Planning application
25/05458/FPA
CAR PARK, CHELSFIELD RAILWAY STATION, STATION APPROACH, BR6 6EU
Proposal
Retention of InPost Parcel Locker.
As published by the council, reference 25/05458/FPA
Timeline
Dates from the published record
-
25 Nov 2025
Received by Bromley
-
3 Apr 2026
Validated
Checked as complete and ready for consideration.
-
22 Jun 2026
Decision issued: GRANTED
-
25 Jul 2026
Added to PlanIndex
What a grant of permission means
The process from here
Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.
Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
24/03516/CON Awaiting decision
7 STATION APPROACH, CHELSFIELD, ORPINGTON, BR6 6EU
Details submitted to comply with the requirements of the following conditions relating to planning permission 24/03516/FULL1: Condition 3 - storage of refuse and recyclable materials Condition 4 - bicycle parking Condition 5 - parking spaces and/or garages and turning space
-
26/02059/HPA Refused
9 STATION APPROACH, CHELSFIELD, ORPINGTON, BR6 6EU
Demolition of existing conservatory and construction of single storey rear extension
-
26/02054/LDC Decided
9 STATION APPROACH, CHELSFIELD, ORPINGTON, BR6 6EU
Construction of rear outbuilding LAWFUL DEVELOPMENT CERTIFICATE (PROPOSED)
-
26/02509/LDC Awaiting decision
11 THE MEADWAY, ORPINGTON, BR6 6HH
Single storey side extension LAWFUL DEVELOPMENT CERTIFICATE (PROPOSED)
-
26/02511/LDC Awaiting decision
11 THE MEADWAY, ORPINGTON, BR6 6HH
Removal of side door and construction of hip to gable roof alteration and first floor rear dormer extension. LAWFUL DEVELOPMENT CERTIFICATE (PROPOSED)
-
19/00489/AMD Granted
11 Windsor Drive, Orpington, BR6 6EY
Amendment to planning ref: 19/00489/FULL1The house is now under contruction and it has become apparent that there is very little storage available for future occupants. In view of this, I have been instructed to re-arrange the first floor accomodation so as to provide a dressing room with adequate cupboard space to provide clothes, etc. storage for the 3-4 occupants.No elevational changes proposed or required.
Other full applications applications
In Bromley
-
26/01794/FPA Refused
44 SHEPPERTON ROAD, PETTS WOOD, ORPINGTON, BR5 1DN
Demolition of existing bungalow and erection of 2 semi-detached two storey dwellings with associated car and cycle parking, landscaping, installation of PV panels and air source heat pumps
-
25/05372/FPA Withdrawn
LEAFY GROVE HOUSE, 82 HEATHFIELD ROAD, KESTON, BR2 6BF
Change of use of existing dwelling house (Use Class C3) to a residential children’s home (Use Class C2) to accommodate up to four children aged between 8 and 17 years old
-
26/03046/FPA Awaiting decision
SUNNYBANK, THE HILLSIDE, ORPINGTON, BR6 7SD
Demolition of existing dwelling and garage and erection of custom/self-build dwelling with front boundary wall and gates, basement garage, EV charging point, solar panels and hard and soft landscaping
-
26/03045/FPA Awaiting decision
80 HIGH STREET, BECKENHAM, BR3 1ED
Retention of uPVC double glazed windows in east and south elevations at second and third floor level
-
26/01592/FPA Granted
LONDON SOUTH EAST COLLEGES BROMLEY CAMPUS, ROOKERY LANE, BROMLEY, BR2 8HE
Installation of external covered recreational seating area to south elevation (adjoining existing common room) with stepped and ramped access, installation of external seating/amphitheatre area to west elevation with visual screen and steps from first floor terrace to lower level and formation of planters for Peace Garden.