Planning application
26/01083/FPA
35, Freelands Road , Bromley, Bromley, BR1 3HZ
Proposal
Retention application for conversion of offices on first and second floors to a 2 bedroom split level flat (Class C3) with associated refuse and cycle storage.
As published by the council, reference 26/01083/FPA
Timeline
Dates from the published record
-
19 Mar 2026
Received by Bromley
-
22 Apr 2026
Validated
Checked as complete and ready for consideration.
-
29 Jun 2026
Decision issued: GRANTED
-
25 Jul 2026
Added to PlanIndex
What a grant of permission means
The process from here
Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.
Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
26/01812/LDC Awaiting decision
6 PLYMOUTH ROAD, BROMLEY, BR1 3JD
Single storey rear extension, Removal of pitched roof and replaced with flat roof. LAWFUL DEVELOPMENT CERTIFICATE (PROPOSED)
-
23/00197/FULL6 Granted
11 North Road, Bromley, BR1 3LG
Part one/two storey rear extension and rear rooflights.
-
21/00482/FULL1 Refused
Land Adjacent, 13 Homefield Road, Bromley
Demolition of existing garage and erection of detached 2 bedroom dwelling
-
26/02650/HPA Awaiting decision
43 RODWAY ROAD, BROMLEY, BR1 3JP
Replacement of existing garage, construction of one/two storey side and rear extensions, roof alterations to include rear roof dormer, extension of rear garden patio with raised steps and elevational alterations.
-
26/02293/TPO Granted
39 RODWAY ROAD, BROMLEY, BR1 3JP
T1 Copper Beech - Crown lift by 5m. Reduce crown by 2m and thin by 10%. SUBJECT TO TPO 2898 (11.8.2023)
-
23/00333/FULL6 Granted
10 Rodway Road, Bromley, BR1 3JL
Single storey rear extension with landscaping works to form rear patio, replacement of garage doors to front with windows. Loft conversion to include rear eave height raised to match front and new crown roof formed with two rear facing dormers, rooflights, addition of solar panels and elevational alterations.
Other full applications applications
In Bromley
-
26/01794/FPA Refused
44 SHEPPERTON ROAD, PETTS WOOD, ORPINGTON, BR5 1DN
Demolition of existing bungalow and erection of 2 semi-detached two storey dwellings with associated car and cycle parking, landscaping, installation of PV panels and air source heat pumps
-
25/05372/FPA Withdrawn
LEAFY GROVE HOUSE, 82 HEATHFIELD ROAD, KESTON, BR2 6BF
Change of use of existing dwelling house (Use Class C3) to a residential children’s home (Use Class C2) to accommodate up to four children aged between 8 and 17 years old
-
26/03046/FPA Awaiting decision
SUNNYBANK, THE HILLSIDE, ORPINGTON, BR6 7SD
Demolition of existing dwelling and garage and erection of custom/self-build dwelling with front boundary wall and gates, basement garage, EV charging point, solar panels and hard and soft landscaping
-
26/03045/FPA Awaiting decision
80 HIGH STREET, BECKENHAM, BR3 1ED
Retention of uPVC double glazed windows in east and south elevations at second and third floor level
-
26/01592/FPA Granted
LONDON SOUTH EAST COLLEGES BROMLEY CAMPUS, ROOKERY LANE, BROMLEY, BR2 8HE
Installation of external covered recreational seating area to south elevation (adjoining existing common room) with stepped and ramped access, installation of external seating/amphitheatre area to west elevation with visual screen and steps from first floor terrace to lower level and formation of planters for Peace Garden.