Skip to content
PlanIndex Get alerts
Menu

Planning application

07/24/0770/DRC

Brookfield Centre, Marks And Spencer Plc Halfhide Lane Cheshunt Hertfordshire EN8 0TZ

Decided Broxbourne Details on Cond on Prev Appn

Proposal

Application for the approval of details reserved by condition no 4 (Asbestos Refurbishment Survey) of planning permission 07/24/0616/F(External alterations including installation of new windows and entrance doors to southern elevation and alterations to existing cladding)

As published by the council, reference 07/24/0770/DRC

Timeline

Dates from the published record

  1. 2 Oct 2024

    Received by Broxbourne

  2. 12 Nov 2024

    Decision issued: DISCHARGE OF CONDITIONS

  3. 23 Jul 2026

    Added to PlanIndex

After the decision

The process from here

The council has decided this application; the published outcome sits in the record above and the decision notice on the council portal carries the detail, including any conditions.

If permission was granted, work must normally begin within three years of the decision. If it was refused, the applicant can appeal within the statutory time limit or submit a revised scheme.

About this record

Reading the register

This page mirrors an entry on the statutory planning register that Broxbourne is required to keep. The published feed for this record does not state which type of application it is, which is common for older entries and for some council systems; the register entry on the council portal will say, alongside the case officer and any consultation dates.

Every planning application follows the same broad path: submission, validation, publicity, then a decision by officers or committee. Our guide to planning application types explains the common types and what each can approve.

Nearby applications

Within 500 metres

  • 07/26/0502/LDC Awaiting decision

    36 Beltona Gardens, Cheshunt, Hertfordshire, EN8 0PA

    Certificate of lawfulness for existing single storey rear extension

    23 Jun 2026 198m away Lawful development
  • 07/26/0011/DRC Awaiting decision

    Brookfield Riverside Land to the west of A10 and north of Cheshunt Park Brookfield Cheshunt Hertfordshire EN10

    Application for the approval of details reserved by condition nos. 9 (Landscape for Phase 1A, 1B and 1C), 10 (Arboriculture), 12 (Foul Water Drainage), 13 (Watercourse Design), 14 (Hydraulic modelling), 15 (Strategic surface water drainage strategy), 19 (Detailed Landscape and Ecological Management Plan (LEMP), 21 (Biodiversity Net Gain), 28 (site investigations), 41 (Archaeology Investigations), 45 (Pre-works culvert condition survey), 47 (Wormleybury Brook Culvert design), 49 (Buffer zone), 50 (Phase 1 and 2 Infrastructure Works (ATR 2), 51 (Phase 1 and 2 Infrastructure Works (ATR 2) of outline planning permission (07/22/0989/O)

    7 Jan 2026 264m away
  • 07/26/0010/DRC Awaiting decision

    Brookfield Garden Village Land to the west of A10 and north of Cheshunt Park Brookfield Cheshunt Hertfordshire EN10

    Application for the approval of details reserved by condition nos. 9 (Landscape for Phase 1A, 1B and 1C), 12 (Foul Water Drainage), 13 (Water Supply), 14 (Hydraulic modelling), 15 (Watercourse Design), 16 (Strategic surface water drainage strategy (Stage 4 Design), 17 (Strategic surface water drainage strategy (Stage 4 Design), 18 (Strategic surface water drainage strategy (Stage 4 Design) (Part), 23 (Pre-works culvert condition survey), 24 (Wormleybury Brook Culvert design), 26 (Buffer zone), 27 (Ecological assessment of Phase 1A, 1B and 1C). 28 (Outline Landscape and Ecological Management Plan (LEMP) and Compliance LEMP for Phase 1), 29 (Biodiversity Net Gain), 38 (part discharge) Phase 1 and 2 Infrastructure Works), 39 (ATR 2 Boardwalk), 41 (Archaeology investigations), 42 (Detailed site investigations), 44 (Piling Method Statement (Part), 47(Minerals Management Plan), 54(Conservation Management Plan), 57(Archaeological Mitigation Plan), 65(Highways details) of outline planning perm... read more

    7 Jan 2026 264m away
  • 07/26/0008/RM Awaiting decision

    Brookfield Riverside Land to the west of A10 and north of Cheshunt Park Brookfield Cheshunt Hertfordshire EN10

    Approval of reserved matters pursuant to outline planning permission 07/22/0989/O in respect of access for demolition of all buildings and structures associated with the New River Trading Estate Turnford Household Waste Recycling Centre Halfhide Lane Gypsy Site and Halfhide Lane Allotments for the development of retail financial & professional services cafes & restaurants indoor recreation & fitness and employment floorspace (Use Class E) bars hot food takeaways and cinema (Sui Generis) hotel (Use Class C1) civic hub community uses (Use Class E, F1 & F2) elderly persons accommodation (Use Class C2) residential dwellings (Use Class C3) and associated surface and decked car parking and landscaping together with the creation of a new link road and spine road between the Turnford Interchange and Halfhide Lane with associated cycle and pedestrian facilities including upgrades to existing routes beneath the A10 bridge crossings over New River highways works to Halfhide Lane and The Links inc... read more

    31 Dec 2025 264m away Reserved matters
  • 07/26/0009/RM Awaiting decision

    Brookfield Garden Village Land to the west of A10 and north of Cheshunt Park Brookfield Cheshunt Hertfordshire EN10

    Approval of reserved matters pursuant to outline planning permission 07/22/1079/O-PPA in respect of access for a new mixed use Garden Village development comprising up to 1,250 new dwellings (Use Class C3) including affordable housing; elderly persons accommodation (Use Class C2/C3); mixed use neighbourhood centre (Use Class E/C3); associated open space and community/recreational facilities; new primary school (up to 3FE) and early years nursery; new blue light hub; site for relocation of Halfhide Lane gypsy community (up to 20 pitches) with ancillary paddock; relocation of Local Authority recycling centre, depot and Halfhide Lane allotments; employment land (Use Class B2/B8) primary 33/11 kV sub-station; associated drainage, landscaping and infrastructure together with highway infrastructure and alterations comprising; the creation of a new link road to provide access off the Turnford Interchange; Garden Village loop road; section of spine road between northern and southern ends of lo... read more

    31 Dec 2025 264m away Reserved matters
  • 07/24/0674/HF Granted

    45 Lower Meadow, Cheshunt, Hertfordshire, EN8 0QU

    Part single storey and part two storey rear extension

    20 Aug 2024 281m away Householder