Planning application

Coal Clough Windfarm The Long Causeway Burnley Lancashire

Granted Burnley APP/2011/0520 Full Planning Application

Relates to APP/2009/0603

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Variation of condition 1 of planning permission APP/2009/0603 to allow retention of meteorological mast for a further two years

As published by the council, reference APP/2011/0520

Application record

Reference
APP/2011/0520
Type
Full Planning Application
Status
Permitted
Decision
Approve
Received
18 Oct 2011
Validated
1 Nov 2011
Decided
20 Dec 2011
Decision by
Delegated Decision

Site history

Applications at this address on the Burnley register

This site has had 2 applications since 2011: 1 approved, 0 refused.

  • APP/2013/0474 Decided

    Coal Clough Windfarm The Long Causeway Burnley Lancashire

    Discharge of conditions 11 (turbine finish) and 14 (traffic management plan) of planning permission APP/2009/0758; and, condition 3 (traffic management) of planning permission APP/2012/0318

    Decided 23 Dec 2013 Conditions

Timeline

Dates from the published record

  1. 18 Oct 2011

    Received by Burnley

  2. 1 Nov 2011

    Validated

    Checked as complete and ready for consideration.

  3. 20 Dec 2011

    Decision issued: Approve

  4. 27 Aug 2026

    Added to PlanIndex

Cases linked to this one on the register

  • APP/2009/0603 Granted

    Coal Clough Wind Farm The Long Causeway Cliviger Lancashire

    Proposed erection of 1no. meteorological mast with a maximum height of 70m for the temporary period of two years

    Decided 12 Apr 2010 Full applications

Documents

Plans, drawings, consultee responses and the officer's report

2 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What this grant of permission means

Burnley granted permission on 20 December 2011, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About full applications

A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.

Nearby applications

Within 500 metres

  • Coal Clough Wind Farm The Long Causeway Cliviger Lancashire

    APP/2009/0603 Submitted 29 Sep 2009 1m away

    Proposed erection of 1no. meteorological mast with a maximum height of 70m for the temporary period of two years

    Granted Full applications 7 docs
  • Coal Clough Windfarm The Long Causeway Cliviger Lancashire

    APP/2013/0393 Submitted 13 Aug 2013 90m away

    Discharge of condition 13 of planning permission APP/2009/0758 relating to Construction Method Statement

    Decided Conditions 19 docs
  • Coal Clough Wind Farm The Long Causeway Cliviger Lancashire

    APP/2009/0758 Submitted 22 Dec 2009 94m away

    Reforming wind farm including dismantling and removal of 24 no. wind turbines and associated earthworks. Erection of 8 no. wind turbines with a maximum height to blade tip of 110m. Upgrading of access from the Long Causeway, upgrading of existing and construction of new on-site access tracks, construction of control building, erection of 1 no. power performance mast, construction of temporary construction compound and associated works.

    Granted Full applications 34 docs
  • Coal Clough Windfarm The Long Causeway Cliviger Lancashire

    APP/2014/0469 Submitted 23 Oct 2014 251m away

    Installation of CCTV camera and mast (in reference to planning permission APP/2009/0758)

    Granted Amendments 3 docs
  • Causeway House The Long Causeway Cliviger Lancashire BB10 4RR

    APP/2015/0490 Submitted 13 Oct 2015 337m away

    Retention of temporary footpath/bridleway foruse only as a diversion route in the event of temporary closure of other route(s)

    Granted Amendments 1 doc
  • Coal Clough Windfarm The Long Causeway Cliviger Lancashire

    APP/2013/0259 Submitted 28 May 2013 341m away

    Approval under conditions 9(b), (degradation of TV reception quality); 20 (shadow flicker assessment); 25 & 26 (ecological protection) relating to planning application APP/2009/0758.

    Decided Conditions 7 docs

In Burnley

  • PA/2026/0305 Granted

    83 MANCHESTER ROAD, BURNLEY, BB11 1JY

    Conversion of former offices to 3no flats with new shop/office front.

    15 Jul 2026 Full applications
  • PA/2026/0399 Awaiting decision

    15A TODMORDEN ROAD, BURNLEY, BB10 4AB

    Installation of an ATM machine - Retrospective

    3 Sep 2026 Full applications
  • PA/2026/0362 Awaiting decision

    3 LIVESEY STREET, PADIHAM, BB12 7AB

    Proposed Change of use from function room at first floor of social club into 3no flats.

    2 Sep 2026 Full applications
  • PA/2026/0303 Granted

    7 Shuttleworth Mead Business Park, Mead Way, Padiham, BB12 7NG.

    Change of use of land from a temporary site compound to overspill parking and retention of boundary fencing.

    14 Jul 2026 Full applications
  • PA/2026/0389 Awaiting decision

    209-213 Padiham Road, Burnley, BB12 0HB

    Proposed change of use of existing retail computer shop (Class E) to a mixed use of restaurant and bar (Sui Generis) and installation of external extractor flue to the rear.

    1 Sep 2026 Full applications