Skip to content
PlanIndex Get alerts
Menu

Planning application

2 Rhyd Y Gwern Lane Draethen Newport NP10 8GH

Granted Caerphilly 26/0518/CLPU Certificate Lawful Proposed Use/Dev

Permission granted. Work must normally begin within five years of the decision or the permission lapses.

Proposal

Obtain a Lawful Development Certificate to erect a timber boundary fence 2m high to east elevation to include 2m vehicular gates to private right of way, and 2m timber boundary fence to west elevation (reduced to 1m in height 2m set back from highway)

As published by the council, reference 26/0518/CLPU

Application record

Reference
26/0518/CLPU
Type
Certificate Lawful Proposed Use/Dev
Status
Decided
Decision
Granted
Received
4 Aug 2026
Validated
4 Aug 2026
Decided
27 Aug 2026
Ward
Machen And Rudry
Decision by
Delegated
Postcode
NP10 8GH

Site history

Applications at this address on the Caerphilly register

This site has had 2 applications since 2026: 1 approved, 0 refused.

  • 26/0426/HH Awaiting decision

    2 Rhyd Y Gwern Lane Draethen Newport NP10 8GH

    Erect a 2m timber fence along the boundary to No 1 Rhyd Y Gwern

    Submitted 22 Jun 2026 Householder

Timeline

Dates from the published record

  1. 4 Aug 2026

    Received by Caerphilly

  2. 14 Aug 2026

    Added to PlanIndex

  3. 27 Aug 2026

    Decision issued: Granted

Documents

Plans, drawings, consultee responses and the officer's report

10 documents on file for this application

  • DELEGATED REPORT Delegated Report · 27 Aug 2026
  • DECISION Decision · 27 Aug 2026
  • DECISION PLAN Decision · 27 Aug 2026
  • APPLICATION FORM Application Form · 04 Aug 2026
  • LOCATION PLAN OS Extract · 04 Aug 2026
  • EXISTING & PROPOSED EAST ELEVATION Drawing · 04 Aug 2026
  • BLOCK PLAN Drawing · 04 Aug 2026
  • EXISTING & PROPOSED WEST ELEVATION Drawing · 04 Aug 2026
  • 2RYG PROPOSSED STREET VIEW WEST ELEVATION Photo · 04 Aug 2026
  • VERIFICATION OF APPLICATION EVIDENCE Other · 04 Aug 2026

Watch members (£5 a month) open the document list from here.

Open the documents

What this grant of permission means

Caerphilly granted permission on 27 August 2026, subject to any conditions on the decision notice. Work must normally begin within five years or the permission lapses. More in our guide to what happens after a planning decision.

About lawful development applications

A lawful development certificate is a legal determination that existing or proposed works do not need planning permission; the merits of the scheme are not considered. More in our guide to planning application types.

Nearby applications

Within 0.3 miles

  • 2 Rhyd Y Gwern Lane Draethen Newport NP10 8GH

    26/0426/HH Submitted 22 Jun 2026 50 yards away

    76% historically approved · decision due ~17 Aug

    Erect a 2m timber fence along the boundary to No 1 Rhyd Y Gwern

    Awaiting decision Householder 4 docs
    Small domestic
  • Land Adjacent To Rhyd-y-gwern Farm Rhyd Y Gwern Lane Draethen Newport NP10 8GJ

    25/0661/FULL Submitted 25 Sep 2025 50 yards away

    Erect agricultural dwelling to support the use of the farm

    Refused Full applications 32 docs
    Domestic
  • 1 The Row Draethen Newport NP10 8GD

    21/0713/LBC Submitted 1 Jul 2021 100 yards away

    Demolish existing rear extensions and existing dormer and construct new single storey extension with mezzanine bedroom to rear of property

    Granted Heritage and listed buildings Extension Loft or dormer +1 17 docs
    Small domestic
  • 1 The Row Draethen Newport NP10 8GD

    21/0712/FULL Submitted 1 Jul 2021 100 yards away

    Demolish existing rear extensions and existing dormer and construct new single storey extension with mezzanine bedroom to rear of property

    Granted Full applications Extension Loft or dormer +1 16 docs
    Small domestic
  • Tir Yng Nghyfeirnod Grid 322211 187400 The Row To Pont Y Draethen Draethen

    19/0934/NMA Submitted 19 Nov 2019 100 yards away

    Seek approval of a non material amendment to application 19/0068/FULL (Erect detached dwelling with associated external works) to reconstruct the boundary stone wall along the entire length

    Granted Amendments New dwelling 5 docs
    Domestic
  • 7 Nantyfelin Draethen Newport NP10 8GE

    21/0666/TCA Submitted 21 Jun 2021 150 yards away

    Remove Ash and Sycamore trees from the front and rear of property

    Granted Trees 6 docs

In Caerphilly

  • 26/0548/CLEU Granted

    9 St David's Park New Tredegar NP24 6BJ

    Obtain a Lawful Development Certificate for existing use of the land as garden area associated with No. 9 St Davids Park

    Received 17 Aug, published by the council 24 Aug 2026 Lawful development
  • 26/0635/CLEU Awaiting decision

    Ambulance Hall Tredegar Terrace Risca Newport NP11 6BY

    Obtain a Lawful Development Certificate for existing use of the whole premises as a non-residential hall for community, meeting, educational and training purposes, falling within Class D1

    Received 21 Sep, published by the council 24 Sep 2026 Lawful development
  • 26/0517/CLPU Refused

    26 Heolddu Crescent Bargoed CF81 8UQ

    Obtain a Lawful Development Certificate for the proposed use of one of the existing ground floor rooms as a small-scale home-based tattoo business

    Received 3 Aug, published by the council 14 Aug 2026 Lawful development
  • 26/0611/CLPU Awaiting decision

    24 Heol Cwarrel Clark Caerphilly CF83 2NE

    Obtain a Lawful Development Certificate for conversion of the existing integral garage into habitable accommodation, replacement of the garage door with a window, associated internal alterations and installation of a compact through-floor lift

    Received 11 Sep, published by the council 18 Sep 2026 Lawful development
  • 26/0598/CLPU Awaiting decision

    PHS Group Ltd Block B Western Industrial Estate Caerphilly CF83 1XH

    Obtain a Lawful Development Certificate for installation of 140 No. roof-mounted photovoltaic solar panels on the east-, south- and west-facing pitched roof slopes of the existing commercial building, providing a total installed generating capacity of approximately 85.4 kWp, together with associated inverter, mounting system and ancillary electrical infrastructure

    Received 8 Sep, published by the council 12 Sep 2026 Lawful development