Planning application
BISHAN MANOR, 60 PLAISTOW LANE, BROMLEY, BR1 3JE
Works: New dwelling Extension
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Construction of third floor and fourth floor (rooftop) extensions to provide 2 no. residential flats with balconies to third and fourth floor, elevational alterations, extension of lift shaft, installation of solar panels, formation of roof terrace; with associated development include refuse and cycle storage.
As published by the council, reference 25/05875/FPA
Application record
- Reference
- 25/05875/FPA
- Type
- Full planning permission
- Status
- Decision Made
- Decision
- GRANTED
- Received
- 29 Dec 2025
- Validated
- 2 Feb 2026
- Decided
- 1 Apr 2026
- Ward
- Plaistow
- Decision by
- Delegated Decision
- Postcode
- BR1 3JE
Timeline
Dates from the published record
-
29 Dec 2025
Received by Bromley
-
2 Feb 2026
Validated
Checked as complete and ready for consideration.
-
1 Apr 2026
Decision issued: GRANTED
-
11 Aug 2026
Added to PlanIndex
Documents
Plans, drawings, consultee responses and the officer's report
19 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat a grant of permission means
The process from here
Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.
Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
70 PLAISTOW LANE, BROMLEY, BR1 3JE
Demolition of existing conservatory and construction of Single storey rear extension with roof lantern.
Granted Householder Extension Demolition +1 7 docsSmall domestic -
NASIB HOUSE, 62 PLAISTOW LANE, BROMLEY, BR1 3JE
Construction of third floor and fourth floor (rooftop) extensions to provide 2 no. residential flats with balconies to third and fourth floors, roof terrace, elevational alterations, extension of lift shaft, installation of solar panels, with associated development including refuse and cycle storage.
Granted Full applications New dwelling Extension 19 docs -
64 PLAISTOW LANE, BROMLEY, BR1 3JE
Change of use of existing building from a children’s home containing four children and two staff (Use Class C3b) to a children’s home containing six children and six staff (Use Class C2)
Granted Full applications 17 docs -
43 RODWAY ROAD, BROMLEY, BR1 3JP
78% historically approved · decision due ~28 Aug
Replacement of existing garage, construction of one/two storey side and rear extensions, roof alterations to include rear roof dormer, extension of rear garden patio with raised steps and elevational alterations.
Awaiting decision Householder Extension Loft or dormer +1 5 docsDomestic -
37 RODWAY ROAD, BROMLEY, BR1 3JP
68% historically approved · decision due ~15 Oct
Extension, alteration and conversion of the existing property to create 7 flats with roof alterations incorporating PV panels, green roof, associated landscaping, green roof carport, cycle, bin storage and elevational alterations.
Awaiting decision Full applications New dwelling Extension +1 32 docsSeveral homes -
39 RODWAY ROAD, BROMLEY, BR1 3JP
T1 Copper Beech - Crown lift by 5m. Reduce crown by 2m and thin by 10%. SUBJECT TO TPO 2898 (11.8.2023)
Granted Trees 3 docs
Other full applications applications
In Bromley
-
26/02774/FPA Granted
BABINGTON HOUSE SCHOOL, GRANGE DRIVE, CHISLEHURST, BR7 5ES
Demolition of canopy. Erection of canopy and associated tree works.
-
26/03420/FPA Awaiting decision
FLAT 2, GREAT ASH, LUBBOCK ROAD, CHISLEHURST, BR7 5JZ
Replacement of three windows and a french door to the rear elevations and replacement of one window to the front elevation, including the enlargement of one rear window opening.
-
26/02406/FPA Refused
THE CROFT, MOTTINGHAM LANE, MOTTINGHAM, LONDON, SE9 4RX
Demolition of the existing dwelling and construction of a four-storey detached 8-bedroom dwelling, including basement accommodation, integral garage, air source heat pump, photovoltaic panels, and associated hard and soft landscaping
-
26/01497/FPA Granted
GRAYLINS FARM, JACKASS LANE, KESTON, BR2 6AN
Demolition of existing 3 bedroom dwellinghouse (The Barn) established under Lawful Development Certificate ref. 25/00673/ELUD, removal of static caravan and caravan, formation of enlarged curtilage associated with proposed dwelling, with erection of replacement single storey dwellinghouse with covered car port, outside shed/logstore and associated boundary fencing and gates, with hard and soft landscaping and air source heat pumps. AMENDED/CORRECTED SITE PLAN
-
26/02692/FPA Granted
132 CROYDON ROAD, PENGE, LONDON, SE20 7YZ
Replacement of all existing old uPVC windows to all elevations and all flats with double glazed white coloured new uPVC windows of sliding sash styles to front elevation and top hung over top hung styles to rear and side elevations and replacement of old uPVC rear garden door with new uPVC double glazed garden door.