Skip to content
PlanIndex Get alerts
Menu

Planning application

Gwent Tertiary College - Coleg Gwent Cross Keys Campus Risca Road Crosskeys Newport NP11 7ZA

Granted Caerphilly 24/0633/NOTD Demolition Notification

Works: Demolition

Permission granted. Work must normally begin within five years of the decision or the permission lapses.

Proposal

Demolish 2 No semi-detached dwellings located at the centre of the northern boundary of the campus fronting onto Risca Road

As published by the council, reference 24/0633/NOTD

Application record

Reference
24/0633/NOTD
Type
Demolition Notification
Status
Decided
Decision
Notification - Details Approved
Received
28 Aug 2024
Validated
3 Sep 2024
Decided
19 Dec 2024
Ward
Crosskeys
Decision by
Delegated
Postcode
NP11 7ZA

Site history

Applications at this address on the Caerphilly register

This site has had 9 applications since 2024: 1 approved, 0 refused.

  • 26/0333/NMA Awaiting decision

    Gwent Tertiary College - Coleg Gwent Cross Keys Campus Risca Road Crosskeys Newport NP11 7ZA

    Seek approval of a non-material amendment to condition 07 of planning consent 25/0088/OUT (Hybrid application for the redevelopment of Coleg Gwent, Crosskeys Campus comprising: Full planning application for Phase 1 including the construction of a three-storey teaching building and a single-storey energy centre, together with associated access, parking, and landscaping works, Outline planning application for Phases 2-4, comprising the phased demolition of existing buildings and their replacement with new buildings, along with associated access, parking and landscaping across the campus site) to amend the trigger point from 'prior to the commencement of development' to 'prior to development above slab level'

    Submitted 13 May 2026 Amendments
  • 26/0266/COND Decided

    Gwent Tertiary College - Coleg Gwent Cross Keys Campus Risca Road Crosskeys Newport NP11 7ZA

    Discharge condition 22 (Finished floor levels) of planning permission 25/0088/OUT (Hybrid application for the redevelopment of Coleg Gwent, Crosskeys Campus comprising: Full planning application for Phase 1 including the construction of a three-storey teaching building and a single-storey energy centre, together with associated access, parking, and landscaping works, Outline planning application for Phases 2-4, comprising the phased demolition of existing buildings and their replacement with new buildings, along with associated access, parking and landscaping across the campus site)

    Decided 29 Apr 2026 Conditions
  • 26/0113/COND Decided

    Gwent Tertiary College - Coleg Gwent Cross Keys Campus Risca Road Crosskeys Newport NP11 7ZA

    Discharge condition 08 (Contamination - soil import testing) of planning consent 25/0088/OUT (Hybrid application for the redevelopment of Coleg Gwent, Crosskeys Campus comprising: Full planning application for Phase 1 including the construction of a three-storey teaching building and a single-storey energy centre, together with associated access, parking, and landscaping works, Outline planning application for Phases 2-4, comprising the phased demolition of existing buildings and their replacement with new buildings, along with associated access, parking and landscaping across the campus site)

    Decided 23 Jul 2026 Conditions
  • 26/0078/COND Decided

    Gwent Tertiary College - Coleg Gwent Cross Keys Campus Risca Road Crosskeys Newport NP11 7ZA

    Discharge condition 06 (Arboricultural Method Statement) of planning consent 25/0088/OUT (Hybrid application for the redevelopment of Coleg Gwent, Crosskeys Campus comprising: Full planning application for Phase 1 including the construction of a three-storey teaching building and a single-storey energy centre, together with associated access, parking, and landscaping works, Outline planning application for Phases 2-4, comprising the phased demolition of existing buildings and their replacement with new buildings, along with associated access, parking and landscaping across the campus site)

    Decided 21 Apr 2026 Conditions
  • 26/0054/COND Decided

    Gwent Tertiary College - Coleg Gwent Cross Keys Campus Risca Road Crosskeys Newport NP11 7ZA

    Discharge condition 07 (Contamination - scheme to treat) of planning consent 25/0088/OUT (Hybrid application for the redevelopment of Coleg Gwent, Crosskeys Campus comprising: Full planning application for Phase 1 including the construction of a three-storey teaching building and a single-storey energy centre, together with associated access, parking, and landscaping works, Outline planning application for Phases 2-4, comprising the phased demolition of existing buildings and their replacement with new buildings, along with associated access, parking and landscaping across the campus site)

    Decided 27 Apr 2026 Conditions
  • 26/0055/COND Decided

    Gwent Tertiary College - Coleg Gwent Cross Keys Campus Risca Road Crosskeys Newport NP11 7ZA

    Discharge condition 11 (Temporary Parking Strategy) of planning consent 25/0088/OUT (Hybrid application for the redevelopment of Coleg Gwent, Crosskeys Campus comprising: Full planning application for Phase 1 including the construction of a three-storey teaching building and a single-storey energy centre, together with associated access, parking, and landscaping works, Outline planning application for Phases 2-4, comprising the phased demolition of existing buildings and their replacement with new buildings, along with associated access, parking and landscaping across the campus site)

    Decided 25 Mar 2026 Conditions
  • 26/0022/COND Decided

    Gwent Tertiary College - Coleg Gwent Cross Keys Campus Risca Road Crosskeys Newport NP11 7ZA

    Discharge conditions 03 (Site control - scheme maj dev 1), 04 (Site control - scheme maj dev 2) and 05 (Wildlife CEMP) of planning consent 25/0088/OUT (Hybrid application for the redevelopment of Coleg Gwent, Crosskeys Campus comprising: Full planning application for Phase 1 including the construction of a three-storey teaching building and a single-storey energy centre, together with associated access, parking, and landscaping works, Outline planning application for Phases 2-4, comprising the phased demolition of existing buildings and their replacement with new buildings, along with associated access, parking and landscaping across the campus site)

    Decided 23 Apr 2026 Conditions
  • 26/0023/COND Decided

    Gwent Tertiary College - Coleg Gwent Cross Keys Campus Risca Road Crosskeys Newport NP11 7ZA

    Discharge condition 16 (Biodiversity Strategy) of planning consent 25/0088/OUT (Hybrid application for the redevelopment of Coleg Gwent, Crosskeys Campus comprising: Full planning application for Phase 1 including the construction of a three-storey teaching building and a single-storey energy centre, together with associated access, parking, and landscaping works, Outline planning application for Phases 2-4, comprising the phased demolition of existing buildings and their replacement with new buildings, along with associated access, parking and landscaping across the campus site)

    Decided 21 Apr 2026 Conditions

Timeline

Dates from the published record

  1. 28 Aug 2024

    Received by Caerphilly

  2. 3 Sep 2024

    Validated

    Checked as complete and ready for consideration.

  3. 19 Dec 2024

    Decision issued: Notification - Details Approved

  4. 30 Aug 2026

    Added to PlanIndex

Who's behind it

Company information only, from the register and Companies House

Agent on file

339 applications on PlanIndex · across 61 councils · 97% granted

Trade members see who it is, their full track record, and every application they have filed.

See who's behind it

Documents

Plans, drawings, consultee responses and the officer's report

14 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What this grant of permission means

Caerphilly granted permission on 19 December 2024, subject to any conditions on the decision notice. Work must normally begin within five years or the permission lapses. More in our guide to what happens after a planning decision.

About less common application types

This application sits outside the common categories, and the council record linked on this page sets out the specific procedure that applies. More in our guide to planning application types.

Nearby applications

Within 500 metres

  • Gwent Tertiary College - Coleg Gwent Cross Keys Campus Risca Road Crosskeys Newport NP11 7ZA

    26/0333/NMA Submitted 13 May 2026 68m away

    85% historically approved · decision due ~8 Jul

    Seek approval of a non-material amendment to condition 07 of planning consent 25/0088/OUT (Hybrid application for the redevelopment of Coleg Gwent, Crosskeys Campus comprising: Full planning application for Phase 1 including the construction of a three-storey teaching building and a single-storey energy centre, together with associated access, parking, and landscaping works, Outline planning application for Phases 2-4, comprising the phased demolition of existing buildings and their replacement with new buildings, along with associated access, parking and landscaping across the campus site) to amend the trigger point from 'prior to the commencement of development' to 'prior to development above slab level'

    Awaiting decision Amendments Demolition 2 docs
    Small domestic
  • Gwent Tertiary College - Coleg Gwent Cross Keys Campus Risca Road Crosskeys Newport NP11 7ZA

    26/0113/COND Submitted 18 Feb 2026 71m away

    Discharge condition 08 (Contamination - soil import testing) of planning consent 25/0088/OUT (Hybrid application for the redevelopment of Coleg Gwent, Crosskeys Campus comprising: Full planning application for Phase 1 including the construction of a three-storey teaching building and a single-storey energy centre, together with associated access, parking, and landscaping works, Outline planning application for Phases 2-4, comprising the phased demolition of existing buildings and their replacement with new buildings, along with associated access, parking and landscaping across the campus site)

    Decided Conditions Demolition 10 docs
    Small domestic
  • Gwent Tertiary College - Coleg Gwent Cross Keys Campus Risca Road Crosskeys Newport NP11 7ZA

    26/0054/COND Submitted 23 Jan 2026 90m away

    Discharge condition 07 (Contamination - scheme to treat) of planning consent 25/0088/OUT (Hybrid application for the redevelopment of Coleg Gwent, Crosskeys Campus comprising: Full planning application for Phase 1 including the construction of a three-storey teaching building and a single-storey energy centre, together with associated access, parking, and landscaping works, Outline planning application for Phases 2-4, comprising the phased demolition of existing buildings and their replacement with new buildings, along with associated access, parking and landscaping across the campus site)

    Decided Conditions Demolition 12 docs
    Small domestic
  • Gwent Tertiary College - Coleg Gwent Cross Keys Campus Risca Road Crosskeys Newport NP11 7ZA

    26/0055/COND Submitted 23 Jan 2026 90m away

    Discharge condition 11 (Temporary Parking Strategy) of planning consent 25/0088/OUT (Hybrid application for the redevelopment of Coleg Gwent, Crosskeys Campus comprising: Full planning application for Phase 1 including the construction of a three-storey teaching building and a single-storey energy centre, together with associated access, parking, and landscaping works, Outline planning application for Phases 2-4, comprising the phased demolition of existing buildings and their replacement with new buildings, along with associated access, parking and landscaping across the campus site)

    Decided Conditions Demolition 8 docs
    Small domestic
  • Gwent Tertiary College - Coleg Gwent Cross Keys Campus Risca Road Crosskeys Newport NP11 7ZA

    26/0266/COND Submitted 14 Apr 2026 90m away

    Discharge condition 22 (Finished floor levels) of planning permission 25/0088/OUT (Hybrid application for the redevelopment of Coleg Gwent, Crosskeys Campus comprising: Full planning application for Phase 1 including the construction of a three-storey teaching building and a single-storey energy centre, together with associated access, parking, and landscaping works, Outline planning application for Phases 2-4, comprising the phased demolition of existing buildings and their replacement with new buildings, along with associated access, parking and landscaping across the campus site)

    Decided Conditions Demolition 8 docs
    Small domestic
  • Gwent Tertiary College - Coleg Gwent Cross Keys Campus Risca Road Crosskeys Newport NP11 7ZA

    26/0022/COND Submitted 12 Jan 2026 90m away

    Discharge conditions 03 (Site control - scheme maj dev 1), 04 (Site control - scheme maj dev 2) and 05 (Wildlife CEMP) of planning consent 25/0088/OUT (Hybrid application for the redevelopment of Coleg Gwent, Crosskeys Campus comprising: Full planning application for Phase 1 including the construction of a three-storey teaching building and a single-storey energy centre, together with associated access, parking, and landscaping works, Outline planning application for Phases 2-4, comprising the phased demolition of existing buildings and their replacement with new buildings, along with associated access, parking and landscaping across the campus site)

    Decided Conditions Demolition 6 docs
    Small domestic

In Caerphilly

  • 26/0292/LA Granted

    Land At Grid Ref 317584 195854 Penllwyn Lane Pontllanfraith

    Erect 2 No Respite facilities, one adult and one children's centre with associated gardens, landscaping, parking and boundary treatments

    23 Apr 2026 Other
  • 26/0385/LA Awaiting decision

    Land At Ty Fry Farm Heol-Y-Bedw-Hirion Bedwellty Blackwood NP12 0BE

    Construct a drainage bund from 0.6m to 1m in height using native soils and native timber

    2 Jun 2026 Other
  • 26/0307/NOTAF Granted

    Land At Grid Ref 314328 198267 Hospital Road Penpedairheol

    Erect extension to hay barn

    27 Apr 2026 Other
  • 26/0281/NOTD Awaiting decision

    23 Glen View Ystrad Mynach Hengoed CF82 7BH

    Demolish garage

    16 Apr 2026 Other
  • 26/0134/NOTAF Granted

    Tophill Farm Gelligaer Road Gelligaer Hengoed CF82 8FY

    Re-profile land and associated drainage works

    25 Feb 2026 Other