Skip to content
PlanIndex Get alerts
Menu

Planning application

BOURNE, HOLWOOD PARK AVENUE, ORPINGTON, BR6 8NQ

Granted Bromley 25/05004/FPA Full planning permission

Works: Demolition Domestic

Read from the description, not a valuation. How we read the register

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Demolition of existing dwelling. Erection of two storey detached dwellinghouse with swimming pool.

As published by the council, reference 25/05004/FPA

Application record

Reference
25/05004/FPA
Type
Full planning permission
Status
Decision Made
Decision
GRANTED
Received
24 Oct 2025
Validated
4 Nov 2025
Decided
19 Jun 2026
Ward
Bromley Common & Holwood
Decision by
Delegated Decision
Postcode
BR6 8NQ

Timeline

Dates from the published record

  1. 24 Oct 2025

    Received by Bromley

  2. 4 Nov 2025

    Validated

    Checked as complete and ready for consideration.

  3. 19 Jun 2026

    Decision issued: GRANTED

  4. 11 Aug 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

31 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • THE DORMERS, HOLWOOD PARK AVENUE, ORPINGTON, BR6 8NQ

    25/04759/TCA Submitted 10 Oct 2025 0m away

    94% historically approved · decision due ~5 Dec

    Oak tree on boundary line between Barfield and Dormers - Remove as close to ground level as possible.

    Awaiting decision Trees 9 docs
  • THE DORMERS, HOLWOOD PARK AVENUE, ORPINGTON, BR6 8NQ

    25/05409/HPA Submitted 20 Nov 2025 0m away

    Construction of single storey outbuilding with covered barbeque area in rear garden.

    Granted Householder 9 docs
    Small domestic
  • THE DORMERS, HOLWOOD PARK AVENUE, ORPINGTON, BR6 8NQ

    26/01655/TCA Submitted 15 Apr 2026 0m away

    94% historically approved · decision due ~10 Jun

    T2 Sweet Chestnut - Following the removal of T1, the adjacent Sweet Chestnut will be exposed to new wind loading. As per BS3998:2010 Table B1 on attached document, this tree will be reduced in height by up to 6m and cleared of unstable deadwood to mitigate the risk of altered exposure failure.

    Awaiting decision Trees 2 docs
  • THE DORMERS, HOLWOOD PARK AVENUE, ORPINGTON, BR6 8NQ

    26/01477/TPO Submitted 15 Apr 2026 0m away

    T1 Oak tree on boundary line between Barfield and Dormers - Remove as close to ground level as possible. SUBJECT TO TPO 3047 (9.12.2025)

    Decided Trees 13 docs
  • BOURNE, HOLWOOD PARK AVENUE, ORPINGTON, BR6 8NQ

    25/05004/CON Submitted 22 Jun 2026 0m away

    Details submitted to comply with the requirements of the following conditions relating to planning permission 25/05004/FPA: Condition 4 - Surface water drainage

    Decided Conditions 7 docs
  • Mundendorrie, Holwood Park Avenue, Orpington, BR6 8NQ

    24/03967/TREE Submitted 22 Oct 2024 0m away

    T1 Beech - Reduce in height by 5m to secondary crown, removing dead tops. Prune sides as required to shape and balance.T2 Sweet Chestnut (Dead tree) - Section fell to ground level.

    Granted Trees 2 docs

In Bromley

  • 26/02774/FPA Granted

    BABINGTON HOUSE SCHOOL, GRANGE DRIVE, CHISLEHURST, BR7 5ES

    Demolition of canopy. Erection of canopy and associated tree works.

    8 Jul 2026 Full applications
  • 26/03420/FPA Awaiting decision

    FLAT 2, GREAT ASH, LUBBOCK ROAD, CHISLEHURST, BR7 5JZ

    Replacement of three windows and a french door to the rear elevations and replacement of one window to the front elevation, including the enlargement of one rear window opening.

    1 Sep 2026 Full applications
  • 26/02406/FPA Refused

    THE CROFT, MOTTINGHAM LANE, MOTTINGHAM, LONDON, SE9 4RX

    Demolition of the existing dwelling and construction of a four-storey detached 8-bedroom dwelling, including basement accommodation, integral garage, air source heat pump, photovoltaic panels, and associated hard and soft landscaping

    15 Jun 2026 Full applications
  • 26/01497/FPA Granted

    GRAYLINS FARM, JACKASS LANE, KESTON, BR2 6AN

    Demolition of existing 3 bedroom dwellinghouse (The Barn) established under Lawful Development Certificate ref. 25/00673/ELUD, removal of static caravan and caravan, formation of enlarged curtilage associated with proposed dwelling, with erection of replacement single storey dwellinghouse with covered car port, outside shed/logstore and associated boundary fencing and gates, with hard and soft landscaping and air source heat pumps. AMENDED/CORRECTED SITE PLAN

    16 Apr 2026 Full applications
  • 26/02692/FPA Granted

    132 CROYDON ROAD, PENGE, LONDON, SE20 7YZ

    Replacement of all existing old uPVC windows to all elevations and all flats with double glazed white coloured new uPVC windows of sliding sash styles to front elevation and top hung over top hung styles to rear and side elevations and replacement of old uPVC rear garden door with new uPVC double glazed garden door.

    3 Jul 2026 Full applications