Skip to content
PlanIndex Get alerts
Menu

Planning application

22/01277/FUL

3-5 Church Lane And 96 Commercial Street Brighouse Calderdale HD6 1AT

Granted Calderdale Full Application

Proposal

Remodeling of existing accommodation to create an additional 3 self contained flats

As published by the council, reference 22/01277/FUL

Timeline

Dates from the published record

  1. 24 Nov 2022

    Received by Calderdale

  2. 14 Dec 2022

    Validated

    Checked as complete and ready for consideration.

  3. 13 Nov 2025

    Decision issued: Permit

  4. 22 Jul 2026

    Added to PlanIndex

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • 26/00363/FUL Awaiting decision

    Land At Rear Of 51 Commercial Street Brighouse Calderdale

    Construction of a retail unit

    21 Apr 2026 66m away Full applications
  • 20/01451/FUL Granted

    47 Commercial Street Brighouse Calderdale HD6 1AF

    Change of use from a bookmaker (sui generis) to a hot food takeaway (sui generis) with internal and external alterations

    27 Nov 2020 73m away Full applications
  • 21/10001/ADV Granted

    47 Commercial Street Brighouse Calderdale HD6 1AF

    Two internally illuminated fascia panel signs & two internally illuminated projecting signs

    8 Jan 2021 73m away Advertising
  • 26/00478/COU Awaiting decision

    68 Commercial Street Brighouse Calderdale HD6 1AQ

    Change of use of vacant ground floor area within tanning salon (Class E) to facilitate an extension to Adult Gaming Centre (Sui Generis)

    22 May 2026 105m away Full applications
  • 23/00829/DISC5 Awaiting decision

    Brighouse Market Ship Street Brighouse HD6 1JX

    Submission of information to discharge conditions 12, 14 and 15 on planning application 23/00829/LAA

    17 Oct 2025 151m away Conditions
  • 23/00829/DISC4 Decided

    Brighouse Market Ship Street Brighouse Calderdale HD6 1JX

    Submission of information to discharge condition 13 on planning application 23/00829/LAA

    3 Apr 2025 151m away Conditions

In Calderdale

  • 26/00386/FUL Granted

    1 George Square Halifax Calderdale HX1 1HF

    Installation of defibrillator and bleed kit cabinets to external wall of Nationwide Building Society

    28 Apr 2026 Full applications
  • 26/00412/FUL Granted

    D Mill Dean Clough Mills Dean Clough Halifax Calderdale

    Alterations and Change of Use of part of the 3rd Floor of D Mill Class (E(g)(i)) to teaching accommodation Class (F1)

    6 May 2026 Full applications
  • 26/00299/FUL Granted

    Car Park Of The Halifax Academy Wellesley Park Gibbet Street Halifax Calderdale

    The installation of 1 x Air Source Heat Pump onto existing car park, with acoustic & visual screening.

    30 Mar 2026 Full applications
  • 26/00183/FUL Refused

    2 Spring Hall Gardens Halifax Calderdale HX2 0BT

    No.2 - two storey side and single storey rear extensions, dormers to front and rear. No.4 - single storey rear extension, dormers to front and rear.

    27 Feb 2026 Full applications
  • 25/01247/FUL Granted

    Waterside Works Waterside Halifax Calderdale HX3 9BX

    Demolition of existing building and associated to tanks to be replaced with new purpose built Industrial Unit

    8 Dec 2025 Full applications