Planning application

Lordan (UK) Ltd Unit 1 North Road Penallta Industrial Estate Penallta Hengoed CF82 7SS

Granted Caerphilly 22/0964/FULL Full Application

Works: Extension

Permission granted. Work must normally begin within five years of the decision or the permission lapses.

Proposal

Erect extension to existing factory, including additional car and cycle parking, refuse store, generator and associated works

As published by the council, reference 22/0964/FULL

Application record

Reference
22/0964/FULL
Type
Full Application
Status
Decided
Decision
Granted
Received
14 Nov 2022
Validated
24 Nov 2022
Decided
10 May 2023
Ward
St Cattwg
Decision by
Delegated
Postcode
CF82 7SS

Site history

Applications at this address on the Caerphilly register

This site has had 2 applications since 2022: 1 approved, 0 refused.

  • 24/0708/COND Decided

    Lordan (UK) Ltd Unit 1 North Road Penallta Industrial Estate Penallta Hengoed CF82 7SS

    Discharge conditions 05 (Contamination - Validation) and 07 (Coal 2) of planning consent 22/0964/FULL (Erect extension to existing factory, including additional car and cycle parking, refuse store, generator and associated works)

    Decided 13 Nov 2024 Conditions

Timeline

Dates from the published record

  1. 14 Nov 2022

    Received by Caerphilly

  2. 24 Nov 2022

    Validated

    Checked as complete and ready for consideration.

  3. 10 May 2023

    Decision issued: Granted

  4. 12 Sep 2026

    Added to PlanIndex

Who's behind it

Company information only, from the register and Companies House

Franksandtoms Architects Agent, an architecture practice

4 applications on PlanIndex · across 3 councils

Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.

See their track record

Lordan (UK) Ltd Applicant, registered in Hengoed

Active · incorporated 2003 · Hengoed

2 applications on PlanIndex

Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.

See their track record

Documents

Plans, drawings, consultee responses and the officer's report

32 documents on file for this application

  • DELEGATED REPORT Delegated Report · 10 May 2023
  • DECISION Decision · 10 May 2023
  • DECISION NOTICE - VERSION 2 Decision · 10 May 2023
  • DECISION NOTICE - VERSION 3 Decision · 10 May 2023
  • DECISION NOTICE - VERSION 4 Decision · 10 May 2023
  • DECISION NOTICE - VERSION 5 Decision · 10 May 2023
  • DECISION - VERSION 6 Decision · 10 May 2023
  • DECISION NOTICE -VERSION 7 Decision · 10 May 2023
  • PUBLIC PROTECTION COMMENTS Consultee Comment · 18 Apr 2023
  • SITES LOCATION AND CONTEXT W N Drawing · 13 Apr 2023
  • HABITATS AND VEGETATION W N Drawing · 13 Apr 2023
  • ECOLOGICAL EVALUATION FINAL Drawing · 13 Apr 2023
  • BAT & BIRD BOX PLAN V1 - APRIL 2023 (2) Drawing · 13 Apr 2023
  • AMENDED GROUND FLOOR LAYOUT Drawing · 20 Mar 2023
  • AMENDED PROPOSED ELEVATIONS Drawing · 20 Mar 2023
  • AMENDED PROPOSED SITE LAYOUT Drawing · 20 Mar 2023
  • AMENDED PROPOSED GENERATOR DETAILS Drawing · 20 Mar 2023
  • COAL AUTHORITY COMMENTS Consultee Comment · 19 Jan 2023
  • ECOLOGY COMMENTS Consultee Comment · 18 Jan 2023
  • DWR CYMRU PUBLIC SEWER RECORD Consultee Comment · 14 Dec 2022
  • DWR CYMRU CONSULTEE COMMENTS Consultee Comment · 14 Dec 2022
  • COAL MINING RISK ASSESSMENT Report · 24 Nov 2022
  • EXISTING GROUND FLOOR PLAN Drawing · 14 Nov 2022
  • EXISTING ELEVATIONS Drawing · 14 Nov 2022
  • EXISTING BLOCK PLAN Drawing · 14 Nov 2022
  • SITE LOCATION PLAN OS Extract · 14 Nov 2022
  • APPLICATION FORM Application Form · 14 Nov 2022
  • ARBORICULTURAL IMPACT ASSESSMENT Drawing · 14 Nov 2022
  • DESIGN AND ACCESS STATEMENT Report · 14 Nov 2022
  • TREE CONSTRAINTS PLAN Drawing · 14 Nov 2022
  • TREE SURVEY Report · 14 Nov 2022
  • ECOLOGICAL ASSESSMENT Report · 14 Nov 2022

Trade members open them from here.

Open the documents

What this grant of permission means

Caerphilly granted permission on 10 May 2023, subject to any conditions on the decision notice. Work must normally begin within five years or the permission lapses. More in our guide to what happens after a planning decision.

About full applications

A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.

Nearby applications

Within 500 metres

In Caerphilly

  • 25/0494/FULL Granted

    Stagecoach Unit 4 Block A Penmaen Industrial Estate Pontllanfraith Blackwood NP12 2DY

    Demolish existing bus depot building, regrading of site and erect a Class A1 retail foodstore with surface level car parking, landscaping, and all associated drainage and engineering operations and service connections

    17 Jul 2025 Full applications
  • 26/0601/FULL Awaiting decision

    Exert Ltd Unit 5 Darren Drive Prince Of Wales Industrial Estate Abercarn Newport NP11 5AR

    Install converted shipping container and associated external works to operate as a small scale wellness facility

    9 Sep 2026 Full applications
  • 26/0599/FULL Awaiting decision

    Land To Rear Of 2 High Street Nelson Treharris CF46 6EU

    Demolition of masonry wall and erect 4 No apartments and associated works

    8 Sep 2026 Full applications
  • 26/0397/FULL Granted

    Essilor Unit 8 Bedwas Business Centre Bedwas House Industrial Estate Bedwas Caerphilly CF83 8DU

    Construct external 3-metre smoking and vaping shelter

    9 Jun 2026 Full applications
  • 26/0459/FULL Granted

    Moruzzi Landscapes Limited Nantgarw Road Caerphilly CF83 1BW

    Erect security fencing & automated gate to site frontage with Nantgarw Road

    8 Jul 2026 Full applications