Planning application
114 LENNARD ROAD, BECKENHAM, BR3 1QS
Works: Extension Small domestic
Read from the description, not a valuation. How we read the register
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Single storey rear extension, extending beyond the rear wall of the original house by 4.00m, for which the maximum height would be 3.00m, and for which the height of the eaves would be 2.80m (42 Day Notification for Householder Permitted Development Prior Approval)
As published by the council, reference 26/00052/NOT
Application record
- Reference
- 26/00052/NOT
- Type
- Prior approval Part 1 Class A.1(ea): Larger home extension
- Status
- Decision Made
- Decision
- PRIOR APPROVAL IS NOT REQUIRED
- Received
- 7 Jan 2026
- Validated
- 9 Jan 2026
- Decided
- 13 Feb 2026
- Ward
- Penge & Cator
- Decision by
- Delegated Decision
- Postcode
- BR3 1QS
Site history
Applications at this address on the Bromley register
This site has had 2 applications since 2025: 1 approved, 1 refused.
-
25/04676/HPA Refused
114 LENNARD ROAD, BECKENHAM, BR3 1QS
Construction of a single storey rear extension.
Timeline
Dates from the published record
-
7 Jan 2026
Received by Bromley
-
9 Jan 2026
Validated
Checked as complete and ready for consideration.
-
13 Feb 2026
Decision issued: PRIOR APPROVAL IS NOT REQUIRED
-
11 Aug 2026
Added to PlanIndex
Documents
Plans, drawings, consultee responses and the officer's report
7 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat this grant of permission means
Bromley granted permission on 13 February 2026, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About prior approval applications
Prior approval applies where permitted development rights already grant the principle of the work, leaving the council only the specific matters the rules name, commonly within 56 days. More in our guide to planning application types.
Nearby applications
Within 500 metres
-
102 LENNARD ROAD, BECKENHAM, BR3 1QS
68% historically approved · decision due ~9 Jan
Demolition of existing garage outbuilding and erection of single storey detached three-bedroom dwelling (self-build) with associated amenity space and parking.
Awaiting decision Full applications New dwelling Demolition 21 docsSmall domestic -
114 LENNARD ROAD, BECKENHAM, BR3 1QS
Construction of a single storey rear extension.
Refused Householder Extension 10 docsSmall domestic -
87 Lennard Road, London, SE20 7LY
Change of use from House of Multiple Occupation (HMO) (Use Class C4) to residential (Use Class C3), together with internal alterations, single storey rear extension and front, rear and side roof dormers to form 4no self-contained residential flats.
Refused Full applications New dwelling Extension +1 15 docsSmall domestic -
196 Kent House Road, Beckenham, BR3 1JN
Demolition of existing outrigger and erection of two storey rear extension and rear dormer window to create 2 x 2 bed flats and provide new extension to existing shop at ground floor. Change of use class from convenience shop at ground floor E(a) to small offices E(g)(i) with replacement shop front. Rear change use class from residential garage C3 to a small office E(g)(i).
Refused Full applications New dwelling Extension +3 22 docs -
98 LENNARD ROAD, BECKENHAM, LONDON, SE20 7LY
Conversion of garage to habitable space and construction of single storey rear extension, elevational alterations
Granted Householder Extension 24 docsSmall domestic -
72 LENNARD ROAD, BECKENHAM, LONDON, SE20 7LY
Part demolition at front and erection of front porch. Single storey side extension, first floor rear extension with 2 juliet balconies and elevational alterations
Refused Householder Extension Demolition 8 docsSmall domestic
Other prior approval applications
In Bromley
-
26/02926/NOT Refused
Grass Verge, Chipperfield Road, Bromley, London, BR5 2HA
Removal of existing 8m high streetworks pole and 2no. cabinets, and replacement with 15m high Phase 7 Mk2 streetworks pole with 9no. radio antennas and ancillary apparatus including wraparound cabinet and 2no. additional equipment cabinets. (56 DAY CONSULTATION BY EE Ltd REGARDING THE NEED FOR APPROVAL OF SITING AND APPEARANCE OF TELECOMMUNICATIONS DEVELOPMENT)
-
26/02972/NOT Granted
3 SANDHURST ROAD, ORPINGTON, BR6 9HN
Single storey rear extension, extending beyond the rear wall of the original house by 4.9m, for which the maximum height would be 3.17m, and for which the height of the eaves would be 3m (42 Day Notification for Householder Permitted Development Prior Approval
-
26/03425/NOT Awaiting decision
33 THE AVENUE, WEST WICKHAM, BR4 0DX
Single storey rear extension, extending beyond the rear wall of the original house by 4.69m, for which the maximum height would be 3.19m, and for which the height of the eaves would be 3m (42 Day Notification for Householder Permitted Development Prior Approval)
-
26/02802/NOT Refused
PEILLS COURTYARD, BOURNE ROAD, BROMLEY, BR2 9NS
Change of use of commercial building (Use Class E) to 7 dwellinghouses (Use Class C3) under Schedule 2, Part 3, Class MA of The Town and Country Planning (General Permitted Development) (England) Order 2015 (as amended) (56 day application for prior approval in respect of transport and highways impacts, contamination risks, flood risk, noise impacts, impact on character or sustainability of a conservation area, provision of natural light to habitable rooms, impact on an area of general or heavy industry, impact of loss of services provided by a registered nursery or a health centre, and fire safety impacts)
-
26/02858/NOT Granted
3 MANNING ROAD, ORPINGTON, BR5 4DD
Single storey rear extension, extending beyond the rear wall of the original house by 3.50m, for which the maximum height would be 3.25m, and for which the height of the eaves would be 2.95m (42 Day Notification for Householder Permitted Development Prior Approval)