Planning application
1 MORNINGTON AVENUE, BROMLEY, BR1 2RE
Works: Demolition Domestic
Read from the description, not a valuation. How we read the register
Refused. Only the applicant can appeal, within the statutory time limit, and a revised scheme can be submitted instead.
Proposal
Demolition of part of the existing dwelling (to involve reduction from 5 bedroom to 3 bedroom dwelling) and erection of a detached 2 storey, 3-bedroom, 4 person dwelling with associated amenity space, cycle and refuse storage, parking and a new vehicular crossover.
As published by the council, reference 26/00066/FPA
Application record
- Reference
- 26/00066/FPA
- Type
- Full planning permission
- Status
- Decision Made
- Decision
- REFUSED
- Received
- 9 Jan 2026
- Validated
- 9 Feb 2026
- Decided
- 29 May 2026
- Ward
- Bromley Common & Holwood
- Decision by
- Delegated Decision
- Postcode
- BR1 2RE
Timeline
Dates from the published record
-
9 Jan 2026
Received by Bromley
-
9 Feb 2026
Validated
Checked as complete and ready for consideration.
-
29 May 2026
Decision issued: REFUSED
-
11 Aug 2026
Added to PlanIndex
Documents
Plans, drawings, consultee responses and the officer's report
16 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat refusal means
The process from here
The council refused this application for the reasons set out on the decision notice, which the council portal holds in full. Only the applicant can appeal a refusal; the time limit runs from the decision date and is shorter for householder schemes.
Refusal does not prevent a fresh attempt. Applicants often address the reasons for refusal and resubmit, so a refused scheme is not necessarily the end of proposals for the site.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
33 Mornington Avenue, Bromley, BR1 2RE
Demolition of existing rear extension at no.33 Mornington Avenue to replaced with erection of two storey rear extension and erection of first floor rear extension to no.35 Mornington Avenue
Refused Full applications Extension Demolition 9 docs -
26 MORNINGTON AVENUE, BROMLEY, BR1 2RF
Single storey rear extension, extending beyond the rear wall of the original house by 4.5m, for which the maximum height would be 3m, and for which the height of the eaves would be 2.7m (42 Day Notification for Householder Permitted Development Prior Approval)
Decided Prior approval Extension 6 docsSmall domestic -
28A MORNINGTON AVENUE, BROMLEY, BR1 2RF
Single storey rear extension.
Granted Householder Extension 8 docsSmall domestic -
40 Mornington Avenue, Bromley, BR1 2RF
Loft conversion with en suite, incorporating dormer to rear and rooflights to the front and first floor rear extension to provide enlarged bedroom
Granted Householder Extension Loft or dormer 8 docsDomestic -
LONDON BOROUGH OF BROMLEY, WALDO ROAD, BROMLEY, BR1 2QX
Details submitted to comply with the requirements of the following conditions relating to planning permission 24/00182/FULL1: Condition 6 - Unexpected Contamination
Decided Conditions 6 docs -
15 WALWYN AVENUE, BROMLEY, BR1 2RD
Demolition of existing garages to rear of 15 Walwyn Avenue and construction of single storey 1-Bed / 2-Person dwelling (Use Class C3) with associated car parking, refuse storage, cycle parking and landscaping.
Refused Full applications Demolition 21 docsSmall domestic
Other full applications applications
In Bromley
-
26/02774/FPA Granted
BABINGTON HOUSE SCHOOL, GRANGE DRIVE, CHISLEHURST, BR7 5ES
Demolition of canopy. Erection of canopy and associated tree works.
-
26/03420/FPA Awaiting decision
FLAT 2, GREAT ASH, LUBBOCK ROAD, CHISLEHURST, BR7 5JZ
Replacement of three windows and a french door to the rear elevations and replacement of one window to the front elevation, including the enlargement of one rear window opening.
-
26/02406/FPA Refused
THE CROFT, MOTTINGHAM LANE, MOTTINGHAM, LONDON, SE9 4RX
Demolition of the existing dwelling and construction of a four-storey detached 8-bedroom dwelling, including basement accommodation, integral garage, air source heat pump, photovoltaic panels, and associated hard and soft landscaping
-
26/01497/FPA Granted
GRAYLINS FARM, JACKASS LANE, KESTON, BR2 6AN
Demolition of existing 3 bedroom dwellinghouse (The Barn) established under Lawful Development Certificate ref. 25/00673/ELUD, removal of static caravan and caravan, formation of enlarged curtilage associated with proposed dwelling, with erection of replacement single storey dwellinghouse with covered car port, outside shed/logstore and associated boundary fencing and gates, with hard and soft landscaping and air source heat pumps. AMENDED/CORRECTED SITE PLAN
-
26/02692/FPA Granted
132 CROYDON ROAD, PENGE, LONDON, SE20 7YZ
Replacement of all existing old uPVC windows to all elevations and all flats with double glazed white coloured new uPVC windows of sliding sash styles to front elevation and top hung over top hung styles to rear and side elevations and replacement of old uPVC rear garden door with new uPVC double glazed garden door.