Planning application
Land North and South Of Brackley Road Turweston Buckinghamshire
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
In accordance with requirements of Paragraph 9(4)(b) of Schedule 17 to the High-Speed Rail (London - West Midlands) Act 2017, the nominated undertaker hereby requests approval of a SCHEME OF MITIGATION for Work Nos. 2/49 (in part), 2/109, 2/109A, 2/110 and 2/110B described in Schedule 1 of the HS2 (London - West Midlands) Act 2017.
As published by the council, reference PL/26/01286/HS2
Application record
- Reference
- PL/26/01286/HS2
- Type
- National Infrastructure: HS2 Schedule 17
- Status
- Decided
- Decision
- Granted As published: Consent Approved
- Received
- 16 Feb 2026
- Validated
- 16 Feb 2026
- Decided
- 16 Jun 2026
- Ward
- Buckingham
- Parish
- Turweston
- Decision by
- Delegated Decision
Site history
Applications at this address on the Buckinghamshire register
This site has had 3 applications since 2026: 3 approved, 0 refused.
-
PL/26/01285/HS2 Granted
Land North and South Of Brackley Road Turweston Buckinghamshire
In accordance with the requirements of Paragraphs 2 and 3 of Schedule 17 to the High-Speed Rail (London - West Midlands) Act 2017, the nominated undertaker hereby requests approval of PLANS AND SPECIFICATIONS relating to the following development authorised by the Act: - Westbury Viaduct (Part of) - Turweston Viaduct (Part of) - A422 Brackley Road Overbridge - Turweston Green Overbridge - Grovehill Embankment - Turweston Cutting - Turweston Embankment - Earthworks associated with the realignment of the A422 Brackley Road - Earthworks required to the approved 5 No. Access Tracks - Access Track 1 - Oatleys Farm Accommodation Access Track - Access Track 2 - Maintenance Access Track to the Maintenance - Access Point (MAP) (Off A422 Brackley Road) - Westbury Viaduct (Part of) - Turweston Viaduct (Part of) - A422 Brackley Road Overbridge - Turweston Green Overbridge - Grovehill Embankment - Turweston Cutting - Turweston Embankment - Earthworks associated with the realignment of the A422 Brackley Road - Earthworks required to the approved 5 No. Access Tracks - Earthworks associated with the diversion of Public Right of Way (PRoW) WBB/17 - Noise Barriers - 14 No. Maintenance Access Staircases (Line Side Steps) - 3 No. Minor Ditch Crossings (Slab Crossings) - Ancillary Culverts - 5 No. Concrete Cascades - Watercourse Diversion of the River Great Ouse - 2 No. Drainage Ponds - Drainage Ditches - Earthworks associated with the GSMR Compound at Chainage 95+480. - Earthworks associated with the GSMR Compound at Chainage 93+350 - Location of the Vehicle Restraint Barriers - Location of the permanent (security & boundary) fencing
-
PL/26/01287/HS2 Granted
Land North and South Of Brackley Road Turweston Buckinghamshire
In accordance with requirements of Paragraph 9(1) of Schedule 17 to the High Speed Rail (London - West Midlands) Act 2017, the nominated undertaker hereby requests approval for Work Nos. 2/109, 2/109A, 2/110, 2/110A and 2/110B described in Schedule 1 of the HS2 (London - West Midlands) Act 2017 to BE BROUGHT INTO USE.
Timeline
Dates from the published record
-
16 Feb 2026
Received by Buckinghamshire
-
16 Jun 2026
Decision issued: Consent Approved
-
4 Aug 2026
Added to PlanIndex
Documents
Plans, drawings, consultee responses and the officer's report
11 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Watch members (£5 a month) open the document list from here.
Open the documentsWhat this grant of permission means
Buckinghamshire granted permission on 16 June 2026, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About this record
The published feed does not state which type of application this is; the register entry on Buckinghamshire's portal will say. Our guide explains the common types.
Nearby applications
Within 0.3 miles
-
Land North and South Of Brackley Road Turweston Buckinghamshire
In accordance with the requirements of Paragraphs 2 and 3 of Schedule 17 to the High-Speed Rail (London - West Midlands) Act 2017, the nominated undertaker hereby requests approval of PLANS AND SPECIFICATIONS relating to the following development authorised by the Act: - Westbury Viaduct (Part of) - Turweston Viaduct (Part of) - A422 Brackley Road Overbridge - Turweston Green Overbridge - Grovehill Embankment - Turweston Cutting - Turweston Embankment - Earthworks associated with the realignment of the A422 Brackley Road - Earthworks required to the approved 5 No. Access Tracks - Access Track 1 - Oatleys Farm Accommodation Access Track - Access Track 2 - Maintenance Access Track to the Maintenance - Access Point (MAP) (Off A422 Brackley Road) - Westbury Viaduct (Part of) - Turweston Viaduct (Part of) - A422 Brackley Road Overbridge - Turweston Green Overbridge - Grovehill Embankment - Turweston Cutting - Turweston Embankment - Earthworks associated with the realignment of the A422 Brackley Road - Earthworks required to the approved 5 No. Access Tracks - Earthworks associated with the diversion of Public Right of Way (PRoW) WBB/17 - Noise Barriers - 14 No. Maintenance Access Staircases (Line Side Steps) - 3 No. Minor Ditch Crossings (Slab Crossings) - Ancillary Culverts - 5 No. Concrete Cascades - Watercourse Diversion of the River Great Ouse - 2 No. Drainage Ponds - Drainage Ditches - Earthworks associated with the GSMR Compound at Chainage 95+480. - Earthworks associated with the GSMR Compound at Chainage 93+350 - Location of the Vehicle Restraint Barriers - Location of the permanent (security & boundary) fencing
Granted 85 docs -
Land North and South Of Brackley Road Turweston Buckinghamshire
In accordance with requirements of Paragraph 9(1) of Schedule 17 to the High Speed Rail (London - West Midlands) Act 2017, the nominated undertaker hereby requests approval for Work Nos. 2/109, 2/109A, 2/110, 2/110A and 2/110B described in Schedule 1 of the HS2 (London - West Midlands) Act 2017 to BE BROUGHT INTO USE.
Granted 3 docs