Planning application
Lower Lodge Bath Road Taplow Buckinghamshire SL6 0AH
Works: Extension Small domestic
Read from the description, not a valuation. How we read the register
Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.
Proposal
Notification under The Town and Country Planning (General Permitted Development) Order 2015, Part 1 of Schedule 2 Class A for: single storey rear extension (depth extending from the original rear wall of 8 metres, maximum height 4 metres, eaves height 2.5 metres).
As published by the council, reference PL/26/06772/PNE
Application record
- Reference
- PL/26/06772/PNE
- Status
- Registered
- Validated
- 21 Aug 2026
- Postcode
- SL6 0AH
Timeline
Dates from the published record
-
21 Aug 2026
Validated
Checked as complete and ready for consideration.
-
21 Aug 2026
Added to PlanIndex
-
Decision
Awaiting decision
Decision expected by 16 October 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.
Buckinghamshire took a median of 58 days over the applications it decided in the last year.
What happens while it is decided
The process from here
This application is with Buckinghamshire for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.
The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.
About this record
Reading the register
This page mirrors an entry on the statutory planning register that Buckinghamshire is required to keep. The published feed for this record does not state which type of application it is, which is common for older entries and for some council systems; the register entry on the council portal will say, alongside the case officer and any consultation dates.
Every planning application follows the same broad path: submission, validation, publicity, then a decision by officers or committee. Our guide to planning application types explains the common types and what each can approve.
Nearby applications
Within 500 metres
-
Elmbank Hill Farm Road Taplow Buckinghamshire SL6 0AH
80% historically approved · decision due ~5 Aug
T3 -Quercus Robur - Crown thinning (10%) of the left-hand side to achieve a more balanced form with the right-hand side.
Decided -
2 Ellington Gardens Taplow Buckinghamshire SL6 0AY
Demolition of existing single storey rear extensions and the construction of a replacement single storey side/rear extension incorporating roof lantern
Granted Full applications Extension Demolition +1 13 docsSmall domestic -
Briarbank Ellington Road Taplow Buckinghamshire SL6 0AX
80% historically approved · decision due ~9 Oct
Ash - reduce crown by 3m and reduce branch that is growing into telephone line by 1.5m
Awaiting decision -
Laurel Cottage Ellington Road Taplow Buckinghamshire SL6 0AX
Crown reduce by 4m x 1 Sycamore (T1) and reduce back to previous points by 3m x 1 Mulberry (T2)
Decided Trees 2 docs -
The Hermitage Bath Road Taplow Buckinghamshire SL6 0AR
84% historically approved · decision due ~23 Oct
Approval of conditions 3 (surface materials) and 11 (landscaping) of planning permission PL/23/2975/FA - Removal of existing annexe building and single-storey extensions and erection of two-storey rear extension to the Hermitage building to provide 4 flats, alongside the replacement of the northern wing roof incorporating increase in ridge height, 3 side dormers and 3 side rooflights to provide additional accommodation for first floor flat (unit 4), and the erection of 1 detached dwellinghouse on the eastern side of the site.
Awaiting decision Conditions New dwelling Extension +2 5 docsSeveral homes -
The Hermitage Bath Road Taplow Buckinghamshire SL6 0AR
81% historically approved · decision due ~13 Oct
Erection of two bedroom detached dwelling
Awaiting decision Full applications New dwelling 16 docsDomestic