Planning application
70 Harper Fold Road, Radcliffe, Manchester, M26 3UB
Works: Extension Small domestic
Read from the description, not a valuation. How we read the register
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Single storey side/rear extension; Extension to garage
As published by the council, reference 64851
Application record
- Reference
- 64851
- Type
- Full
- Status
- Decided
- Decision
- Approve with Conditions
- Received
- 5 Nov 2019
- Validated
- 5 Nov 2019
- Decided
- 4 Dec 2019
- Ward
- Radcliffe - West
- Decision by
- Delegated
- Postcode
- M26 3UB
Timeline
Dates from the published record
-
5 Nov 2019
Received by Bury
-
4 Dec 2019
Decision issued: Approve with Conditions
-
23 Aug 2026
Added to PlanIndex
Who's behind it
Company information only, from the register and Companies House
Agent on file, a design practice registered in Bury
143 applications on PlanIndex · across 15 councils · 94% granted
Trade members see who it is, their full track record, and every application they have filed.
See who's behind itDocuments
Plans, drawings, consultee responses and the officer's report
11 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat a grant of permission means
The process from here
Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.
Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
83 Harper Fold Road, Radcliffe, Manchester, M26 3XQ
Single storey extension at side; new window to ground floor side elevation
Granted Full applications Extension Windows or glazing 11 docsSmall domestic -
8 Near Hey Close, Radcliffe, Manchester, M26 3YY
Alterations to ground floor layout, minor alterations to front and side elevations
Withdrawn Amendments -
Black Moss Farm, Black Moss Court, Radcliffe, M26 3EL
Lawful development certificate for proposed change of use of dwellinghouse from C3a to C3b for 24 hour supported living for up to two individuals
Decided Lawful developmentDomestic -
Grass verge opposite 2 Byron Avenue, Radclife, Manchester, M26 3GU
Prior approval for proposed 5G telecoms installation: H3G 15m street pole and additional equipment cabinets.
Refused Telecoms 10 docs -
Land at Harper Fold Road & Canute Street, Radcliffe, Manchester, M26 3BX
Erection of 2 no. dwellings
Granted Full applicationsSeveral homes
Other full applications applications
In Bury
-
73117 Granted
Land at Bradley Fold Farm Cottages (plot 2), Bradley Fold, Bolton, BL2 6RW
Erection of 1 no. dwelling
-
73116 Granted
Land at Bradley Fold Farm Cottages (plot 1), Bradley Fold, Bolton, BL2 6RW
Erection of 1 no. dwelling
-
73000 Granted
2-4 Kings Road, Prestwich, Manchester, M25 0LE
Two storey rear extension; Extension of basement and change of fenestration to front elevation
-
72808 Granted
2 Holyrood Drive, Prestwich, Manchester, M25 1QG
Loft conversion with roof extension and 2 no. side dormers.
-
72690 Granted
2 The Island, Railway Street, Summerseat, Ramsbottom, Bury, BL9 5QJ
Single storey rear extension and two storey side extensions