Skip to content
PlanIndex Get alerts
Menu

Planning application

20/01063/COU

Ground Floor Unit 1 Croft Mill Albert Street Hebden Bridge Calderdale HX7 8AH

Granted Calderdale Change of Use

Proposal

Change of use from Health Services (Use Class E(e)) to Retail (Use Class E(a))

As published by the council, reference 20/01063/COU

Timeline

Dates from the published record

  1. 14 Sep 2020

    Received by Calderdale

  2. 8 Dec 2020

    Validated

    Checked as complete and ready for consideration.

  3. 15 Mar 2021

    Decision issued: Permit

  4. 30 Jul 2026

    Added to PlanIndex

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • 26/00207/FUL Awaiting decision

    Crossley Mill Childrens Centre New Road Hebden Bridge Calderdale HX7 8AD

    New three storey detached childcare facility in association with Crossley Mill Nursery.

    6 Mar 2026 43m away Full applications
  • 26/00224/LBC Granted

    Southcliffe House Commercial Street Hebden Bridge Calderdale HX7 8AX

    Walling up of internal kitchen door opening to create two separate dwellings. (Listed Building Consent)

    12 Mar 2026 92m away Heritage and listed buildings
  • 26/00223/FUL Granted

    Southcliffe House Commercial Street Hebden Bridge Calderdale HX7 8AX

    Walling up of internal kitchen door opening to create two separate dwellings.

    12 Mar 2026 93m away Full applications
  • 21/22009/TCA Granted

    Hope Baptist Church Hope Street Hebden Bridge Calderdale HX7 8AD

    Prune and fell trees (Tree in Conservation Area)

    27 Jan 2021 97m away Trees
  • 20/22087/TCA Granted

    Southcliffe House Commercial Street Hebden Bridge West Yorkshire HX7 8AX

    Prune one tree and remove three trees (Tree in a Conservation Area)

    15 Sep 2020 99m away Trees
  • 19/22077/TCA Granted

    3 Garden Street Hebden Bridge West Yorkshire HX7 8AQ

    Remove saplings (Tree in a Conservation Area)

    23 Dec 2019 115m away Trees

In Calderdale

  • 26/00386/FUL Granted

    1 George Square Halifax Calderdale HX1 1HF

    Installation of defibrillator and bleed kit cabinets to external wall of Nationwide Building Society

    28 Apr 2026 Full applications
  • 26/00412/FUL Granted

    D Mill Dean Clough Mills Dean Clough Halifax Calderdale

    Alterations and Change of Use of part of the 3rd Floor of D Mill Class (E(g)(i)) to teaching accommodation Class (F1)

    6 May 2026 Full applications
  • 26/00299/FUL Granted

    Car Park Of The Halifax Academy Wellesley Park Gibbet Street Halifax Calderdale

    The installation of 1 x Air Source Heat Pump onto existing car park, with acoustic & visual screening.

    30 Mar 2026 Full applications
  • 26/00183/FUL Refused

    2 Spring Hall Gardens Halifax Calderdale HX2 0BT

    No.2 - two storey side and single storey rear extensions, dormers to front and rear. No.4 - single storey rear extension, dormers to front and rear.

    27 Feb 2026 Full applications
  • 25/01247/FUL Granted

    Waterside Works Waterside Halifax Calderdale HX3 9BX

    Demolition of existing building and associated to tanks to be replaced with new purpose built Industrial Unit

    8 Dec 2025 Full applications