Skip to content
PlanIndex Get alerts
Menu

Planning application

Laurel Bank 4 Cross Lanes Chalfont St Peter Buckinghamshire SL9 0LR

Withdrawn Buckinghamshire PL/25/3139/FA Full Application

Works: Roofing Windows or glazing

Withdrawn before a decision, so it carries no planning weight. A revised scheme can be submitted at any time.

Proposal

Replacement of existing flat-roof over two-storey front bay window with hipped pitched roof, insertion of a first-floor west-facing flank elevation obscurely-glazed window, replacement roof tiles and removal of existing chimney.

As published by the council, reference PL/25/3139/FA

Application record

Reference
PL/25/3139/FA
Type
Full Application
Status
Decided
Decision
Withdrawn
Received
26 Aug 2025
Validated
26 Aug 2025
Decided
15 Dec 2025
Ward
Chalfont St Peter
Parish
Chalfont St Peter
Decision by
Delegated Decision
Postcode
SL9 0LR

Timeline

Dates from the published record

  1. 26 Aug 2025

    Received by Buckinghamshire

  2. 15 Dec 2025

    Decision issued: Withdrawn

  3. 12 Aug 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

6 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What withdrawal means

The process from here

The applicant withdrew this application before the council decided it, so it carries no planning weight and no fee refund is automatic. Withdrawal often follows officer feedback that a refusal was likely.

The applicant is free to submit a revised application at any time, and many withdrawn schemes return in amended form, so the site is worth watching if the proposal affected you.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

In Buckinghamshire

  • PL/26/06317/FA Awaiting decision

    Valley View Barn Winchbottom Lane Little Marlow Buckinghamshire HP10 9QF

    Erection of stables, fence and gate

    26 Aug 2026 Full applications
  • PL/26/01565/FA Granted

    Redpitch Park Holtspur Lane Wooburn Green Buckinghamshire

    Siting of an additional mobile home within an existing mobile home park

    25 Feb 2026 Full applications
  • PL/26/01566/FA Granted

    Manor Farm Town Lane Wooburn Green Buckinghamshire HP10 0DQ

    Relocation of an existing mobile home plot

    25 Feb 2026 Full applications
  • PL/26/06609/FA Awaiting decision

    9 High Street Wendover Buckinghamshire HP22 6DU

    Extension of existing seating area, enclosure of existing pergola and installation of bar/pizza servery. Repaving of existing driveway

    17 Aug 2026 Full applications
  • PL/26/06446/FA Awaiting decision

    229 Main Road Walters Ash Buckinghamshire HP14 4TH

    Demolition of existing and erection of replacement dwelling and associated works.

    10 Aug 2026 Full applications