Planning application
22/04906/FULL1
Land And Garages Rear Of 8 To 12, Laurel Grove, Penge, London
Proposal
Construction of a single storey infill garage.
As published by the council, reference 22/04906/FULL1
Timeline
Dates from the published record
-
14 Dec 2022
Received by Bromley
-
2 Jan 2023
Validated
Checked as complete and ready for consideration.
-
29 Mar 2023
Decision issued: GRANTED
-
3 Aug 2026
Added to PlanIndex
What a grant of permission means
The process from here
Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.
Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
26/02476/FPA Awaiting decision
OAKLEIGH COURT, WOODBINE GROVE, PENGE, LONDON, SE20 8UY
Replacement of existing painted metal spindle balcony balustrades with new powder coated metal with solid infill panel balcony balustrades to front and rear elevations.
-
26/01690/FPA Awaiting decision
MUIRHEAD VACTRIC, OAKFIELD ROAD, PENGE, LONDON, SE20 8EW
Erection of employment buildings (Use Classes E(g)(iii) / B2 / B8) and the provision of car and cycle parking, landscaping and associated infrastructure, including a new substation.
-
23/00466/TELCOM Granted
Europa International, Oakfield Road Industrial Estate, Oakfield Road, Penge, London, SE20 8RA
Installation of 25m lattice telecommunication tower hosting 12 no. antennas (with max. height to top of antennas of 26.3m above ground level) with associated ground level development including compound and equipment cabinets (56 DAY CONSULTATION BY CELLNEX REGARDING THE SITING AND APPEARANCE OF TELECOMMUNICATIONS DEVELOPMENT).
-
26/02792/FPA Awaiting decision
103 MAPLE ROAD, PENGE, LONDON, SE20 8LP
Conversion of existing flat into 2x studio flats with associated secured refuse and cycle storage.
-
23/00093/FULL6 Granted
6A Challin Street, Penge, London, SE20 8LW
Single storey rear extension RETROSPECTIVE APPLICATION
-
26/01411/FPA Granted
91A MAPLE ROAD, PENGE, LONDON, SE20 8LN
Erection of a rear extension (following demolition of rear extension) to provide additional commercial floorspace at No 91a Maple Road, together with associated works.
Other full applications applications
In Bromley
-
26/01794/FPA Refused
44 SHEPPERTON ROAD, PETTS WOOD, ORPINGTON, BR5 1DN
Demolition of existing bungalow and erection of 2 semi-detached two storey dwellings with associated car and cycle parking, landscaping, installation of PV panels and air source heat pumps
-
25/05372/FPA Withdrawn
LEAFY GROVE HOUSE, 82 HEATHFIELD ROAD, KESTON, BR2 6BF
Change of use of existing dwelling house (Use Class C3) to a residential children’s home (Use Class C2) to accommodate up to four children aged between 8 and 17 years old
-
26/03046/FPA Awaiting decision
SUNNYBANK, THE HILLSIDE, ORPINGTON, BR6 7SD
Demolition of existing dwelling and garage and erection of custom/self-build dwelling with front boundary wall and gates, basement garage, EV charging point, solar panels and hard and soft landscaping
-
26/03045/FPA Awaiting decision
80 HIGH STREET, BECKENHAM, BR3 1ED
Retention of uPVC double glazed windows in east and south elevations at second and third floor level
-
26/01592/FPA Granted
LONDON SOUTH EAST COLLEGES BROMLEY CAMPUS, ROOKERY LANE, BROMLEY, BR2 8HE
Installation of external covered recreational seating area to south elevation (adjoining existing common room) with stepped and ramped access, installation of external seating/amphitheatre area to west elevation with visual screen and steps from first floor terrace to lower level and formation of planters for Peace Garden.