Planning application
1 Adkins Corner Perne Road Cambridge CB1 3RU
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Change of use of unit 3 from A1/A2 (retail /financial & professional use) to sui generis (hot food takeaway/restaurant) and installation of external extract duct and AC unit.
As published by the council, reference 20/04103/FUL
Application record
- Reference
- 20/04103/FUL
- Type
- Full Application
- Status
- Decided
- Decision
- Granted Permission
- Received
- 5 Oct 2020
- Validated
- 14 Oct 2020
- Decided
- 18 Mar 2021
- Ward
- Coleridge
- Decision by
- Committee Decision (Area/Main)
- Postcode
- CB1 3RU
Timeline
Dates from the published record
-
5 Oct 2020
Received by Cambridge
-
14 Oct 2020
Validated
Checked as complete and ready for consideration.
-
18 Mar 2021
Decision issued: Granted Permission
-
3 Sep 2026
Added to PlanIndex
Who's behind it
Company information only, from the register and Companies House
Agent on file
33 applications on PlanIndex · across 5 councils · 100% granted
Trade members see who it is, their full track record, and every application they have filed.
See who's behind itDocuments
Plans, drawings, consultee responses and the officer's report
43 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat a grant of permission means
The process from here
Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.
Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
332-334A Cherry Hinton Road Cambridge Cambridgeshire CB1 8AZ
Change of use of a single bedroom flat to an additional dental treatment room
Granted Full applications 23 docs -
349 Cherry Hinton Road Cambridge CB1 8DB
Non material amendment of planning permission 20/01293/FUL (Proposed conversion and extension of an HMO to form six self-contained flats (5 x 1 bedroom units and 1 x 2 bedroom unit)) for addition of entrance doors and obscure flazed window, in-fill of existing undercroft, alterations to front bay window design and change of front and side elevations from brick to render finish.
Withdrawn Amendments New dwelling Extension +1 7 docs -
The Paddocks 347 Cherry Hinton Road Cambridge Cambridgeshire CB1 8DH
EIA Screening Opinion under the Town and Country Planning (Environmental Impact Assessment) Regulations 2017 for the redevelopment of the existing Paddocks Business Centre for new commercial development in Use Class E(g).
Decided Outline 12 docs -
46 Perne Road Cambridge Cambridgeshire CB1 3RT
Non material amendment on 22/05049/FUL for bricks to be replaced with K render and Dormer cladding to be replaced by roof tiles
Refused Amendments Loft or dormer Roofing 10 docs -
The Paddocks 347 Cherry Hinton Road Cambridge Cambridgeshire CB1 8DH
93% historically approved · decision due ~9 Oct
Removal of 17m phase 4 pole and replacement with 18m phase 7.2 pole supporting associated telecoms apparatus and a wraparound cabinet, internal cabin works, ancillary development.
Awaiting decision Telecoms 7 docs -
364 Cherry Hinton Road Cambridge Cambridgeshire CB1 8BA
T2 - Weeping Golden Willow (Salix x sepulcralis Chrysocoma) - Recommendations 1: Crown lift to 3.5m all round, removing long pendulous branches back to primary limb where appropriate to create desired clearance. Remove all significant deadwood and hanging branches greater than 25mm in diameter and/or 500mm in length. Recommendations 2: Crown reduce/lift to create a 2.5m clearance from adjacent building . Reason for works: to provide sufficient clearance from adjacent property and to allow free access for car parking and for pedestrians on Wulfstan way. T3 - Norway Maple (Acer platanoides) - Recommendations 2: Option 2 (Remove and replace): Remove tree to ground level, grind stump and plant suitable replacement(s) - species yet to be determined. Reason for works: Tree is considered to in terminal state of decline, offering minimal amenity value with approx 5 years safe useful life expectancy left. Tree removal considered to be in line with good arborcultural practice.
Granted Trees 9 docs
Other full applications applications
In Cambridge
-
26/03345/FUL Awaiting decision
Robinson College Grange Road Cambridge Cambridgeshire CB3 9AN
Installation of 6no condenser units on flat roof of G-Staircase and removal of existing ground level air handling unit enclosure from College gardens.
-
26/03300/FUL Awaiting decision
St Johns College Playing Field Grange Road Cambridge Cambridgeshire CB3 0EE
Demolition of existing sports pavilion and car park and construction of a replacement sports pavilion with new pedestrian access from Madingley Road, associated works and landscaping.
-
26/03280/FUL Awaiting decision
7 Thorleye Road Cambridge Cambridgeshire CB5 8NF
Erection of an ancillary outbuilding to provide flexible communal accommodation for HMO residents at 7 Thorleye Road.
-
26/02124/FUL Granted
1-3 Flat Brookfields Cambridge Cambridgeshire CB1 3NW
Retrospective installation of Security roller Shutters to front and side elevations.
-
26/02560/FUL Granted
Memorial Court Clare College Queens Road Cambridge Cambridgeshire CB3 9AJ
Provision of new ASHP plant on the site of the present skip and bin store, relocation of bin store to NE corner of site, associated cabling and landscaping works.