2022

    Received by Cambridge

  2. 6 Jan 2023

    Decision issued: Granted Permission

  3. 23 Jul 2026

    Added to PlanIndex

Who's behind it

Company information only, from the register and Companies House

Caroe Architecture Ltd Agent, an architecture practice registered in Great Chesterford

Active · incorporated 2009 · Great Chesterford

28 applications on PlanIndex · across 6 councils · 96% granted

Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.

See their track record

Documents

Plans, drawings, consultee responses and the officer's report

180 documents on file for this application

  • DECISION NOTICE Application Decision Notice · 06 Jan 2023
  • DELEGATION REPORT Application Committee / Delegated Report · 06 Jan 2023
  • LOCAL HIGHWAY AUTHORITY Consultee Comments · 14 Dec 2022
  • CONSERVATION Consultee Comments · 13 Dec 2022
  • SUSTAINABILITY Consultee Comments · 12 Dec 2022
  • ENVIRONMENTAL HEALTH Consultee Comments · 02 Dec 2022
  • ENVIRONMENTAL HEALTH Consultee Comments · 02 Dec 2022
  • CONSTRUCTION LOGISTIC PLAN WITH TREE PROTECTION FOR APPROVAL Drawings · 30 Nov 2022
  • GROUND FLOOR DEMOLITIONS Drawings · 30 Nov 2022
  • LOCATION PLAN Drawings · 30 Nov 2022
  • BLOCK PLAN Drawings · 30 Nov 2022
  • SITE PLAN AS EXISTING Drawings · 30 Nov 2022
  • SITE PLAN AS PROPOSED Application Information · 30 Nov 2022
  • CONSTRUCTION LOGISTICS PLAN WITH TREE PROTECTION FOR APPROVAL Application Information · 30 Nov 2022
  • PLANNING ISSUE SHEET Application Information · 30 Nov 2022
  • SECOND FLOOR Drawings · 30 Nov 2022
  • CYCLING PROVISIONS FOR PLANNING Drawings · 30 Nov 2022
  • GROUND FLOOR PLAN - EXISTING Drawings · 30 Nov 2022
  • FIRST FLOOR PLAN - EXISTING Drawings · 30 Nov 2022
  • SECOND FLOOR PLAN - EXISTING Drawings · 30 Nov 2022
  • ROOF PLAN - EXISTING Drawings · 30 Nov 2022
  • SECTIONAL ELEVATION SE1-SE1 - EXISTING Drawings · 30 Nov 2022
  • SECTIONAL ELEVATION SE2-SE2 - EXISTING Drawings · 30 Nov 2022
  • SECTIONAL ELEVATION SE3-SE3 - EXISTING Drawings · 30 Nov 2022
  • SECTIONAL ELEVATION SE4-SE4 & SE5-SE5 - EXISTING Drawings · 30 Nov 2022
  • SECTIONAL ELEVATION SE6-SE6 & SE7-SE7 - EXISTING Drawings · 30 Nov 2022
  • SECTIONAL ELEVATION SE8-SE8 & SE9-SE9 - EXISTING Drawings · 30 Nov 2022
  • SECTIONAL ELEVATION SE10-SE10 & SE11-SE11 - EXISTING Drawings · 30 Nov 2022
  • EAST ELEVATION - EXISTING Drawings · 30 Nov 2022
  • WEST ELEVATIONS - EXISTING Drawings · 30 Nov 2022
  • SOUTH ELEVATION - EXISTING Drawings · 30 Nov 2022
  • SOUTH ELEVATION - EXISTING Drawings · 30 Nov 2022
  • NORTH ELEVATION - EXISTING Drawings · 30 Nov 2022
  • WEST ELEVATION - EXISTING Drawings · 30 Nov 2022
  • DOOR SCHEDULE - 01 Drawings · 30 Nov 2022
  • DOOR SCHEDULE - 02 Drawings · 30 Nov 2022
  • DOOR SCHEDULE - 03 Drawings · 30 Nov 2022
  • WINDOW SCHEDULE - 01 Drawings · 30 Nov 2022
  • WINDOW SCHEDULE - 02 Drawings · 30 Nov 2022
  • SITE LOCATION PLAN Drawings · 30 Nov 2022
  • BLOCK PLAN Drawings · 30 Nov 2022
  • SITE PLAN - EXISTING Drawings · 30 Nov 2022
  • SITE PLAN - PROPOSED Drawings · 30 Nov 2022
  • GROUND FLOOR PLAN - PROPOSED Drawings · 30 Nov 2022
  • FIRST FLOOR PLAN - PROPOSED Drawings · 30 Nov 2022
  • SECOND FLOOR PLAN - PROPOSED Drawings · 30 Nov 2022
  • ROOF PLAN - PROPOSED Drawings · 30 Nov 2022
  • EAST ELEVATION - PROPOSED Drawings · 30 Nov 2022
  • WEST ELEVATION - PROPOSED Drawings · 30 Nov 2022
  • SOUTH ELEVATION - PROPOSED Drawings · 30 Nov 2022
  • NORTH ELEVATION - PROPOSED Drawings · 30 Nov 2022
  • WEST ELEVATION - PROPOSED Drawings · 30 Nov 2022
  • GROUND FLOOR - EXISTING Drawings · 30 Nov 2022
  • FIRST FLOOR - EXISTING Drawings · 30 Nov 2022
  • SECOND FLOOR - EXISTING Drawings · 30 Nov 2022
  • EAST ELEVATION - EXISTING Drawings · 30 Nov 2022
  • SOUTH ELEVATION - EXISTING Drawings · 30 Nov 2022
  • WEST ELEVATION - EXISTING Drawings · 30 Nov 2022
  • ROOF DETAILS - 01 Drawings · 30 Nov 2022
  • ROOF DETAILS - 02 Drawings · 30 Nov 2022
  • GABLE END/CHIMNEY DETAILS Drawings · 30 Nov 2022
  • WALL DETAILS - 01 Drawings · 30 Nov 2022
  • WALL DETAILS - 02 Drawings · 30 Nov 2022
  • PORCH DETAILS Drawings · 30 Nov 2022
  • WINDOW DETAILS Drawings · 30 Nov 2022
  • NATURE CONSERVATION Consultee Comments · 24 Nov 2022
  • SUSTAINABILITY Consultee Comments · 25 Aug 2022
  • CONSERVATION Consultee Comments · 24 Aug 2022
  • CONSERVATION Consultee Comments · 24 Aug 2022
  • CONSERVATION Consultee Comments · 24 Aug 2022
  • ENVIRONMENTAL HEALTH Consultee Comments · 17 Aug 2022
  • ENVIRONMENTAL HEALTH Consultee Comments · 17 Aug 2022
  • LOCAL HIGHWAY AUTHORITY Consultee Comments · 15 Aug 2022
  • COVER EMAIL Application Information · 10 Aug 2022
  • 118-2 PLANNING RESPONSE STATEMENT REV A.02 Application Information · 04 Aug 2022
  • ARBORICULTURAL IMPACT ASSESSMENT REV A Application Information · 04 Aug 2022
  • FILE COPY OF AMENDMENT LETTER Application Officer Correspondence · 04 Aug 2022
  • LOCATION PLAN Drawings · 04 Aug 2022
  • SITE PLAN Drawings · 04 Aug 2022
  • SITE PLAN Drawings · 04 Aug 2022
  • LOGISTICS PLAN-TPO 4.01 Application Information · 04 Aug 2022
  • PLANNING RESPONSE STATEMENT Drawings · 04 Aug 2022
  • ARBORICULTURAL IMPACT ASSESSMENT REV A Application Survey / Assessment / Statement · 04 Aug 2022
  • EOT REQUEST Extension of Time Request · 22 Jun 2022
  • EXTENSION OF TIME REQUEST Application Information · 01 Jun 2022
  • EOT REQUEST Extension of Time Request · 31 May 2022
  • SUSTAINABILITY Consultee Comments · 31 May 2022
  • CONSERVATION Consultee Comments · 25 May 2022
  • EXTENSION OF TIME Application Information · 19 May 2022
  • EOT REQUEST Extension of Time Request · 18 May 2022
  • LOCAL HIGHWAY AUTHORITY Consultee Comments · 16 May 2022
  • ENVIRONMENTAL HEALTH Consultee Comments · 10 May 2022
  • ACKNOWLEDGEMENT LETTER Application Officer Correspondence · 26 Apr 2022
  • NOTIFIED NEIGHBOURS LIST Neighbour/Consultee Notification List · 26 Apr 2022
  • SITE NOTICE Application Press/Site Notices · 26 Apr 2022
  • SITE NOTICE Application Press/Site Notices · 19 Apr 2022
  • FEE CALCULATION Application Information · 28 Mar 2022
  • APPLICATION FORM - NO PERSONAL INFO Application Information · 28 Mar 2022
  • ATTACHMENT SUMMARY FROM PORTAL Attachment Summary · 28 Mar 2022
  • DOOR SCHEDULE Drawings · 28 Mar 2022
  • PHOTO SHEETS Photographs · 28 Mar 2022
  • WINDOW SCHEDULE Drawings · 28 Mar 2022
  • 21140-D-50-0-P2 - DRAINAGE LAYOUT Drawings · 28 Mar 2022
  • OUTLINE SPECIFICATION Application Information · 28 Mar 2022
  • STRUCTURAL DESIGN METHODOLOGY STATEMENT Application Survey / Assessment / Statement · 28 Mar 2022
  • ENERGY STATEMENT Application Survey / Assessment / Statement · 28 Mar 2022
  • BAT REPORT Application Survey / Assessment / Statement · 28 Mar 2022
  • DESIGN & ACCESS STATEMENT & HERITAGE IMPACT ASSESSMENT Design and Access Statement · 28 Mar 2022
  • STRUCTURAL ASSESSMENT REPORT Application Survey / Assessment / Statement · 28 Mar 2022
  • COVER LETTER Application Information · 28 Mar 2022
  • LANDSCAPE DESIGN Drawings · 28 Mar 2022
  • FIRE STRATEGY REPORT Application Survey / Assessment / Statement · 28 Mar 2022
  • FLOOD RISK ASSESSMENT Application Survey / Assessment / Statement · 28 Mar 2022
  • PLANNING STATEMENT Application Survey / Assessment / Statement · 28 Mar 2022
  • GROUND FLOOR PLAN AS PROPOSED Drawings · 28 Mar 2022
  • FIRST FLOOR PLAN AS PROPOSED Drawings · 28 Mar 2022
  • SECOND FLOOR PLAN AS PROPOSED Drawings · 28 Mar 2022
  • ROOF PLAN AS PROPOSED Drawings · 28 Mar 2022
  • EAST ELEVATION AS PROPOSED Drawings · 28 Mar 2022
  • WEST ELEVATION AS PROPOSED Drawings · 28 Mar 2022
  • SOUTH ELEVATION AS PROPOSED Drawings · 28 Mar 2022
  • NORTH ELEVATION AS PROPOSED Drawings · 28 Mar 2022
  • WEST ELEVATION AS PROPOSED Drawings · 28 Mar 2022
  • CONDITION SURVEY - GROUND FLOOR AS EXISTING Drawings · 28 Mar 2022
  • CONDITION SURVEY - FIRST FLOOR AS EXISTING Drawings · 28 Mar 2022
  • CONDITION SURVEY - SECOND FLOOR AS EXISTING Drawings · 28 Mar 2022
  • CONDITION SURVEY - EAST ELEVATION AS EXISTING Drawings · 28 Mar 2022
  • CONDITION SURVEY - SOUTH ELEVATION AS EXISTING Drawings · 28 Mar 2022
  • CONDITION SURVEY - WEST ELEVATION AS EXISTING Drawings · 28 Mar 2022
  • GROUND FLOOR PLAN AS EXISTING Drawings · 28 Mar 2022
  • FIRST FLOOR PLAN AS EXISTING Drawings · 28 Mar 2022
  • SECOND FLOOR PLAN AS EXISTING Drawings · 28 Mar 2022
  • ROOF PLAN AS EXISTING Drawings · 28 Mar 2022
  • SECTIONAL ELEVATION SE1-SE1 AS EXISTING Drawings · 28 Mar 2022
  • SECTIONAL ELEVATION SE2-SE2 AS EXISTING Drawings · 28 Mar 2022
  • SECTIONAL ELEVATION SE3-SE3 AS EXISTING Drawings · 28 Mar 2022
  • SECTIONAL ELEVATION SE4-SE4 & SE5-SE5 AS EXISTING Drawings · 28 Mar 2022
  • SECTIONAL ELEVATION SE6-SE6 & SE7-SE7 AS EXISTING Drawings · 28 Mar 2022
  • SECTIONAL ELEVATION SE8- SE8 & SE9-SE9 AS EXISTING Drawings · 28 Mar 2022
  • SECTIONAL ELEVATION SE10- SE10 & SE11-SE11 AS EXISTING Drawings · 28 Mar 2022
  • EAST ELEVATION AS EXISTING Drawings · 28 Mar 2022
  • WEST ELEVATION AS EXISTING Drawings · 28 Mar 2022
  • SOUTH ELEVATION AS EXISTING Drawings · 28 Mar 2022
  • SOUTH ELEVATION AS EXISTING Drawings · 28 Mar 2022
  • NORTH ELEVATION AS EXISTING Drawings · 28 Mar 2022
  • WEST ELEVATION AS EXISTING Drawings · 28 Mar 2022
  • ROOF DETAILS HISTORIC HOUSE Drawings · 28 Mar 2022
  • ROOF DETAILS EXTENSION Drawings · 28 Mar 2022
  • GABLE END/ CHIMNEY DETAILS HISTORIC HOUSE Drawings · 28 Mar 2022
  • WALL DETAILS HISTORIC HOUSE Drawings · 28 Mar 2022
  • WALL DETAILS EXTENSION Drawings · 28 Mar 2022
  • PORCH DETAILS Drawings · 28 Mar 2022
  • WINDOW DETAILS Drawings · 28 Mar 2022
  • ELECTRICAL DRAWINGS BROCHURE Application Information · 28 Mar 2022
  • MECHANICAL SERVICES DOMESTIC WATER SERVICES LAYOUT GROUND FLOOR Drawings · 28 Mar 2022
  • MECHANICAL SERVICES HEATING SERVICES LAYOUT GROUND FLOOR Drawings · 28 Mar 2022
  • MECHANICAL SERVICES VENTILATION SERVICES LAYOUT GROUND FLOOR Drawings · 28 Mar 2022
  • MECHANICAL SERVICES DOMESTIC WATER SERVICES LAYOUT FIRST FLOOR Drawings · 28 Mar 2022
  • MECHANICAL SERVICES HEATING SERVICES LAYOUT FIRST FLOOR Drawings · 28 Mar 2022
  • MECHANICAL SERVICES VENTILATION SERVICES LAYOUT FIRST FLOOR Drawings · 28 Mar 2022
  • MECHANICAL SERVICES DOMESTIC WATER SERVICES LAYOUT SECOND FLOOR Drawings · 28 Mar 2022
  • MECHANICAL SERVICES HEATING SERVICES LAYOUT SECOND FLOOR Drawings · 28 Mar 2022
  • MECHANICAL SERVICES VENTILATION SERVICES LAYOUT SECOND FLOOR Drawings · 28 Mar 2022
  • MECHANICAL SERVICES SCHEDULE OF SYMBOLS & ABBREVIATIONS Drawings · 28 Mar 2022
  • SECOND FLOOR PLAN SHOWING STRUCTURE OVER Drawings · 28 Mar 2022
  • FIRST FLOOR PLAN SHOWING STRUCTURE OVER Drawings · 28 Mar 2022
  • GROUND FLOOR PLAN SHOWING STRUCTURE OVER Drawings · 28 Mar 2022
  • GROUND FLOOR PLAN SHOWING STRUCTURE BELOW Drawings · 28 Mar 2022
  • STEEL CONNECTION DETAILS Drawings · 28 Mar 2022
  • ELECTRICAL SERVICES SMALL POWER AND DATA SERVICES LAYOUT GROUND FLOOR Drawings · 28 Mar 2022
  • ELECTRICAL SERVICES FIRE ALARM SERVICES LAYOUT GROUND FLOOR Drawings · 28 Mar 2022
  • ELECTRICAL SERVICES LIGHTING AND FIRE ALARM SERVICES LAYOUT GROUND FLOOR Drawings · 28 Mar 2022
  • ELECTRICAL SERVICES SMALL POWER AND DATA SERVICES LAYOUT FIRST FLOOR Drawings · 28 Mar 2022
  • ELECTRICAL SERVICES FIRE ALARM SERVICES LAYOUT FIRST FLOOR Drawings · 28 Mar 2022
  • ELECTRICAL SERVICES LIGHTING AND FIRE ALARM SERVICES LAYOUT FIRST FLOOR Drawings · 28 Mar 2022
  • ELECTRICAL SERVICES SMALL POWER AND DATA SERVICES LAYOUT SECOND FLOOR Drawings · 28 Mar 2022
  • ELECTRICAL SERVICES FIRE ALARM SERVICES LAYOUT SECOND FLOOR Drawings · 28 Mar 2022
  • ELECTRICAL SERVICES LIGHTING SERVICES LAYOUT SECOND FLOOR Drawings · 28 Mar 2022
  • ELECTRICAL SERVICES LV DISTRIBUTION AND FIRE ALARM SCHEMATIC Drawings · 28 Mar 2022
  • DENVER ID OPTION Drawings · 28 Mar 2022

Watch members (£5 a month) open the document list from here.

Open the documents

What this grant of permission means

Cambridge granted permission on 6 January 2023, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About full applications

A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.

Nearby applications

Within 0.3 miles

  • Ashton House Newnham Road Cambridge Cambridgeshire CB3 9EY

    22/01775/LBC Submitted 28 Mar 2022 50 yards away

    Remove existing rear porch along with small brick structures to the north and south, within the curtilage along with internal alterations. Conversion of existing house to seven bedroom HMO for student accommodation and associated works.

    Granted Heritage and listed buildings Extension 117 docs
    Small domestic
  • Gonville And Caius College Fellows Garden Sidgwick Avenue Cambridge Cambridgeshire

    22/1364/TTCA Submitted 21 Nov 2022 50 yards away

    T403 Weeping Ash-l dead or dying - Fell

    Granted Trees 8 docs
  • Gonville And Caius College Fellows Garden Sidgwick Avenue Cambridge Cambridgeshire

    21/0220/TTCA Submitted 10 Feb 2021 50 yards away

    0028 and 2358 - Limes - Pollard and reduce to 12m in height due to decay in crown. 0027 and 2268 - Limes - Pollard and reduce to 6m in height due to decay in crown. 2357 - Lime - Re-Polllard by approx. 3-4m. 2361 - Lime - Pollard and reduce to 7m in height due to decay in crown. 2779 - Hazel - Coppice. 2365 - Cherry - Remove due to disease and decay and replace with a Cherry tree.

    Split decision Trees 6 docs
  • Darwin College Silver Street Cambridge Cambridgeshire CB3 9EU

    26/03106/S19LB Submitted 14 Aug 2026 50 yards away

    98% historically approved · decision due ~9 Oct

    S19 to vary condition 2 (Approved plans) of listed building consent 24/03581/LBC (Alterations to the fabric of the Hermitage, Newnham Grange, Stevenson Building, Rayne Building and Dining Hall to upgrade thermal performance and facilitate connection to a low carbon heat network.) 1. Removal of the lead clad roof-level water tank: Following detailed technical design, the external roof-mounted water tank is no longer required. Its removal would allow for a simplified and improved roof drainage layout. 2. Addition of an external vent cowl: The inclusion of one single vent on the west elevation to correctly align the drawings with the mechanical services strategy and 3. Alteration to riser overrun height: An increase of approximately 285mm to the height of the riser overruns to facilitate the necessary routing of air handling ductwork from the riser onto the roof plant area.

    Awaiting decision Conditions 23 docs
  • Darwin College Silver Street Cambridge Cambridgeshire CB3 9EU

    24/03580/CONDD Submitted 2 Sep 2025 50 yards away

    Submission of details required by conditions 17 (Foul Water Drainage) and 18 (Surface Water) - partial discharge, Pump House (plant room) Phase 1A of planning permission 24/03580/FUL

    Granted Conditions 8 docs
  • Darwin College Silver Street Cambridge Cambridgeshire CB3 9EU

    24/03581/CONDB Submitted 28 Jul 2026 50 yards away

    Submission of details required by condition 4 (Window Details) of listed building consent 24/03581/LBC

    Granted Conditions Windows or glazing 16 docs

In Cambridge

  • 26/02377/FUL Granted

    5 Davy Road Cambridge Cambridgeshire CB1 3QW

    Two storey front extension, a single storey rear extension (following the removal of the existing side and single storey rear extensions). Conversion of existing roof space following the reconstruction with a raised ridge height, to create 1no 3bed dwelling adjacent to the existing house.

    Received 23 Jun, published by the council 23 Jul 2026 Full applications
  • 26/03042/FUL Granted

    Botanical Gardens, Plant Growth Facility Department Of Plant Science Bateman Street Cambridge Cambridgeshire CB2 1LR

    Installation of a new stand-by Generator and acoustic enclosure at the Sainsbury Laboratory to serve Building B in mains fail conditions.

    Received 11 Aug, published by the council 14 Aug 2026 Full applications
  • 26/03008/FUL Granted

    24 Luard Road Cambridge Cambridgeshire CB2 8PJ

    Demolition of existing dwelling and construction of new 2.5 storey dwelling and associated landscaping

    Received 10 Aug, published by the council 14 Aug 2026 Full applications
  • 26/03002/FUL Granted

    The Pickerel Inn 30 Magdalene Street Cambridge Cambridgeshire CB3 0AF

    Remove existing jumbrellas 2 no. and replace with a new Mirador Pergola to the rear courtyard

    Received 7 Aug, published by the council 14 Aug 2026 Full applications
  • 26/03729/FUL Awaiting decision

    27-28 Bridge Street Cambridge Cambridgeshire CB2 1UJ

    Installation of new shopfront and seating at the rear external court yard with proposed conservatory glass roof.

    Received 2 Oct, published by the council 9 Oct 2026 Full applications