Skip to content
PlanIndex Get alerts
Menu

Planning application

Moores Motor Repairs Ltd Islwyn Road Wattsville Newport NP11 7QD

Awaiting decision Caerphilly 26/0450/FULL Full Application

Works: Demolition

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

Erect steel portal unit and demolish exiting steel garage structure following erection of new structure

As published by the council, reference 26/0450/FULL

Application record

Reference
26/0450/FULL
Type
Full Application
Status
Awaiting decision
Received
1 Jul 2026
Validated
7 Jul 2026
Ward
Ynysddu
Decision by
Delegated
Postcode
NP11 7QD

Timeline

Dates from the published record

  1. 1 Jul 2026

    Received by Caerphilly

  2. 7 Jul 2026

    Validated

    Checked as complete and ready for consideration.

  3. 28 Jul 2026

    Added to PlanIndex

  4. Decision

    Awaiting decision

    Decision expected by 1 September 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    Caerphilly took a median of 55 days over the applications it decided in the last year.

Documents

Plans, drawings, consultee responses and the officer's report

11 documents on file for this application

  • SENIOR ENGINEER (DRAINAGE) COMMENTS Consultee Comment · 21 Aug 2026
  • DWR CYMRU COMMENTS Consultee Comment · 28 Jul 2026
  • DWR CYMRU PLAN Consultee Comment · 28 Jul 2026
  • ENV HEALTH COMMENTS Consultee Comment · 13 Jul 2026
  • AMENDED PROPOSED FLOOR/ELEVATION PLAN Drawing · 09 Jul 2026
  • AMENDED PROPOSED SITE PLAN Drawing · 09 Jul 2026
  • GIS Report · 01 Jul 2026
  • LOCATION PLAN OS Extract · 01 Jul 2026
  • EXISTING SITE PLAN Drawing · 01 Jul 2026
  • PROPOSED FLOOR/ELEVATION PLAN Drawing · 01 Jul 2026
  • APPLICATION FORM Application Form · 01 Jul 2026

Trade members open them from here.

Open the documents

What happens while it is decided

This application is with Caerphilly for determination, against a statutory target of eight weeks. Over the last year Caerphilly decided full applications in a median of 64 days. More in our guide to how long planning decisions take.

About full applications

A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.

Nearby applications

Within 500 metres

In Caerphilly

  • 25/0494/FULL Granted

    Stagecoach Unit 4 Block A Penmaen Industrial Estate Pontllanfraith Blackwood NP12 2DY

    Demolish existing bus depot building, regrading of site and erect a Class A1 retail foodstore with surface level car parking, landscaping, and all associated drainage and engineering operations and service connections

    17 Jul 2025 Full applications
  • 26/0601/FULL Awaiting decision

    Exert Ltd Unit 5 Darren Drive Prince Of Wales Industrial Estate Abercarn Newport NP11 5AR

    Install converted shipping container and associated external works to operate as a small scale wellness facility

    9 Sep 2026 Full applications
  • 26/0599/FULL Awaiting decision

    Land To Rear Of 2 High Street Nelson Treharris CF46 6EU

    Demolition of masonry wall and erect 4 No apartments and associated works

    8 Sep 2026 Full applications
  • 26/0397/FULL Granted

    Essilor Unit 8 Bedwas Business Centre Bedwas House Industrial Estate Bedwas Caerphilly CF83 8DU

    Construct external 3-metre smoking and vaping shelter

    9 Jun 2026 Full applications
  • 26/0459/FULL Granted

    Moruzzi Landscapes Limited Nantgarw Road Caerphilly CF83 1BW

    Erect security fencing & automated gate to site frontage with Nantgarw Road

    8 Jul 2026 Full applications