Planning application
33 Lon Uchaf Caerphilly CF83 1BR
Works: Extension Demolition Small domestic
Read from the description, not a valuation. How we read the register
Permission granted. Work must normally begin within five years of the decision or the permission lapses.
Proposal
Demolish existing rear single storey extension and replace with new single storey extension
As published by the council, reference 21/0683/FULL
Application record
- Reference
- 21/0683/FULL
- Type
- Full Application
- Status
- Decided
- Decision
- Granted
- Received
- 28 Jun 2021
- Validated
- 5 Jul 2021
- Decided
- 24 Aug 2021
- Ward
- St Martins
- Decision by
- Delegated
- Postcode
- CF83 1BR
Timeline
Dates from the published record
-
28 Jun 2021
Received by Caerphilly
-
5 Jul 2021
Validated
Checked as complete and ready for consideration.
-
24 Aug 2021
Decision issued: Granted
-
24 Aug 2026
Added to PlanIndex
Documents
Plans, drawings, consultee responses and the officer's report
5 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat a grant of permission means
The process from here
Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.
Work must normally begin within five years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
70 St Christopher's Drive Caerphilly CF83 1DD
Erect single storey rear extension
Granted Full applications Extension 21 docsSmall domestic -
5 Lon Uchaf Caerphilly CF83 1BR
Erect single storey rear extension
Granted Householder Extension 11 docsSmall domestic -
72 St Christopher's Drive Caerphilly CF83 1DE
Erect detached garage, garden wall and associated landscaping
Refused Householder New dwelling 9 docsDomestic -
17 St Helen's Court Caerphilly CF83 1DL
Erect single storey side and front extension with alterations to driveway
Refused Full applications Extension 9 docsSmall domestic -
18 St Julian's Court Caerphilly CF83 1DN
Erect two storey and single storey side extensions
Granted Full applications Extension 8 docsSmall domestic -
G8 - Garage Heol Trecastell Caerphilly
Replace existing garage with a new sectional and demountable garage
Granted Full applications 7 docs
Other full applications applications
In Caerphilly
-
26/0464/FULL Granted
Mixit Concrete Services Ltd Unit 8 South Road Penallta Industrial Estate Penallta Hengoed CF82 7ST
Erect a 3 bay vehicle servicing building for ancillary purposes to maintain and service volumetric concrete lorries and on-site vehicles
-
26/0589/COU Awaiting decision
Park View Bungalow Hill Street Rhymney Tredegar NP22 5JW
Change the Use of bungalow (Class C3) to a care home (Class C2)
-
26/0573/FULL Awaiting decision
Cwm Farm Queens Road Elliot's Town New Tredegar NP24 6NN
Convert barn and erect single storey rear extension and carry out internal alterations
-
26/0574/FULL Awaiting decision
5 - 7 Bedwlwyn Road Ystrad Mynach Hengoed CF82 7AA
To subdivide existing retail unit to two seperate shop units, replace shop fronts and associated external and internal works
-
26/0369/FULL Granted
Pencoedcae Farm Pencoedcae Farm Lane Princetown Tredegar NP22 3AF
Retain raised land levels and the erection of an agricultural building to house livestock