Planning application

20/05205/AEA

Land Off Bartlow Road Castle Camps Cambs CB21 4SX

Granted Cambridge Additional Environmental Approval

Proposal

To extend the implementation deadline of planning permission S/4299/17/RM dated 18 April 2018, as specified within Condition 3 of planning permission S/0415/17/OL, until 1 May 2021, under section 93A of the Town and Country Planning Act 1990.

As published by the council, reference 20/05205/AEA

Timeline

Dates from the published record

  1. 15 Dec 2020

    Received by Cambridge

  2. 17 Dec 2020

    Validated

    Checked as complete and ready for consideration.

  3. 23 Dec 2020

    Decision issued: Granted Permission

  4. 23 Jul 2026

    Added to PlanIndex

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About this record

Reading the register

This page mirrors an entry on the statutory planning register that Cambridge is required to keep. The published feed for this record does not state which type of application it is, which is common for older entries and for some council systems; the register entry on the council portal will say, alongside the case officer and any consultation dates.

Every planning application follows the same broad path: submission, validation, publicity, then a decision by officers or committee. Our guide to planning application types explains the common types and what each can approve.

Nearby applications

Within 500 metres

  • S/4299/17/CONDA Decided

    Land Off Bartlow Road Castle Camps Cambs CB21 4SX

    Submission of details required by condition 3 (Materials) of planning permission S/4299/17/RM

    22 Jul 2020 0m away Conditions
  • S/4469/17/CONDA Decided

    Land South Of Bartlow Road Castle Camps CB21 4SY

    Submission of details required by conditions 5 (Surface water Drainage) and 6 (Foul water drainage) of planning permission S/4469/17/OL

    28 Jul 2020 115m away Conditions
  • 20/2368/TTCA Granted

    Tree On The Green Opp Potash Cottage The Green Castle Camps Cambridge Cambridgeshire CB21 4TA

    Oak O1 to crown lift to 2.5m, clear Potash Cottage power line by 0.5m, clear telegraph pole and other power or phone lines by 1m, and reduce back the branches overhanging the highway/public footpath to the grass edge. (AMENDED)

    23 Nov 2020 349m away Trees
  • 26/0689/TTCA Awaiting decision

    The Green Castle Camps Cambridgeshire

    T1: Oak - 3m reduction of the canopy all round. Remove deadwood and damaged branches and epicormic growth. Prune branches so they are not rubbing on power lines running through the canopy. Remove the lowest limb of the tree back to the trunk.

    7 Jul 2026 352m away Trees