Planning application
28 Highworth Avenue Cambridge Cambridgeshire CB4 2BG
Works: Extension Loft or dormer Small domestic
Read from the description, not a valuation. How we read the register
Withdrawn before a decision, so it carries no planning weight. A revised scheme can be submitted at any time.
Proposal
Part two storey, part single storey rear extensions and roof extension incorporating rear dormer.
As published by the council, reference 10/0545/FUL
Application record
- Reference
- 10/0545/FUL
- Type
- Full Application
- Status
- Withdrawn
- Decision
- Withdrawn
- Received
- 24 Jun 2010
- Validated
- 24 Jun 2010
- Decided
- 4 Nov 2011
- Ward
- West Chesterton
- Parish
- Accurate
- Postcode
- CB4 2BG
Timeline
Dates from the published record
-
24 Jun 2010
Received by Cambridge
-
4 Nov 2011
Decision issued: Withdrawn
-
17 Nov 2026
Added to PlanIndex
Documents
27 documents on file for this application
A planning file usually holds the application form, the consultee responses, the officer's report and the decision notice.
Watch members (£5 a month) open the document list from here.
Open the documentsWorking a patch? Trade sends you every new job in your area each morning. 14 days free.
What withdrawal means
The applicant withdrew this application before Cambridge decided it, and is free to submit a revised scheme at any time. More in our guide to what happens after a planning decision.
About full applications
A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
41 Highworth Avenue Cambridge Cambridgeshire CB4 2BQ
Demolition of existing rear extensions and erection of part two-storey extension part single storey extension to the rear.
Small domestic -
10 Highworth Avenue Cambridge CB4 2BG
Alternation to fenestration to rear and side, single storey side extension and loft conversion.
Small domestic -
46 Highworth Avenue Cambridge Cambridgeshire CB4 2BG
Two storey rear extension and alterations to fenestration
Granted Householder Extension Windows or glazing 12 docsDomestic -
45 Highworth Avenue Cambridge Cambridgeshire CB4 2BQ
Residential redevelopment comprising two detached dwellings to the rear with garages on the site frontage along with cycle parking and associated infrastructure following demolition of existing buildings on site.
-
45 Highworth Avenue Cambridge CB4 2BQ
Residential redevelopment comprising three link detached dwellings to the rear and one detached dwelling on the site frontage along with car and cycle parking and associated infrastructure following demolition of existing building on the site.
Refused Full applications New dwelling Demolition 46 docsDomestic -
17 Highworth Avenue Cambridge Cambridgeshire CB4 2BQ
Hip to gable loft conversion with dormer windows to rear.
Domestic
Other full applications
In Cambridge
-
26/03353/FUL Granted
13 - 15 Tillyard Way Cambridge Cambridgeshire CB1 8QT
Roof extension to 13 and 15 Tillyard Way, including raising of ridge heights, rear dormers and front roof lights. Alteration of roof to previously approved rear extension of 15 Tillyard Way from pitched roof to green flat roof.
-
26/03544/FUL Refused
2 Albrach Court Buchan Street Cambridge Cambridgeshire CB4 2ZP
Installation of 1no. external air-conditioning unit and 3no. refrigeration condensing units to the south-east elevation.
-
26/01748/FUL Granted
17-19 Petty Cury Cambridge Cambridgeshire CB2 3NE
Replacement of existing shopfront.
-
26/03505/FUL Granted
Shared Facilities Hub J J Thomson Avenue Cambridge Cambridgeshire CB3 0US
Enclosure of existing staff cycle area to provide storage for catering and commercial uses, installation of new staff cycle spaces, installation of fencing to secure rear area, installation of vehicle barrier to service yard area, installation of click and collect lockers for library books/returns and associated works.
-
26/01125/FUL Refused
84A Water Street Cambridge Cambridgeshire CB4 1PA
Change of use of existing boatyard to residential, and demolition of existing boathouse followed by installation of a tethered self-build/custom build houseboat and associated works.