Planning application
76 Ravensbury Road, Orpington, BR5 2NN
Works: Extension Small domestic
Read from the description, not a valuation. How we read the register
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Single storey rear extension, extending beyond the rear wall of the original house by 5.12m, for which the maximum height would be 3m, and for which the height of the eaves would be 3m (42 Day Notification for Householder Permitted Development Prior Approval)
As published by the council, reference 23/00897/HHPA
Application record
- Reference
- 23/00897/HHPA
- Type
- Prior approval Part 1 Class A.1(ea): Larger home extension
- Status
- Decision Made
- Decision
- PRIOR APPROVAL IS NOT REQUIRED
- Received
- 6 Mar 2023
- Validated
- 6 Mar 2023
- Decided
- 13 Apr 2023
- Ward
- St Paul's Cray
- Decision by
- Delegated Decision
- Postcode
- BR5 2NN
Site history
Applications at this address on the Bromley register
This site has had 2 applications since 2023: 1 approved, 0 refused.
-
23/00898/PLUD Decided
76 Ravensbury Road, Orpington, BR5 2NN
Front porch and outbuildingLAWFUL DEVELOPMENT CERTIFICATE (PROPOSED)
Timeline
Dates from the published record
-
6 Mar 2023
Received by Bromley
-
13 Apr 2023
Decision issued: PRIOR APPROVAL IS NOT REQUIRED
-
16 Aug 2026
Added to PlanIndex
Who's behind it
Company information only, from the register and Companies House
Agent on file, an architecture practice registered in Bromley
13 applications on PlanIndex · across 4 councils
Trade members see who it is, their full track record, and every application they have filed.
See who's behind itDocuments
Plans, drawings, consultee responses and the officer's report
5 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat this grant of permission means
Bromley granted permission on 13 April 2023, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About prior approval applications
Prior approval applies where permitted development rights already grant the principle of the work, leaving the council only the specific matters the rules name, commonly within 56 days. More in our guide to planning application types.
Nearby applications
Within 500 metres
-
76 Ravensbury Road, Orpington, BR5 2NN
Front porch and outbuildingLAWFUL DEVELOPMENT CERTIFICATE (PROPOSED)
Decided Lawful development Extension 11 docsSmall domestic -
50 RAVENSBURY ROAD, ORPINGTON, BR5 2NN
Demolition of existing garage and construction of a single storey side extension
Granted Householder Extension Demolition 15 docsSmall domestic -
4 Clarendon Green, Orpington, BR5 2PA
Demolition of existing garage, erection of part one/two storey side extension and single storey rear extension with patio and steps. Alterations to the front curtilage including a new front boundary wall with pillers and railings and the creation of 1 parking space together with soft and hard landscaping
Granted Householder Extension Demolition 18 docsSmall domestic -
4 Clarendon Green, Orpington, BR5 2PA
Details submitted to discharge conditions in relation to planning approval ref: 22/02441/FULL3Condition 3: Lighting scheme - access drive and car parking areasCondition 4: Surface water drainage
Decided Conditions 7 docs -
36 Clarendon Green, Orpington, BR5 2PA
Loft conversion with dormer to the rear pitched roof and 2 rooflights in the front pitched roof PROPOSED LAWFUL DEVELOPMENT CERTIFICATE
Decided Lawful development Loft or dormer 9 docs -
83 Clarendon Green, Orpington, BR5 2NZ
T1 Oak in front garden - Reduce all aspects by 4m where growth points allow leaving a finished natural shape. Remove all visible deadwood. Thin canopy by approximately 10%.SUBJECT TO TPO 923 (23.2.1994)
Refused Trees
Other prior approval applications
In Bromley
-
26/02926/NOT Refused
Grass Verge, Chipperfield Road, Bromley, London, BR5 2HA
Removal of existing 8m high streetworks pole and 2no. cabinets, and replacement with 15m high Phase 7 Mk2 streetworks pole with 9no. radio antennas and ancillary apparatus including wraparound cabinet and 2no. additional equipment cabinets. (56 DAY CONSULTATION BY EE Ltd REGARDING THE NEED FOR APPROVAL OF SITING AND APPEARANCE OF TELECOMMUNICATIONS DEVELOPMENT)
-
26/02972/NOT Granted
3 SANDHURST ROAD, ORPINGTON, BR6 9HN
Single storey rear extension, extending beyond the rear wall of the original house by 4.9m, for which the maximum height would be 3.17m, and for which the height of the eaves would be 3m (42 Day Notification for Householder Permitted Development Prior Approval
-
26/03425/NOT Awaiting decision
33 THE AVENUE, WEST WICKHAM, BR4 0DX
Single storey rear extension, extending beyond the rear wall of the original house by 4.69m, for which the maximum height would be 3.19m, and for which the height of the eaves would be 3m (42 Day Notification for Householder Permitted Development Prior Approval)
-
26/02802/NOT Refused
PEILLS COURTYARD, BOURNE ROAD, BROMLEY, BR2 9NS
Change of use of commercial building (Use Class E) to 7 dwellinghouses (Use Class C3) under Schedule 2, Part 3, Class MA of The Town and Country Planning (General Permitted Development) (England) Order 2015 (as amended) (56 day application for prior approval in respect of transport and highways impacts, contamination risks, flood risk, noise impacts, impact on character or sustainability of a conservation area, provision of natural light to habitable rooms, impact on an area of general or heavy industry, impact of loss of services provided by a registered nursery or a health centre, and fire safety impacts)
-
26/02858/NOT Granted
3 MANNING ROAD, ORPINGTON, BR5 4DD
Single storey rear extension, extending beyond the rear wall of the original house by 3.50m, for which the maximum height would be 3.25m, and for which the height of the eaves would be 2.95m (42 Day Notification for Householder Permitted Development Prior Approval)