Planning application
DAYLIGHT INN, STATION SQUARE, PETTS WOOD, ORPINGTON, BR5 1LZ
Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.
Proposal
Internal alterations in association with the refurbishment of the public house including alterations to bars and internal fittings, installation of an illuminated feature wall, replacement of floor finishes. (Listed Building Consent). (Amended details and description).
As published by the council, reference 26/03365/LBC
Application record
- Reference
- 26/03365/LBC
- Type
- Listed building consent (Alt/Ext)
- Status
- Valid
- Received
- 25 Aug 2026
- Validated
- 25 Aug 2026
- Ward
- Petts Wood & Knoll
- Decision by
- Delegated Decision
- Postcode
- BR5 1LZ
Site history
Applications at this address on the Bromley register
This site has had 4 applications since 2026.
-
26/03392/FPA Awaiting decision
DAYLIGHT INN, STATION SQUARE, PETTS WOOD, ORPINGTON, BR5 1LZ
Removal of existing smoking shelter. Erection of 1 x 2m-high timber post with festoon lighting, new close-boarded fence and gate to conceal existing heat dumps.
-
26/03390/LBC Awaiting decision
DAYLIGHT INN, STATION SQUARE, PETTS WOOD, ORPINGTON, BR5 1LZ
External redecoration, refurbishment and replacement of signage, new light fittings to external porch areas, and LEDs to soffits behind fascia boards. (LISTED BUILDING CONSENT)
-
26/03382/ADV Awaiting decision
DAYLIGHT INN, STATION SQUARE, PETTS WOOD, ORPINGTON, BR5 1LZ
Display of advertisement signage comprising refurbishment and internal re-illumination of 2 existing fascia signs, refurbishment of 1 existing non-illuminated pictorial hanging sign and 1 existing non-illuminated pictorial post sign, and display of 3 non-illuminated freestanding double-sided menu A-boards.
Timeline
Dates from the published record
-
25 Aug 2026
Received by Bromley
-
4 Sep 2026
Added to PlanIndex
-
Decision
Awaiting decision
Decision expected by 20 October 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.
Bromley took a median of 58 days over the applications it decided in the last year.
Documents
Plans, drawings, consultee responses and the officer's report
13 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Watch members (£5 a month) open the document list from here.
Open the documentsWhat happens while it is decided
This application is with Bromley for determination, against a statutory target of eight weeks. Over the last year Bromley decided heritage and listed building applications in a median of 75 days. More in our guide to how long planning decisions take.
About heritage and listed building applications
Listed building consent is needed for works that affect the special interest of a listed building, and carrying out such works without it is a criminal offence. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
LUMA RESTAURANT, STATION SQUARE, PETTS WOOD, ORPINGTON, BR5 1LZ
Retention of 1x externally illuminated facia sign
Granted Advertising 7 docs -
DAYLIGHT INN, STATION SQUARE, PETTS WOOD, ORPINGTON, BR5 1LZ
67% historically approved · decision due ~4 Nov
Removal of existing smoking shelter. Erection of 1 x 2m-high timber post with festoon lighting, new close-boarded fence and gate to conceal existing heat dumps.
Awaiting decision Full applications 8 docsSmall domestic -
DAYLIGHT INN, STATION SQUARE, PETTS WOOD, ORPINGTON, BR5 1LZ
80% historically approved · decision due ~4 Nov
External redecoration, refurbishment and replacement of signage, new light fittings to external porch areas, and LEDs to soffits behind fascia boards. (LISTED BUILDING CONSENT)
Awaiting decision Heritage and listed buildings Extension 7 docsSmall domestic -
LUMA RESTAURANT, STATION SQUARE, PETTS WOOD, ORPINGTON, BR5 1LZ
67% historically approved · decision due ~7 Sep
Installation of pergola structures to provide partially enclosed seating areas
Awaiting decision Full applications 15 docs -
DAYLIGHT INN, STATION SQUARE, PETTS WOOD, ORPINGTON, BR5 1LZ
81% historically approved · decision due ~21 Oct
Display of advertisement signage comprising refurbishment and internal re-illumination of 2 existing fascia signs, refurbishment of 1 existing non-illuminated pictorial hanging sign and 1 existing non-illuminated pictorial post sign, and display of 3 non-illuminated freestanding double-sided menu A-boards.
Awaiting decision Advertising 10 docs -
LUMA RESTAURANT, STATION SQUARE, PETTS WOOD, ORPINGTON, BR5 1LZ
Installation of pergola structures to provide partially enclosed seating areas
Refused Full applications 13 docs
Other heritage and listed building applications
In Bromley
-
26/02964/LBC Granted
THE TOWER, THE CLOCK HOUSE, 83 TWEEDY ROAD, BROMLEY, BR1 1RP
Installation of a new internal staircase to access the second and third floor levels (Listed Building Consent)
-
26/02660/LBC Granted
7 KELSEY SQUARE, BECKENHAM, BR3 1AF
Removal of existing roof tiles and like for like replacement (LISTED BUILDING CONSENT)
-
26/03691/LBC Awaiting decision
THE OLD JAIL, JAIL LANE, BIGGIN HILL, WESTERHAM, TN16 3AX
Demolition of existing extensions and outbuildings. Internal and external alterations to the Listed Building; erection of extension; car park; hard and soft landscaping works; and associated works. Listed Building Consent.
-
26/03390/LBC Awaiting decision
DAYLIGHT INN, STATION SQUARE, PETTS WOOD, ORPINGTON, BR5 1LZ
External redecoration, refurbishment and replacement of signage, new light fittings to external porch areas, and LEDs to soffits behind fascia boards. (LISTED BUILDING CONSENT)
-
26/03226/LBC Awaiting decision
26 BASTON ROAD, HAYES, BROMLEY, BR2 7BE
Retention of internal alterations and replacement of the existing windows and rear doors (LISTED BUILDING CONSENT)