Planning application
191 Cambridge Science Park Milton CB4 0GW
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Alterations to Loading Bay 3 to provide a wider opening and provision of a weather proof enclosure for unloading vehicles.
As published by the council, reference 20/04775/FUL
Application record
- Reference
- 20/04775/FUL
- Type
- Full Application
- Status
- Decided
- Decision
- Granted As published: Granted Permission
- Received
- 19 Nov 2020
- Validated
- 19 Nov 2020
- Decided
- 21 Jan 2021
- Ward
- Milton & Waterbeach
- Parish
- Milton CP
- Decision by
- Delegated Decision
- Postcode
- CB4 0GW
Timeline
Dates from the published record
-
19 Nov 2020
Received by Cambridge
-
21 Jan 2021
Decision issued: Granted Permission
-
23 Jul 2026
Added to PlanIndex
Documents
Plans, drawings, consultee responses and the officer's report
18 documents on file for this application
- DECISION NOTICE
- EMAIL RE EXTENSION OF TIME
- MILTON PARISH
- LOCAL HIGHWAYS AUTHORITY
- ENVIRONMENTAL HEALTH
- SITE NOTICE
- ACKNOWLEDGEMENT LETTER
- NOTIFIED NEIGHBOURS LIST
- APPLICATION FORM - NO PERSONAL INFO
- FEE CALCULATION
- ATTACHMENT SUMMARY FROM PORTAL
- DESIGN AND ACCESS STATEMENT
- SITE LOCATION PLAN
- EXTISTING PLAN
- PROPOSED PLAN
- EXISTING AND PROPOSED ROOF PLANS
- EXISTING ELEVATIONS AND SECTIONS
- PROPOSED ELEVATIONS AND SECTIONS
Watch members (£5 a month) open the document list from here.
Open the documentsWhat this grant of permission means
Cambridge granted permission on 21 January 2021, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About full applications
A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
191 Cambridge Science Park Milton Cambridgeshire CB4 0GW
Erection of two-storey 2,145.2 sqm (GIA) extension to the north-west of the existing building to provide a new filling and packaging hall (B2 and B8 uses) with first-floor specialist building services plant, enclosed link to the existing warehouse at ground level and roof-mounted solar photovoltaics, along with installation of external plant, relocation of external recycling compound, new groundsman store, alterations to existing car park, new landscaping scheme and associated external works.
Granted Full applications Extension 84 docs -
191 Cambridge Science Park Milton Road Cambridge Cambridgeshire CB4 0GW
Submisssion of details required by condition 6 (Surface Water Drainage) of planning permission 25/00113/FUL.
Granted Conditions 17 docs -
191 Cambridge Science Park Milton Road Cambridge Cambridgeshire CB4 0GW
Request for an EIA Screening Opinion under Regulation 6 of the Town and Country Planning (Environmental Impact Assessment) Regulations 2017 for 191 Cambridge Science Park.
Decided Outline 17 docs -
194 Cambridge Science Park Milton Road Cambridge Cambridgeshire CB4 0AB
79% historically approved · decision due ~30 Nov
Installation of a 230 kWp solar canopy on a car port roof for renewable energy generation and on-site consumption at Raspberry Pi.
Awaiting decision Prior approval 12 docs -
194 Cambridge Science Park Milton Cambridgeshire CB4 0AB
Installation of a roof mounted 83kW Photovoltaic array with a 66kW inverter over two levels and in three different areas.
Granted Prior approval 19 docs -
Land In The North West Part Of The St Johns Innovation Park Cowley Road Cambridge Cambridgeshire CB4 0WS
Non Material Amendment of planning permission 20/03524/FUL for details of location of southern access road lighting columns, and amendment to southern access of St Johns Innovation Park and Cowley Road.
Granted Amendments 32 docs
Other full applications
In Cambridge
-
26/02377/FUL Granted
5 Davy Road Cambridge Cambridgeshire CB1 3QW
Two storey front extension, a single storey rear extension (following the removal of the existing side and single storey rear extensions). Conversion of existing roof space following the reconstruction with a raised ridge height, to create 1no 3bed dwelling adjacent to the existing house.
-
26/03042/FUL Granted
Botanical Gardens, Plant Growth Facility Department Of Plant Science Bateman Street Cambridge Cambridgeshire CB2 1LR
Installation of a new stand-by Generator and acoustic enclosure at the Sainsbury Laboratory to serve Building B in mains fail conditions.
-
26/03008/FUL Granted
24 Luard Road Cambridge Cambridgeshire CB2 8PJ
Demolition of existing dwelling and construction of new 2.5 storey dwelling and associated landscaping
-
26/03002/FUL Granted
The Pickerel Inn 30 Magdalene Street Cambridge Cambridgeshire CB3 0AF
Remove existing jumbrellas 2 no. and replace with a new Mirador Pergola to the rear courtyard
-
26/03729/FUL Awaiting decision
27-28 Bridge Street Cambridge Cambridgeshire CB2 1UJ
Installation of new shopfront and seating at the rear external court yard with proposed conservatory glass roof.