Planning application
26/01486/FPA
15 WORLDS END LANE, ORPINGTON, BR6 6AA
Proposal
Erection of detached two storey office building with associated car parking
As published by the council, reference 26/01486/FPA
Timeline
Dates from the published record
-
15 Apr 2026
Received by Bromley
-
9 Jun 2026
Validated
Checked as complete and ready for consideration.
-
25 Jul 2026
Added to PlanIndex
-
Decision
Awaiting decision
The statutory target is eight weeks for most applications and thirteen for major development. Extensions of time are common.
What happens while it is decided
The process from here
This application is with Bromley for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.
The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
26/01611/HPA Granted
8 LYNNE CLOSE, ORPINGTON, BR6 6BS
Demolition of existing conservatory. Single storey rear extension with roof light and elevational alterations.
-
25/00390/CON Awaiting decision
2 LEZAYRE ROAD, ORPINGTON, BR6 6BP
Details submitted to comply with the requirements of the following conditions relating to planning permission 25/00390/FULL1: Condition 3 - Construction and Environmental Management Plan Condition 4 - Highway drainage Condition 5 - Refuse and recycling storage Condition 6 - Cycle parking Condition 7 - External materials
-
26/02779/HPA Awaiting decision
42 OLD HILL, ORPINGTON, BR6 6BN
Roof alterations to form pitched roof
-
21/01452/FULL1 Granted
Estate Office, Wardens Field Close, Green Street Green, Orpington, BR6 6PA
To provide toilet & kitchenette for the LiveSmart Managers use: by converting the existing garage/store room for use as their office & providing toilet & kitchenette in the existing office area
-
26/02022/HPA Granted
63 BEECHWOOD AVENUE, ORPINGTON, BR6 7EZ
Demolition of existing external store and removal of chimneys, construction of single storey rear infill extension with raised roof of existing extension and roof lanterns, elevational alterations.
-
21/02821/FULL6 Refused
160 Windsor Drive, Orpington, BR6 6HQ
Single storey rear extension
Other full applications applications
In Bromley
-
26/01794/FPA Refused
44 SHEPPERTON ROAD, PETTS WOOD, ORPINGTON, BR5 1DN
Demolition of existing bungalow and erection of 2 semi-detached two storey dwellings with associated car and cycle parking, landscaping, installation of PV panels and air source heat pumps
-
25/05372/FPA Withdrawn
LEAFY GROVE HOUSE, 82 HEATHFIELD ROAD, KESTON, BR2 6BF
Change of use of existing dwelling house (Use Class C3) to a residential children’s home (Use Class C2) to accommodate up to four children aged between 8 and 17 years old
-
26/03046/FPA Awaiting decision
SUNNYBANK, THE HILLSIDE, ORPINGTON, BR6 7SD
Demolition of existing dwelling and garage and erection of custom/self-build dwelling with front boundary wall and gates, basement garage, EV charging point, solar panels and hard and soft landscaping
-
26/03045/FPA Awaiting decision
80 HIGH STREET, BECKENHAM, BR3 1ED
Retention of uPVC double glazed windows in east and south elevations at second and third floor level
-
26/01592/FPA Granted
LONDON SOUTH EAST COLLEGES BROMLEY CAMPUS, ROOKERY LANE, BROMLEY, BR2 8HE
Installation of external covered recreational seating area to south elevation (adjoining existing common room) with stepped and ramped access, installation of external seating/amphitheatre area to west elevation with visual screen and steps from first floor terrace to lower level and formation of planters for Peace Garden.