Planning application
07/26/0319/F
Delta Marriott Hotel Halfhide Lane Cheshunt Hertfordshire EN10 6NG
Proposal
Reconfiguration and extension of existing hotel accommodation (use class C1) comprising two-storey courtyard infill with ancillary restaurant, cafe, gym and spa facilities, a total of 142 hotel guestrooms (net loss of three) cycle parking, landscaping and associated works
As published by the council, reference 07/26/0319/F
Timeline
Dates from the published record
-
21 Apr 2026
Received by Broxbourne
-
23 Jul 2026
Added to PlanIndex
-
2 Aug 2026
Status changed to REGISTERED: Pending recommendation
Previously REGISTERED: Under Assessment.
-
Decision
Awaiting decision
The statutory target is eight weeks for most applications and thirteen for major development. Extensions of time are common.
What happens while it is decided
The process from here
This application is with Broxbourne for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.
The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
07/26/0306/DRC Awaiting decision
Land at former Gospel Hall Halfhide Lane Cheshunt EN8 0FH
Application for the approval of details reserved by conditions no. 16 (lighting details), 17 (EV charging points), 18 (cycle parking), 20 (site access) and 26 (car park security) of planning ref. 07/20/0572/F (Erection of business and household storage facility and discount supermarket (A 1) and associated landscaping car parking delivery areas highway improvements and associated works)
-
07/26/0475/AC Awaiting decision
Shurgard Self Storage and Lidl Supermarket Halfhide Lane Cheshunt Hertfordshire EN8 0FH
Advertisement consent for 1no. internally illuminated wall mounted sign
-
07/21/0667/HF Granted
229 Perrysfield Road, Cheshunt, Hertfordshire, EN8 0TP
First floor side extension with front and rear dormer
-
07/24/0698/F Refused
Existing parking areas on Garner Drive Turnford Hertfordshire EN10 6AU
Siting of 2.no fast electric vehicle chargers together with ancillary electrical equipment to create 4.no fast vehicle charging bays at existing sections of on-street parking as part of a community charging installation
-
07/24/0897/TW Decided
beside 25 and behind 21 and 23 Broomfield Avenue Turnford Hertfordshire EN10 6AX
Repeat of previous works to re-pollard Lime trees side 25 and behind 21 and 23 Broomfield Avenue - reduce back to previous points.
-
07/23/0071/PN42 Granted
19 Ontario Close Turnford Hertfordshire EN10 6FQ
Prior approval for single storey rear extension
Other full applications applications
In Broxbourne
-
07/26/0599/F Awaiting decision
Market Court 114 High Street Hoddesdon Hertfordshire EN11 8HD
Erection of one block of single storey residential flats comprising of 3 no.2 bed flats(Resubmission of 07/18/0932/F and 07/22/0873/F)
-
07/26/0079/F Granted
Limes Nursery Hammondstreet Road Cheshunt EN7 6PG
4 no. 3 bedroom dwellings and 2no. 2 bedroom dwellings
-
07/26/0589/F Awaiting decision
143 High Street, -, Waltham Cross, Hertfordshire, EN8 7AP
Refurbishment of existing shopfront
-
07/25/0961/F Granted
Unit 7, Geddings Road Hoddesdon EN11 0NT
Demolition of existing 3no. generators, 3no. fuel tanks, 1no. waste container, 2no. transformers and condenser unit’s enclosure, relocation of existing 2no. waste containers, 8no. condensers and 17no. parking spaces and installation of 2no. condenser units, 4no. generators, 2no. fuel tanks, 1no. pump house, 1no. sprinkler tank, 2no. pressurisation units, 2no. transformers, 5no. chillers, 1no. dx unit, 1no. air handling unit, pedestrian entrance, front gantry, anti-climb fencing spikes and internal alterations
-
07/26/0377/F Granted
Bright Sparks Andrews Lane Primary School Andrews Lane Cheshunt Hertfordshire EN7 6LB
Retention of existing modular building for pre school and after school club