Skip to content
PlanIndex Get alerts
Menu

Planning application

20/05074/TELNOT

Land At East Farm Bramley Avenue Melbourn Royston Cambridgeshire SG8 6HG

Decided Cambridge Telecommunications Notifications (Reg 5)

Proposal

Installation of 2 x 9m wooden poles (7.2m above ground)

As published by the council, reference 20/05074/TELNOT

Timeline

Dates from the published record

  1. 9 Dec 2020

    Received by Cambridge

  2. 16 Dec 2020

    Decision issued: Telecommunication Notification Lodged

  3. 23 Jul 2026

    Added to PlanIndex

After the decision

The process from here

The council has decided this application; the published outcome sits in the record above and the decision notice on the council portal carries the detail, including any conditions.

If permission was granted, work must normally begin within three years of the decision. If it was refused, the applicant can appeal within the statutory time limit or submit a revised scheme.

About telecoms applications

How this application type works

Telecommunications applications cover masts, antennas and cabinets, most of which come forward as prior approval cases under permitted development rules. The council typically has 56 days to consider siting and appearance only. The need for the network itself is treated as established, so objections carry most weight where they address visual impact or siting.

More on telecoms applications in our guide

Nearby applications

Within 500 metres

  • 20/03585/FUL Granted

    29 And 31 Fordham Way Melbourn Royston Cambridgeshire SG8 6JA

    Demolition of an existing single storey porch structure and the construction of a new 2 storey front extension to comprise a porch area and bedroom extension.

    25 Aug 2020 234m away Full applications
  • 20/04723/S74B Granted

    Land To The East Of New Road Melbourn Cambridgeshire

    S74B application to vary condition 20 of permission S/2791/14/OL (residential development of up to 199 dwellings plus a care home of up to 75 beds new vehicular and pedestrian accesses from New Road public open space and a landscape buffer) to change the approved construction working hours to 06:30 - 21:00 Monday - Friday, 07:30 - 17:00 Saturdays, with no external construction works being carried out outside of the hours of 07:00-18:00 Monday to Friday and 07:30-17:00 on Saturdays and no Sunday or Bank Holiday working for a temporary period of 01/12/2020 to 31/03/2021.

    18 Nov 2020 360m away Conditions
  • 26/01339/FUL Withdrawn

    42 Medcalfe Way Melbourn Cambridgeshire SG8 6HU

    Erection of 2no self-build/custom build. two and a half storey 3bed dwellings to side garden

    7 Apr 2026 415m away Full applications
  • 26/01547/HFUL Granted

    4 Barham Court Melbourn Cambridgeshire SG8 6EW

    Single storey rear extension including replacement roof and raising wall height of existing rear element. Replacement of rear window with door.

    23 Apr 2026 470m away Householder

In Cambridge

  • 26/02836/TELNOT Awaiting decision

    Land Opp 1 Linden Close Cambridge Cambridgeshire CB4 3JU

    Installation of 1 No. 9M light wooden pole.

    27 Jul 2026 Telecoms
  • 26/02732/TELNOT Awaiting decision

    Marque House 143 Hills Road Cambridge Cambridgeshire

    Installation of 12 No. antennas fixed to 3 No. new support poles (4 No. antennas proposed on each pole), the installation of 2 No. transmission dishes and ancillary equipment on the rooftop of Marque House. The proposal also involves the installation of 2 No. equipment cabinets on new grillage on the rooftop and ancillary development thereto.

    20 Jul 2026 Telecoms
  • 26/02702/TELNOT Awaiting decision

    Elizabeth House 1 High Street East Chesterton Cambridge Cambridgeshire CB4 1NQ

    Installation of 6no antennas and 4no transmission dishes fixed to 3no rooftop support poles attached to the plantroom wall. Installation of 2no equipment cabinets on new steel grillage on the rooftop and ancillary development.

    15 Jul 2026 Telecoms
  • 26/02477/TELNOT Awaiting decision

    Newnham Mill Newnham Road Cambridge Cambridgeshire CB3 9EY

    Install approx 10m of 2BFT PVC under the false ceiling to the comms cabinet in the adjacent room and 5m PIGTAIL.

    30 Jun 2026 Telecoms
  • 26/02260/TELNOT Awaiting decision

    86 Huntingdon Road Cambridge Cambridgeshire CB3 0HH

    Installation of 1no 9m light wooden pole.

    15 Jun 2026 Telecoms