Skip to content
PlanIndex Get alerts
Menu

Planning application

Car Park K2 Addenbrookes Hills Road Cambridge Cambridgeshire

Granted Cambridge 20/03101/FUL Full Application

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Installation of new single storey modular building located in existing car park K2, to accommodate a new Infusion Suite. Works include remodelled access for the Fire services, upgrading the surface of the courtyard to take fire service access and relocation of the bicycle store.

As published by the council, reference 20/03101/FUL

Application record

Reference
20/03101/FUL
Type
Full Application
Status
Decided
Decision
Granted Permission
Received
16 Jul 2020
Validated
16 Jul 2020
Decided
30 Sep 2020
Ward
Queen Ediths
Decision by
Delegated Decision

Site history

Applications at this address on the Cambridge register

This site has had 2 applications since 2020: 1 approved, 0 refused.

  • 20/03101/COND5 Decided

    Car Park K2 Addenbrookes Hills Road Cambridge Cambridgeshire

    Submission of details required by condition 5 (Accessible Parking Provision) of planning permission 20/03101/FUL

    Decided 19 Nov 2020 Conditions

Timeline

Dates from the published record

  1. 16 Jul 2020

    Received by Cambridge

  2. 30 Sep 2020

    Decision issued: Granted Permission

  3. 9 Sep 2026

    Added to PlanIndex

Who's behind it

Company information only, from the register and Companies House

Agent on file, an architecture practice registered in Norwich

25 applications on PlanIndex · across 6 councils · 100% granted

Trade members see who it is, their full track record, and every application they have filed.

See who's behind it

Documents

Plans, drawings, consultee responses and the officer's report

45 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What this grant of permission means

Cambridge granted permission on 30 September 2020, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About full applications

A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.

Nearby applications

Within 500 metres

  • Car Park K2 Addenbrookes Hills Road Cambridge Cambridgeshire

    20/03101/COND5 Submitted 23 Oct 2020 0m away

    Submission of details required by condition 5 (Accessible Parking Provision) of planning permission 20/03101/FUL

    Decided Conditions 6 docs
  • Grantchester House Adrian Way Cambridge Cambridgeshire CB2 0SQ

    24/03421/TELNOT Submitted 12 Sep 2024 69m away

    Installation of 6no antenna apertures and 4no 600mm diameter transmission dishes along with 4no equipment cabinets at roof level and ancillary development thereto.

    Decided Telecoms 12 docs
  • Cambridge University Hospitals BU12 Grantchester House Adrian Way Cambridge Cambridgeshire CB2 0SQ

    26/01544/FUL Submitted 22 Apr 2026 72m away

    Installation of 8 No. louvres at each storey level across 14 No. storeys, resulting in 112 No. new louvres in total across the facade of the building to service the new mechanical ventilation system to be provided to each cluster of flats at each floor level.

    Granted Full applications New dwelling 23 docs
  • RSC 20 Addenbrooke's Hospital Hills Road Cambridge CB2 0QQ

    24/02479/S73 Submitted 1 Jul 2024 122m away

    S73 to vary conditions 1 (Time), 2 (Restoration of Land) and 3 (drawings) of ref: 21/02528/S73 (Retention and continued use of Regional Surge Centre 20 (RSC 20), ancillary buildings and infrastructure constructed pursuant to planning permission granted under Schedule 2, Part 12 A, Class A of the Town and Country Planning (General Permitted Development) (England) Order 2015 (as amended) without compliance with conditions A.2. (b) (time period) and condition A.2(c) (use of land) of that planning permission).

    Granted Amendments 18 docs
  • Buildings BU25 And BU33 Addenbrookes Hills Road Cambridge Cambridgeshire

    24/03528/FUL Submitted 19 Sep 2024 185m away

    Installation of a new, repositioned and replacement plant to Buildings 25 and 33 (BU25 and BU33) including upgraded plant deck, new plant room, means of access and egress, and associated infrastructure.

    Granted Full applications 27 docs
  • Wellcome Trust Mrc Building, Hutchinson Hills Road Cambridge Cambridgeshire CB2 0XZ

    24/03491/FUL Submitted 17 Sep 2024 226m away

    Alteration and ground floor extension of the Hutchison Building situated on the Addenbrookes Hospital Island Site for the Early Cancer Institute (ECI) and the University of Cambridge.

    Granted Full applications Extension 50 docs

In Cambridge

  • 26/02201/FUL Granted

    57-60 Bateman Street Cambridge Cambridgeshire CB2 1LR

    Installation of external surfacing for play area, boundary fencing, netting, external lighting and associated works

    11 Jun 2026 Full applications
  • 26/02572/FUL Granted

    146 Cherry Hinton Road Cambridge Cambridgeshire CB1 7AJ

    Retrospective installation of 4No. non illuminated and 1No. illuminated display signage.

    7 Jul 2026 Full applications
  • 26/02160/FUL Granted

    The Perse Upper School Hills Road Cambridge Cambridgeshire CB2 8QF

    Relocation of existing door to rifle range and the installation of an additional door on the opposite side of the building.

    9 Jun 2026 Full applications
  • 26/03345/FUL Awaiting decision

    Robinson College Grange Road Cambridge Cambridgeshire CB3 9AN

    Installation of 6no condenser units on flat roof of G-Staircase and removal of existing ground level air handling unit enclosure from College gardens.

    2 Sep 2026 Full applications
  • 26/02494/FUL Granted

    Eden Baptist Chapel 1 Fitzroy Street Cambridge Cambridgeshire CB1 1ER

    Removal of 2 No. existing gas boilers from the internal plant room and replace with 4 No. air source heat pumps on the flat roof at the rear of the building and the re-purpose of the plant room as additional worship space.

    1 Jul 2026 Full applications