Planning application
The Old School, 1 Walker Street, Radcliffe, Manchester, M26 1FH
Works: New dwelling Windows or glazing Domestic
Read from the description, not a valuation. How we read the register
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Variation of condition no. 2 of planning permission 63376 for Conversion of antiques centre/dwelling to 13 no. (total) residential apartments; change to window type to UPVC windows
As published by the council, reference 67008
Application record
- Reference
- 67008
- Type
- Full
- Status
- Decided
- Decision
- Approve with Conditions
- Received
- 6 May 2021
- Validated
- 25 May 2021
- Decided
- 26 Aug 2021
- Ward
- Radcliffe - West
- Decision by
- Delegated
- Postcode
- M26 1FH
Timeline
Dates from the published record
-
6 May 2021
Received by Bury
-
25 May 2021
Validated
Checked as complete and ready for consideration.
-
26 Aug 2021
Decision issued: Approve with Conditions
-
23 Aug 2026
Added to PlanIndex
Documents
Plans, drawings, consultee responses and the officer's report
10 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat a grant of permission means
The process from here
Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.
Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
250 Stand Lane, Radcliffe, Manchester, M26 1JP
Single storey rear extension
Granted Full applications Extension 14 docsSmall domestic -
255 Stand Lane, Radcliffe, Manchester, M26 1JA
89% historically approved · decision due ~26 Aug
Lawful development certifcate for proposed loft conversion with flat roof rear dormer and additio...
Awaiting decision Loft or dormer -
261 Stand Lane, Radcliffe, Manchester, M26 1JA
Single storey front extension; conversion of existing garage to habitable space and alterations to patio doors on rear elevation
Granted Full applications Extension Windows or glazingSmall domestic -
53 Greendale Drive, Radcliffe, Manchester, M26 1UE
89% historically approved · decision due ~6 Aug
Two storey side extension; Single storey rear extension
Awaiting decision ExtensionSmall domestic
Other full applications applications
In Bury
-
73117 Granted
Land at Bradley Fold Farm Cottages (plot 2), Bradley Fold, Bolton, BL2 6RW
Erection of 1 no. dwelling
-
73116 Granted
Land at Bradley Fold Farm Cottages (plot 1), Bradley Fold, Bolton, BL2 6RW
Erection of 1 no. dwelling
-
73000 Granted
2-4 Kings Road, Prestwich, Manchester, M25 0LE
Two storey rear extension; Extension of basement and change of fenestration to front elevation
-
72808 Granted
2 Holyrood Drive, Prestwich, Manchester, M25 1QG
Loft conversion with roof extension and 2 no. side dormers.
-
72690 Granted
2 The Island, Railway Street, Summerseat, Ramsbottom, Bury, BL9 5QJ
Single storey rear extension and two storey side extensions