Skip to content
PlanIndex Get alerts
Menu

Planning application

69 Beckenham Lane, Bromley, BR2 0DN

Granted Bromley 23/00798/FULL1 Full planning permission

Works: New dwelling Domestic

Read from the description, not a valuation. How we read the register

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Amalgamation of 2x flats (69a & 69b) into a single dwelling house

As published by the council, reference 23/00798/FULL1

Application record

Reference
23/00798/FULL1
Type
Full planning permission
Status
Decision Made
Decision
GRANTED
Received
23 Feb 2023
Validated
6 Mar 2023
Decided
27 Apr 2023
Ward
Shortlands & Park Langley
Decision by
Delegated Decision
Postcode
BR2 0DN

Timeline

Dates from the published record

  1. 23 Feb 2023

    Received by Bromley

  2. 6 Mar 2023

    Validated

    Checked as complete and ready for consideration.

  3. 27 Apr 2023

    Decision issued: GRANTED

  4. 29 Aug 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

6 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • 93 BECKENHAM LANE, BROMLEY, BR2 0DN

    26/01670/FPA Submitted 27 Apr 2026 32m away

    Alterations to shop front, installation of extractor flue to rear, and internal alterations.

    Granted Full applications Windows or glazing 9 docs
  • 93 BECKENHAM LANE, BROMLEY, BR2 0DN

    26/01206/LDC Submitted 26 Mar 2026 32m away

    Proposed change of use from the Retail Unit (Class E (a)) to a Restaurant (Class E(b)). LAWFUL DEVEOPMENT CERTIFICATE (PROPOSED)

    Decided Lawful development 8 docs
  • 84 Beckenham Lane, Bromley, Bromley, BR2 0DW

    21/02547/PLUD Submitted 21 May 2021 57m away

    Roof alterations including the insertion of 2 roof windows and rear dormer windowsLAWFUL DEVELOPMENT CERTIFICATE (PROPOSED)

    Decided Lawful development Loft or dormer Roofing +1 6 docs
  • 1 Recreation Road, Bromley, BR2 0DY

    22/04981/FULL1 Submitted 21 Dec 2022 63m away

    Single storey rear infill extension

    Granted Full applications Extension 12 docs
    Small domestic
  • 1 Recreation Road, Bromley, BR2 0DY

    23/00048/FULL1 Submitted 6 Jan 2023 77m away

    Elevation changes to the office building to include alterations to windows and doors.

    Granted Full applications Windows or glazing 10 docs
  • 1 Recreation Road, Bromley, BR2 0DY

    23/00105/CUETC3 Submitted 12 Jan 2023 78m away

    Change of use conversion application from commercial to x 3 residential units (Class MA part 3) no external alterations are proposed to the fabric of the site buildings

    Granted Prior approval 24 docs

In Bromley

  • 26/02774/FPA Granted

    BABINGTON HOUSE SCHOOL, GRANGE DRIVE, CHISLEHURST, BR7 5ES

    Demolition of canopy. Erection of canopy and associated tree works.

    8 Jul 2026 Full applications
  • 26/03420/FPA Awaiting decision

    FLAT 2, GREAT ASH, LUBBOCK ROAD, CHISLEHURST, BR7 5JZ

    Replacement of three windows and a french door to the rear elevations and replacement of one window to the front elevation, including the enlargement of one rear window opening.

    1 Sep 2026 Full applications
  • 26/02406/FPA Refused

    THE CROFT, MOTTINGHAM LANE, MOTTINGHAM, LONDON, SE9 4RX

    Demolition of the existing dwelling and construction of a four-storey detached 8-bedroom dwelling, including basement accommodation, integral garage, air source heat pump, photovoltaic panels, and associated hard and soft landscaping

    15 Jun 2026 Full applications
  • 26/01497/FPA Granted

    GRAYLINS FARM, JACKASS LANE, KESTON, BR2 6AN

    Demolition of existing 3 bedroom dwellinghouse (The Barn) established under Lawful Development Certificate ref. 25/00673/ELUD, removal of static caravan and caravan, formation of enlarged curtilage associated with proposed dwelling, with erection of replacement single storey dwellinghouse with covered car port, outside shed/logstore and associated boundary fencing and gates, with hard and soft landscaping and air source heat pumps. AMENDED/CORRECTED SITE PLAN

    16 Apr 2026 Full applications
  • 26/02692/FPA Granted

    132 CROYDON ROAD, PENGE, LONDON, SE20 7YZ

    Replacement of all existing old uPVC windows to all elevations and all flats with double glazed white coloured new uPVC windows of sliding sash styles to front elevation and top hung over top hung styles to rear and side elevations and replacement of old uPVC rear garden door with new uPVC double glazed garden door.

    3 Jul 2026 Full applications