Skip to content
PlanIndex Get alerts
Menu

Planning application

201 Mead Way, Hayes, Bromley, BR2 9ES

Granted Bromley 24/04007/HHPA Prior approval Part 1 Class A.1(ea): Larger home extension

Works: Extension Small domestic

Read from the description, not a valuation. How we read the register

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Single storey rear extension, extending beyond the rear wall of the original house by 4.85m, for which the maximum height would be 3m, and for which the height of the eaves would be 3m (42 Day Notification for Householder Permitted Development Prior Approval

As published by the council, reference 24/04007/HHPA

Application record

Reference
24/04007/HHPA
Type
Prior approval Part 1 Class A.1(ea): Larger home extension
Status
Decision Made
Decision
PRIOR APPROVAL IS NOT REQUIRED
Received
25 Oct 2024
Validated
25 Oct 2024
Decided
27 Nov 2024
Ward
Hayes & Coney Hall
Decision by
Delegated Decision
Postcode
BR2 9ES

Timeline

Dates from the published record

  1. 25 Oct 2024

    Received by Bromley

  2. 27 Nov 2024

    Decision issued: PRIOR APPROVAL IS NOT REQUIRED

  3. 16 Aug 2026

    Added to PlanIndex

Who's behind it

Company information only, from the register and Companies House

Agent on file, a planning consultancy registered in Sutton

266 applications on PlanIndex · across 19 councils · 79% granted

Trade members see who it is, their full track record, and every application they have filed.

See who's behind it

Documents

Plans, drawings, consultee responses and the officer's report

10 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What this grant of permission means

Bromley granted permission on 27 November 2024, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About prior approval applications

Prior approval applies where permitted development rights already grant the principle of the work, leaving the council only the specific matters the rules name, commonly within 56 days. More in our guide to planning application types.

Nearby applications

Within 500 metres

  • 57 PICKHURST PARK, BROMLEY, BR2 0TN

    26/01005/TPO Submitted 13 Mar 2026 92m away

    T1 Oak in rear garden - Reduce the overall height and radial spread of the canopy by up to 3/4 metres, (back to previous reduction points) cutting back to appropriate growing points where possible. Remove major deadwood. T2 Apple in rear garden - Reduce close to previous reduction points and shape accordingly, to remove major deadwood. T3 Box Elder on rear boundary - Reduce the overall height and radial spread of the canopy by up to 2.5/3m, cutting back to appropriate growing points where possible. Remove major deadwood. SUBJECT TO TPO 1393 (23.7.1997)

    Granted Trees 8 docs
  • 45 PICKHURST PARK, BROMLEY, BR2 0TN

    26/01642/TCA Submitted 13 Apr 2026 92m away

    A - Dead Eucalyptus tree - Fell. B - Conifer - Fell. D - Cherry Blossom - Crown reduce by 20% and thin interior branches. E - Yew - Reduce the spread to 4m. H - Cedar - Fell. I - Cedar - Fell. J - Plum blossom - Crown thin through removal of interior branches. K - Cedar - Fell.

    Granted Trees 3 docs
  • 68 PICKHURST PARK, BROMLEY, BR2 0TW

    26/01457/HPA Submitted 14 Apr 2026 127m away

    78% historically approved · decision due ~30 Jun

    Demolition of conservatory. Retention of single storey rear extension with raised platform and steps, boundary fence (above 2m) along the raised platform and elevational alterations.

    Awaiting decision Householder Extension Demolition 12 docs
    Small domestic
  • 6 CULVERSTONE CLOSE, BROMLEY, BR2 9DN

    25/04263/HPA Submitted 9 Sep 2025 172m away

    Construction of single storey front/side extension alterations to existing front extension roof and elevational alterations.

    Granted Householder Extension 9 docs
    Small domestic
  • 1 BARNHILL AVENUE, BROMLEY, BR2 9DP

    25/05474/LDC Submitted 26 Nov 2025 180m away

    Single storey rear extension, garage conversion to habitable space and elevational alterations. LAWFUL DEVELOPMENT CERTIFICATE (PROPOSED)

    Decided Lawful development Extension 10 docs
    Small domestic
  • 1 BARNHILL AVENUE, BROMLEY, BR2 9DP

    26/00618/HPA Submitted 17 Feb 2026 180m away

    Garage conversion to habitable space, single storey rear extension and elevational alterations.

    Granted Householder Extension 10 docs
    Small domestic

In Bromley

  • 26/02926/NOT Refused

    Grass Verge, Chipperfield Road, Bromley, London, BR5 2HA

    Removal of existing 8m high streetworks pole and 2no. cabinets, and replacement with 15m high Phase 7 Mk2 streetworks pole with 9no. radio antennas and ancillary apparatus including wraparound cabinet and 2no. additional equipment cabinets. (56 DAY CONSULTATION BY EE Ltd REGARDING THE NEED FOR APPROVAL OF SITING AND APPEARANCE OF TELECOMMUNICATIONS DEVELOPMENT)

    20 Jul 2026 Prior approval
  • 26/02972/NOT Granted

    3 SANDHURST ROAD, ORPINGTON, BR6 9HN

    Single storey rear extension, extending beyond the rear wall of the original house by 4.9m, for which the maximum height would be 3.17m, and for which the height of the eaves would be 3m (42 Day Notification for Householder Permitted Development Prior Approval

    22 Jul 2026 Prior approval
  • 26/03425/NOT Awaiting decision

    33 THE AVENUE, WEST WICKHAM, BR4 0DX

    Single storey rear extension, extending beyond the rear wall of the original house by 4.69m, for which the maximum height would be 3.19m, and for which the height of the eaves would be 3m (42 Day Notification for Householder Permitted Development Prior Approval)

    1 Sep 2026 Prior approval
  • 26/02802/NOT Refused

    PEILLS COURTYARD, BOURNE ROAD, BROMLEY, BR2 9NS

    Change of use of commercial building (Use Class E) to 7 dwellinghouses (Use Class C3) under Schedule 2, Part 3, Class MA of The Town and Country Planning (General Permitted Development) (England) Order 2015 (as amended) (56 day application for prior approval in respect of transport and highways impacts, contamination risks, flood risk, noise impacts, impact on character or sustainability of a conservation area, provision of natural light to habitable rooms, impact on an area of general or heavy industry, impact of loss of services provided by a registered nursery or a health centre, and fire safety impacts)

    9 Jul 2026 Prior approval
  • 26/02858/NOT Granted

    3 MANNING ROAD, ORPINGTON, BR5 4DD

    Single storey rear extension, extending beyond the rear wall of the original house by 3.50m, for which the maximum height would be 3.25m, and for which the height of the eaves would be 2.95m (42 Day Notification for Householder Permitted Development Prior Approval)

    15 Jul 2026 Prior approval