Planning application
23/00465/TELCOM
Orchard School Sports Centre, William Booth Road, Penge, London, SE20 8BG
Proposal
Installation of 25m telecommunications lattice tower with associated equipment enclosure and cabinets and ancillary development in southern corner of sports ground (56 DAY APPLICATION BY CELLNEX FOR PRIOR APPROVAL OF SITING AND APPEARANCE OF TELECOMMUNICATIONS DEVELOPMENT)
As published by the council, reference 23/00465/TELCOM
Timeline
Dates from the published record
-
6 Feb 2023
Received by Bromley
-
3 Apr 2023
Decision issued: PRIOR APPROVAL IS REQUIRED AND GRANTED
-
3 Aug 2026
Added to PlanIndex
What a grant of permission means
The process from here
Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.
Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.
About prior approval applications
How this application type works
Prior approval applications arise where permitted development rights already grant the principle of the work, such as larger home extensions, changes of use to housing or agricultural buildings. The council may only consider the specific matters set out in the rules, for example transport, flooding or appearance, and in many classes the work may proceed if the council does not respond within the deadline, commonly 56 days.
Nearby applications
Within 500 metres
-
24/03617/FULL6 Granted
8 Madeline Road, Penge, London, SE20 8AY
Single storey rear extension
-
21/02569/FULL6 Granted
30 Robinia Close, Penge, London, Bromley, SE20 8BF
Proposed loft conversion with rear dormer and front rooflight
-
26/01988/HSE Awaiting decision
47 Sylvan Road Upper Norwood London SE19 2RU
Alterations, addition of pitched roof to porch, conversion of garage to habitable room, raising of main roof ridge, rear roof extension to include dormer with six solar panels, alterations to fenestration, erection of outbuilding in rear garden and installation of two roof lights on front roof slope.
-
26/01989/GPDO Awaiting decision
47 Sylvan Road Upper Norwood London SE19 2RU
Erection of a single storey rear extension which projects out from the rear wall of the original house by 4.66 metres, with an eaves height of 3 metres and a maximum roof height of 3.23 metres.
-
21/02698/AMD1 Granted
CLARENDON HOUSE, ANERLEY ROAD, PENGE, LONDON, SE20 8BA
Non-material amendments under Section 96a of the Town and Country Planning Act to development granted planning permission under reference 21/02698/NDFLAT (Proposed two-storey upward extension above Clarendon House to create 2 new flats (56 day application under Class A, Part 20, Schedule 2 to the General Permitted Development Order 2015 (as amended by the Town and Country Planning (Permitted Development and Miscellaneous Amendments) (England) (Coronavirus) Regulations 2020) with regards to transport and highways impacts, flooding risk, air traffic and defence assets impacts, contamination risks, external appearance of the building, provision of adequate natural light to habitable rooms, impact on existing and neighbouring residential amenities and impact on protected views).) Installation of clear glass balustrade panels at the south west and south east corners of the rooftop terrace matching the height and appearance of the glass balustrade that will be mounted on the top floor terrace parapet wall.
-
24/03883/TREE Granted
80 Belvedere Road, Anerley, London, SE19 2HZ
x1 Holly tree and x1 Lime tree - Crown lift to approximately 4m.
Other prior approval applications
In Bromley
-
26/02489/NOT Granted
82 BROMLEY GARDENS, BROMLEY, BR2 0ET
Single storey rear extension, extending beyond the rear wall of the original house by 4.87m, for which the maximum height would be 3.6m, and for which the height of the eaves would be 2.8m (42 Day Notification for Householder Permitted Development Prior Approval)
-
26/02407/NOT Granted
124 LULLINGSTONE CRESCENT, ORPINGTON, BR5 3DX
Single storey rear extension, extending beyond the rear wall of the original house by 6m, for which the maximum height would be 3m, and for which the height of the eaves would be 3m (42 Day Notification for Householder Permitted Development Prior Approval)
-
26/02345/NOT Granted
THE POPLARS, WESTERHAM ROAD, KESTON, BR2 6AG
Single storey rear extension, extending beyond the rear wall of the original house by 8m, for which the maximum height would be 4m, and for which the height of the eaves would be 2.72m (42 Day Notification for Householder Permitted Development Prior Approval)
-
26/02428/NOT Granted
14 CROFTON AVENUE, ORPINGTON, BR6 8DU
Single storey rear extension, extending beyond the rear wall of the original house by 8m, for which the maximum height would be 3m, and for which the height of the eaves would be 3m (42 Day Notification for Householder Permitted Development Prior Approval)
-
26/02972/NOT Awaiting decision
3 SANDHURST ROAD, ORPINGTON, BR6 9HN
Single storey rear extension, extending beyond the rear wall of the original house by 4.9m, for which the maximum height would be 3.17m, and for which the height of the eaves would be 3m (42 Day Notification for Householder Permitted Development Prior Approval