Planning application

25/0840/NCC

Land At Grid Ref 310441 193869 Craig-evan-leyshon Common Road Llanfabon

Granted Caerphilly Development without complying with conds

Proposal

Vary conditions 2 (Plans), 7 (materials), 10 (Boundary treatments) and 11 (Verification report) of planning permission 23/0470/FULL (Erect a synchronous condenser with ancillary infrastructure and associated works including access and landscaping, and a cable connection to the adjacent existing substation for the purpose of supplying grid stability to the National Grid as part of their pathfinder 3 initiative)

As published by the council, reference 25/0840/NCC

Timeline

Dates from the published record

  1. 3 Dec 2025

    Received by Caerphilly

  2. 12 Mar 2026

    Decision issued: Granted

  3. 28 Jul 2026

    Added to PlanIndex

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within five years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About this record

Reading the register

This page mirrors an entry on the statutory planning register that Caerphilly is required to keep. The published feed for this record does not state which type of application it is, which is common for older entries and for some council systems; the register entry on the council portal will say, alongside the case officer and any consultation dates.

Every planning application follows the same broad path: submission, validation, publicity, then a decision by officers or committee. Our guide to planning application types explains the common types and what each can approve.

Nearby applications

Within 500 metres

  • 25/0561/COND Decided

    Land At Grid Ref 310441 193869 Craig-evan-leyshon Common Road Llanfabon

    Discharge condition 06 (Construction Traffic Management Plan) of planning consent 23/0470/FULL (Erect a synchronous condenser with ancillary infrastructure and associated works including access and landscaping, and a cable connection to the adjacent existing substation for the purpose of supplying grid stability to the National Grid as part of their pathfinder 3 initiative)

    13 Aug 2025 32m away Conditions
  • 26/0056/COND Decided

    Cilfynydd Substation Craig-evan-leyshon Common Road Llanfabon

    Discharge of condition 08 (Abnormal Indivisible Loads Traffic Management Plan) to planning permission 25/0243/FULL (Install and operate electrical infrastructure and associated infrastructure, including a grid connection)

    23 Jan 2026 265m away Conditions
  • 26/0053/COND Decided

    Cilfynydd Substation Craig-evan-leyshon Common Road Llanfabon

    Discharge condition 05 (WG Highways) of planning consent 25/0243/FULL (Install and operate electrical infrastructure and associated infrastructure, including a grid connection)

    21 Jan 2026 265m away Conditions
  • 26/0058/COND Decided

    Cilfynydd Substation Craig-evan-leyshon Common Road Llanfabon

    Discharge condition 09 (Highway Construction) of planning consent 25/0243/FULL (Install and operate electrical infrastructure and associated infrastructure, including a grid connection)

    21 Jan 2026 265m away Conditions
  • 26/0156/COND Decided

    Cilfynydd Substation Craig-evan-leyshon Common Road Llanfabon

    Discharge condition 11 (Noise Complaints) of planning consent 25/0243/FULL (Install and operate electrical infrastructure and associated infrastructure, including a grid connection)

    5 Mar 2026 265m away Conditions
  • 25/0558/COND Decided

    Cilfynydd Substation Craig-evan-leyshon Common Road Llanfabon

    Discharge conditions 06 (WG Highways 2) and 07 (WG Highways 3) of planning consent 25/0243/FULL (Install and operate electrical infrastructure and associated infrastructure, including a grid connection)

    12 Aug 2025 265m away Conditions