Skip to content
PlanIndex Get alerts
Menu

Planning application

67 - 97A Campkin Road Cambridge Cambridgeshire CB4 2NP

Granted Cambridge 21/01826/S73 Section 73 - Remove/Vary Condition

Works: New dwelling Demolition Several homes

Read from the description, not a valuation. How we read the register

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

S73 to vary conditions 2, 17, 23 and 24 of planning ref: 19/1616/FUL (Demolition of 32no existing flats and garages, and erection of 75no new affordable dwellings, including 4no houses and 71no apartments, a new community facility, car parking, landscaping and associated works)

As published by the council, reference 21/01826/S73

Application record

Reference
21/01826/S73
Type
Section 73 - Remove/Vary Condition
Status
Decided
Decision
Granted As published: Granted Permission
Received
13 Apr 2021
Validated
13 Apr 2021
Decided
16 Nov 2022
Ward
Kings Hedges
Decision by
Committee Decision (Area/Main)
Postcode
CB4 2NP

Site history

Applications at this address on the Cambridge register

This site has had 11 applications since 2020: 11 approved, 0 refused.

  • 21/01826/COND32 Granted

    67 - 97A Campkin Road Cambridge Cambridgeshire CB4 2NP

    Submission of details required by condition 32 (Post construction BRE certificate) of planning permission 21/01826/S73

    Decided 10 Jan 2025 Conditions
  • 19/1616/COND13 Granted

    67 - 97A Campkin Road Cambridge Cambridgeshire CB4 2NP

    Submission of details required by condition 32 (Post construction BRE certificate) of planning permission 21/01826/S73

    Decided 10 Jan 2025 Conditions
  • 19/1616/COND42 Granted

    67 - 97A Campkin Road Cambridge Cambridgeshire CB4 2NP

    Submission of details required by condition 42 (EV Chargers) of planning permission 19/1616/FUL

    Decided 25 Nov 2022 Conditions
  • 21/01666/S74B Granted

    67 - 97A Campkin Road Cambridge Cambridgeshire CB4 2NP

    S74B application to vary condition 12 (construction hours), 13 (delivery and collection hours) and 33 (Traffic Management Plan) of permission 19/1616/FUL to change the approved construction working hours to 08:00 to 21:00 Monday to Friday and 08:00 to 18:00 Saturday for a temporary period of 12/04/2021 to 30/09/2021

    Decided 7 May 2021 Conditions
  • 19/1616/COND9 Granted

    67-97A Campkin Road Cambridge Cambridgeshire CB4 2NP

    Submission of details required for condition 9 (Ecological Enhancement) of planning permission 19/1616/FUL

    Decided 19 Mar 2021 Conditions
  • 19/1616/COND8 Granted

    67-97A Campkin Road Cambridge Cambridgeshire CB4 2NP

    Submission of details required for condition 8 (Green Roof) of planning permission 19/1616/FUL

    Decided 19 Mar 2021 Conditions
  • 19/1616/CONDA Granted

    67 - 97A Campkin Road Cambridge Cambridgeshire CB4 2NP

    Submission of details required by condition 33 - TMP - already discharged, but amended to add Tower crane of planning permission 19/1616/FUL

    Decided 14 Jan 2021 Conditions
  • 19/1616/COND36 Granted

    67 - 97A Campkin Road Cambridge Cambridgeshire CB4 2NP

    Condition 36 - Written Scheme of Investigation (WSI) programme of archaeological work

    Decided 14 Jan 2021 Conditions
  • 19/1616/COND15 Granted

    67 - 97A Campkin Road Cambridge Cambridgeshire CB4 2NP

    Condition 15 - Airborne dust

    Decided 15 Oct 2020 Conditions
  • 19/1616/COND33 Granted

    67 - 97A Campkin Road Cambridge Cambridgeshire CB4 2NP

    Condition 33 - Traffic Management Plan

    Decided 14 Oct 2020 Conditions

Timeline

Dates from the published record

  1. 13 Apr 2021

    Received by Cambridge

  2. 16 Nov 2022

    Decision issued: Granted Permission

  3. 24 Sep 2026

    Added to PlanIndex

Cases linked to this one on the register

  • Application: 19/1616/FUL (Decided)

Documents

Plans, drawings, consultee responses and the officer's report

33 documents on file for this application

  • DECISION NOTICE Application Decision Notice · 16 Nov 2022
  • OFFICER REPORT Application Committee / Delegated Report · 16 Nov 2022
  • CONFIRMATION OF EOT Application Information · 28 Oct 2022
  • CONFIRMATION OF EOT Application Information · 27 Oct 2022
  • COMMITTEE REPORT Application Committee / Delegated Report · 14 Jan 2022
  • AGENT/APPLICANT PUBLIC SPEAKING LETTER Application Officer Correspondence · 04 Jan 2022
  • URBAN DESIGN Consultee Comments · 26 Nov 2021
  • LANDSCAPE OFFICER Consultee Comments · 04 Nov 2021
  • QUALITY & GROWTH Consultee Comments · 15 Jul 2021
  • LLFA Consultee Comments · 24 Jun 2021
  • DRAINAGE Consultee Comments · 14 Jun 2021
  • LOCAL HIGHWAYS AUTHORITY Consultee Comments · 03 Jun 2021
  • ARCH LIAISON OFFICER Consultee Comments · 24 May 2021
  • SITE NOTICE Application Press/Site Notices · 17 May 2021
  • ANGLIAN WATER Consultee Comments · 13 May 2021
  • ACKNOWLEDGEMENT LETTER Application Officer Correspondence · 12 May 2021
  • NOTIFIED NEIGHBOURS LIST Neighbour/Consultee Notification List · 12 May 2021
  • FEE CALCULATION Application Information · 13 Apr 2021
  • APPLICATION FORM - NO PERSONAL INFO Application Information · 13 Apr 2021
  • ATTACHMENT SUMMARY FROM PORTAL Attachment Summary · 13 Apr 2021
  • BLOCK B - ELEVATIONS Drawings · 13 Apr 2021
  • BLOCK C - ELEVATIONS Drawings · 13 Apr 2021
  • BLOCK C - ELEVATIONS MARKED UP CHANGES Drawings · 13 Apr 2021
  • BLOCK B - ELEVATIONS-MARKED UP CHANGES Drawings · 13 Apr 2021
  • BLOCK A - ELEVATIONS Drawings · 13 Apr 2021
  • BLOCK H - SOUTH EAST AND SOUTH WEST ELEVATIONS Drawings · 13 Apr 2021
  • BLOCK H - SOUTH EAST AND SOUTH WEST ELEVATIONS-MARKED UP CHANGES Drawings · 13 Apr 2021
  • BLOCK H - TYPICAL BIKE AND REFUSE STORE Drawings · 13 Apr 2021
  • BLOCK H - TYPICAL BIKE AND REFUSE STORE-MARKED UP CHANGES Drawings · 13 Apr 2021
  • BLOCK A - ELEVATIONS-MARKED UP CHANGES Drawings · 13 Apr 2021
  • BLOCK H - NORTH EAST AND NORTH WEST ELEVATIONS Drawings · 13 Apr 2021
  • BLOCK H - NORTH EAST AND NORTH WEST ELEVATIONS-MARKED UP CHANGES Drawings · 13 Apr 2021
  • 12530 REPORT 3 - COMMUNITY CENTRE NIA Application Information · 13 Apr 2021

Watch members (£5 a month) open the document list from here.

Open the documents

What this grant of permission means

Cambridge granted permission on 16 November 2022, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About amendment applications

An amendment application makes limited changes to a permission that already exists; anything beyond modest adjustment needs a fresh application. More in our guide to planning application types.

Nearby applications

Within 0.3 miles

In Cambridge

  • 23/04687/NMA2 Awaiting decision

    Barnwell Local Centre Barnwell Road Cambridge Cambridgeshire CB5 8RG

    Non material amendment on application 23/04687/FUL to: 1 - Community Centre Hall (Block ABC east elevation) single exit doors within garden space amended to double doors to comply with fire strategy. 2 - Community Centre (Block ABC west elevation) 1no. window to one to one room at request of Cambridge City Council due to operational requirements. 3 - Community Centre (Block ABC link roof) 1no. Skylight introduced for access and natural light. 4 - Community Centre (Block ABC) Glazing to garden wall omitted for hit and miss brick detail at request of Cambridge City Council due to vandalism and maintenance concerns. 5 - Community Centre (Garden) Ramp omitted due to appropriate existing levels allowing level access. 6 - All Blocks (Elevations) 825mm reduction in parapet height to accommodate appropriate technical floor and roof build ups, and service voids, which would have otherwise increased overall building height. 7 - Block ABC (North and East Elevations) 3no. RWP's introduced on both elevations because loadings on roof are too great to comply with warranty provider requirements if falls only go from front to back. additionally higher parapets would have been required contradicting above change. 8 - Block D (North elevation) Plant room door omitted as no longer a requirement for electrical plant room. 9 - Block A (South elevation) M4(3) slopes introduced to patios of units to allow easier wheelchair access at request of Cambridge City Council

    Received 6 Oct, published by the council 9 Oct 2026 Amendments
  • 26/02814/NMA1 Awaiting decision

    115 Wadloes Road Cambridge Cambridgeshire CB5 8PF

    Non material amendment on application 26/02814/HFUL to the ridge line of the building on the original plan from mainly E/W to N/S on the new plan and the eaves on the new plan are 90mm higher

    Received 6 Oct, published by the council 9 Oct 2026 Amendments
  • 23/04732/NMA6 Awaiting decision

    Devonshire Gardens Devonshire Road Cambridge CB1 2BJ

    Non material amendment on application 23/04732/S73 for changes to the Permitted Scheme comprising the omission of the balustrades on the western elevation of Block F&G parapet gutters.

    Received 5 Oct, published by the council 8 Oct 2026 Amendments
  • 26/03739/S73 Awaiting decision

    98 Riverside Cambridge Cambridgeshire CB5 8HN

    S73 to vary condition 2 (approved plans) of ref: 26/01087/HFUL (Part single, part two storey side extension with first floor terrace and sedum roof. Roof extension including rear dormer, following demolition of existing carport building and separate lean-to structures. Alterations to fenestration.) to include repositioning of three walls to align with existing structure, patio door changed to window, addition of rooflights, metal balustrade instead of glass, and amended attic windows.

    Received 2 Oct, published by the council 9 Oct 2026 Amendments
  • 24/04593/NMA1 Granted

    12 Aylestone Road Cambridge Cambridgeshire CB4 1HF

    Non material amendment on application 24/04593/FUL to include additional 2no projecting solar shade louvre installation to the rear elevation.

    Received 21 Aug, published by the council 11 Sep 2026 Amendments