Skip to content
PlanIndex Get alerts
Menu

Planning application

279 Beaconsfield Road, Mottingham, London, SE9 4EF

Granted Bromley 23/00772/HHPA Prior approval Part 1 Class A.1(ea): Larger home extension

Works: Extension Small domestic

Read from the description, not a valuation. How we read the register

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Single storey rear extension, extending beyond the rear wall of the original house by 6m, for which the maximum height would be 3m, and for which the height of the eaves would be 3m (42 Day Notification for Householder Permitted Development Prior Approval)

As published by the council, reference 23/00772/HHPA

Application record

Reference
23/00772/HHPA
Type
Prior approval Part 1 Class A.1(ea): Larger home extension
Status
Decision Made
Decision
PRIOR APPROVAL IS NOT REQUIRED
Received
27 Feb 2023
Validated
14 Mar 2023
Decided
23 Apr 2023
Ward
Mottingham
Decision by
Delegated Decision
Postcode
SE9 4EF

Timeline

Dates from the published record

  1. 27 Feb 2023

    Received by Bromley

  2. 14 Mar 2023

    Validated

    Checked as complete and ready for consideration.

  3. 23 Apr 2023

    Decision issued: PRIOR APPROVAL IS NOT REQUIRED

  4. 29 Aug 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

5 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What this grant of permission means

Bromley granted permission on 23 April 2023, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About prior approval applications

Prior approval applies where permitted development rights already grant the principle of the work, leaving the council only the specific matters the rules name, commonly within 56 days. More in our guide to planning application types.

Nearby applications

Within 500 metres

  • 285 BEACONSFIELD ROAD, MOTTINGHAM, LONDON, SE9 4EF

    25/05564/HPA Submitted 2 Dec 2025 51m away

    Construction of first floor rear extension.

    Refused Householder Extension 6 docs
    Domestic
  • 285 BEACONSFIELD ROAD, MOTTINGHAM, LONDON, SE9 4EF

    25/05556/NOT Submitted 2 Dec 2025 51m away

    Single storey rear extension, extending beyond the rear wall of the original house by 6m, for which the maximum height would be 3.2m, and for which the height of the eaves would be 3m (42 Day Notification for Householder Permitted Development Prior Approval)

    Granted Prior approval Extension 3 docs
    Small domestic
  • 261 Beaconsfield Road, Mottingham, London, SE9 4EE

    24/03510/FULL6 Submitted 17 Sep 2024 94m away

    Two storey side extension and single storey rear extension.

    Granted Householder Extension 11 docs
    Small domestic
  • 114 Castlecombe Road, Mottingham, London, SE9 4AP

    23/00413/FULL6 Submitted 2 Feb 2023 155m away

    Single storey side and rear extension

    Granted Householder Extension 7 docs
    Small domestic
  • 121 Castlecombe Road, Mottingham, London, SE9 4AS

    23/00785/PLUD Submitted 28 Feb 2023 203m away

    Hip to gable loft conversion with rear dormer and front roof lights (Lawful Development Certificate Proposed)

    Decided Lawful development Loft or dormer 17 docs
  • 121 Castlecombe Road, Mottingham, London, SE9 4AS

    23/00784/HHPA Submitted 28 Feb 2023 203m away

    Single storey rear extension, extending beyond the rear wall of the original house by 4.00m, for which the maximum height would be 4.00m, and for which the height of the eaves would be 3.00m (42 Day Notification for Householder Permitted Development Prior Approval)

    Refused Prior approval Extension 17 docs
    Small domestic

In Bromley

  • 26/02926/NOT Refused

    Grass Verge, Chipperfield Road, Bromley, London, BR5 2HA

    Removal of existing 8m high streetworks pole and 2no. cabinets, and replacement with 15m high Phase 7 Mk2 streetworks pole with 9no. radio antennas and ancillary apparatus including wraparound cabinet and 2no. additional equipment cabinets. (56 DAY CONSULTATION BY EE Ltd REGARDING THE NEED FOR APPROVAL OF SITING AND APPEARANCE OF TELECOMMUNICATIONS DEVELOPMENT)

    20 Jul 2026 Prior approval
  • 26/02972/NOT Granted

    3 SANDHURST ROAD, ORPINGTON, BR6 9HN

    Single storey rear extension, extending beyond the rear wall of the original house by 4.9m, for which the maximum height would be 3.17m, and for which the height of the eaves would be 3m (42 Day Notification for Householder Permitted Development Prior Approval

    22 Jul 2026 Prior approval
  • 26/03425/NOT Awaiting decision

    33 THE AVENUE, WEST WICKHAM, BR4 0DX

    Single storey rear extension, extending beyond the rear wall of the original house by 4.69m, for which the maximum height would be 3.19m, and for which the height of the eaves would be 3m (42 Day Notification for Householder Permitted Development Prior Approval)

    1 Sep 2026 Prior approval
  • 26/02802/NOT Refused

    PEILLS COURTYARD, BOURNE ROAD, BROMLEY, BR2 9NS

    Change of use of commercial building (Use Class E) to 7 dwellinghouses (Use Class C3) under Schedule 2, Part 3, Class MA of The Town and Country Planning (General Permitted Development) (England) Order 2015 (as amended) (56 day application for prior approval in respect of transport and highways impacts, contamination risks, flood risk, noise impacts, impact on character or sustainability of a conservation area, provision of natural light to habitable rooms, impact on an area of general or heavy industry, impact of loss of services provided by a registered nursery or a health centre, and fire safety impacts)

    9 Jul 2026 Prior approval
  • 26/02858/NOT Granted

    3 MANNING ROAD, ORPINGTON, BR5 4DD

    Single storey rear extension, extending beyond the rear wall of the original house by 3.50m, for which the maximum height would be 3.25m, and for which the height of the eaves would be 2.95m (42 Day Notification for Householder Permitted Development Prior Approval)

    15 Jul 2026 Prior approval