Planning application
26/01343/FPA
36 MEADOW WAY, ORPINGTON, BR6 8LW
Proposal
Demolition of dwellinghouse. Erection of two storey dwellinghouse (self-build), incorporating integral garage, parking and landscaping.
As published by the council, reference 26/01343/FPA
Timeline
Dates from the published record
-
1 Apr 2026
Received by Bromley
-
5 May 2026
Validated
Checked as complete and ready for consideration.
-
30 Jun 2026
Decision issued: REFUSED
-
25 Jul 2026
Added to PlanIndex
What refusal means
The process from here
The council refused this application for the reasons set out on the decision notice, which the council portal holds in full. Only the applicant can appeal a refusal; the time limit runs from the decision date and is shorter for householder schemes.
Refusal does not prevent a fresh attempt. Applicants often address the reasons for refusal and resubmit, so a refused scheme is not necessarily the end of proposals for the site.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
26/02311/TCA Granted
26 MEADOW WAY, ORPINGTON, BR6 8LW
Purple Plum (T74a) - Reduce height by approximately 2m and radial spread by approximately 1.5m. Crown lift to 3m over driveways, remove epicormic and deadwood and rebalance as required. Small dead Cherry (PL287) on front lawn of No. 28 (exempt works) - Remove.
-
26/01551/HPA Granted
9 MEADOW WAY, ORPINGTON, BR6 8LN
Demolition of detached garage, rear extensions and chimneys. Two storey front, side and rear extensions, with elevational alterations including rendering and fenestration changes. Roof alterations to raise ridge height, loft conversion with 2 x rear dormers and replacement of roof tiles.
-
25/00110/CON1 Awaiting decision
7 MEADOW WAY, ORPINGTON, BR6 8LN
Details submitted to comply with the requirements of the following conditions relating to planning permission 25/00110/FULL6: Condition 4 - External materials - to update the roof materials.
-
22/03540/FULL6 Granted
10 Meadow Way, Orpington, BR6 8LW
Construction of an open swimming pool in the rear garden.
-
26/02723/HPA Awaiting decision
13 THE GLEN, ORPINGTON, BR6 8LP
Installation of 4no. air conditioning units on flank elevations at ground floor level
-
21/02981/TREE Granted
7 The Glen, Orpington, BR6 8LP
4m Laurel - Reduce to 2m along boundary.6-8m Holly bush - Reduce to 2 m along boundary.2 self seeded Sycamore trees and 3 self seeded Oak trees all within 1-2m of boundary fence - Remove overhanging branches.Reduce other hedging to 2m along boundary line.
Other full applications applications
In Bromley
-
26/01794/FPA Refused
44 SHEPPERTON ROAD, PETTS WOOD, ORPINGTON, BR5 1DN
Demolition of existing bungalow and erection of 2 semi-detached two storey dwellings with associated car and cycle parking, landscaping, installation of PV panels and air source heat pumps
-
25/05372/FPA Withdrawn
LEAFY GROVE HOUSE, 82 HEATHFIELD ROAD, KESTON, BR2 6BF
Change of use of existing dwelling house (Use Class C3) to a residential children’s home (Use Class C2) to accommodate up to four children aged between 8 and 17 years old
-
26/03046/FPA Awaiting decision
SUNNYBANK, THE HILLSIDE, ORPINGTON, BR6 7SD
Demolition of existing dwelling and garage and erection of custom/self-build dwelling with front boundary wall and gates, basement garage, EV charging point, solar panels and hard and soft landscaping
-
26/03045/FPA Awaiting decision
80 HIGH STREET, BECKENHAM, BR3 1ED
Retention of uPVC double glazed windows in east and south elevations at second and third floor level
-
26/01592/FPA Granted
LONDON SOUTH EAST COLLEGES BROMLEY CAMPUS, ROOKERY LANE, BROMLEY, BR2 8HE
Installation of external covered recreational seating area to south elevation (adjoining existing common room) with stepped and ramped access, installation of external seating/amphitheatre area to west elevation with visual screen and steps from first floor terrace to lower level and formation of planters for Peace Garden.