Skip to content
PlanIndex Get alerts
Menu

Planning application

23/00089/FULL1

75B Venner Road, Sydenham, London, SE26 5HU

Granted Bromley Full planning permission

Proposal

Conversion of roofspace to provide habitable accommodation including rear dormer extension and 3 front roof lights.

As published by the council, reference 23/00089/FULL1

Timeline

Dates from the published record

  1. 11 Jan 2023

    Received by Bromley

  2. 13 Mar 2023

    Decision issued: GRANTED

  3. 25 Jul 2026

    Added to PlanIndex

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • 21/02151/FULL6 Granted

    103 Venner Road, Sydenham, London, SE26 5HU

    Ground floor side return infill extension

    29 Apr 2021 104m away Householder
  • DC/19/114938 Granted

    66A, B & C VENNER ROAD, LONDON, SE26 5EL

    Installation of replacement uPVC double glazed windows and doors in the front, side and rear elevations to Flats A-C 66 Venner Road SE26.

    6 Dec 2019 136m away Full applications
  • DC/21/121377 Granted

    17B TREDOWN ROAD, LONDON, SE26 5QQ

    The installation of a replacement double glazed UPVC window at 17B Tredown Road, SE26

    19 Apr 2021 164m away Full applications
  • DC/20/115296 Granted

    29 LAWRIE PARK ROAD, LONDON, SE26 6DP

    Removal of two chimney stacks to below roof level at 29 Lawrie Park Road, SE26.

    15 Jan 2020 206m away Full applications
  • DC/26/143105 Granted

    139 NEWLANDS PARK, LONDON, SE26 5PP

    Contruction of a single storey rear and side ground floor extension at 139 Newlands Park, SE26

    24 Feb 2026 216m away Householder
  • DC/22/129403 Refused

    46 NEWLANDS PARK, LONDON, SE26 5NE

    Construction of 1, two storey 4 bedroomed house at the rear of 46 Newlands Park SE26.

    25 Nov 2022 239m away Full applications

In Bromley

  • 26/01794/FPA Refused

    44 SHEPPERTON ROAD, PETTS WOOD, ORPINGTON, BR5 1DN

    Demolition of existing bungalow and erection of 2 semi-detached two storey dwellings with associated car and cycle parking, landscaping, installation of PV panels and air source heat pumps

    6 May 2026 Full applications
  • 25/05372/FPA Withdrawn

    LEAFY GROVE HOUSE, 82 HEATHFIELD ROAD, KESTON, BR2 6BF

    Change of use of existing dwelling house (Use Class C3) to a residential children’s home (Use Class C2) to accommodate up to four children aged between 8 and 17 years old

    19 Nov 2025 Full applications
  • 26/03046/FPA Awaiting decision

    SUNNYBANK, THE HILLSIDE, ORPINGTON, BR6 7SD

    Demolition of existing dwelling and garage and erection of custom/self-build dwelling with front boundary wall and gates, basement garage, EV charging point, solar panels and hard and soft landscaping

    29 Jul 2026 Full applications
  • 26/03045/FPA Awaiting decision

    80 HIGH STREET, BECKENHAM, BR3 1ED

    Retention of uPVC double glazed windows in east and south elevations at second and third floor level

    28 Jul 2026 Full applications
  • 26/01592/FPA Granted

    LONDON SOUTH EAST COLLEGES BROMLEY CAMPUS, ROOKERY LANE, BROMLEY, BR2 8HE

    Installation of external covered recreational seating area to south elevation (adjoining existing common room) with stepped and ramped access, installation of external seating/amphitheatre area to west elevation with visual screen and steps from first floor terrace to lower level and formation of planters for Peace Garden.

    22 Apr 2026 Full applications