Planning application
22/00961/FULL1
Garages Rear Of 47-75, Mottingham Road, Mottingham, London
Proposal
Use of the vehicular access between 45-47 Mottingham Road within the London Borough of Bromley relating to the demolition of existing garages, together with construction, access, and servicing of 4 detached two storey buildings with associated cycle and car parking and landscaping situated within the London Borough of Greenwich. The proposed use classes are E (professional, financial and other smalls commercial services to service its immediate locality i.e., gym, nursery or similar); and use classes B2, B8 (general industrial, storage, distribution).
As published by the council, reference 22/00961/FULL1
Timeline
Dates from the published record
-
3 Mar 2022
Received by Bromley
-
16 May 2022
Validated
Checked as complete and ready for consideration.
-
4 Apr 2023
Decision issued: REFUSED
-
3 Aug 2026
Added to PlanIndex
What refusal means
The process from here
The council refused this application for the reasons set out on the decision notice, which the council portal holds in full. Only the applicant can appeal a refusal; the time limit runs from the decision date and is shorter for householder schemes.
Refusal does not prevent a fresh attempt. Applicants often address the reasons for refusal and resubmit, so a refused scheme is not necessarily the end of proposals for the site.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
26/01893/FPA Granted
61A MOTTINGHAM ROAD, MOTTINGHAM, LONDON, SE9 4QZ
Conversion of existing 4 bedroom duplex flat into 2x1 bedroom flats with associated cycle storage.
-
26/01893/CON Awaiting decision
61A MOTTINGHAM ROAD, MOTTINGHAM, LONDON, SE9 4QZ
Details submitted to comply with the requirements of the following conditions relating to planning permission 26/01893/FPA: Condition 3 - Refuse & Recyclables Storage Management Plan Condition 4 - Bicycle Parking Arrangements
-
26/1635/HD Awaiting decision
28 WEST PARK, ELTHAM, LONDON, SE9 4RQ
Construction of a garden office with canopy and decking.
-
23/0085/K Granted
24 MOTTINGHAM ROAD, LONDON, SE9 4QW
The erection of substation. (RETROSPECTIVE).
-
22/0594/HD Granted
243 COURT ROAD, ELTHAM, LONDON, SE9 4TQ
Enlargement of existing dropped kerb/vehicle crossover.
-
24/03626/PLUD Decided
13 Portland Crescent, Mottingham, London, SE9 4TT
Loft conversion to habitable room including L shaped rear dormer with two Juillet balcony and two front roof lights.LAWFUL DEVEOPMENT CERTIFICATE (PROPOSED)
Other full applications applications
In Bromley
-
26/01794/FPA Refused
44 SHEPPERTON ROAD, PETTS WOOD, ORPINGTON, BR5 1DN
Demolition of existing bungalow and erection of 2 semi-detached two storey dwellings with associated car and cycle parking, landscaping, installation of PV panels and air source heat pumps
-
25/05372/FPA Withdrawn
LEAFY GROVE HOUSE, 82 HEATHFIELD ROAD, KESTON, BR2 6BF
Change of use of existing dwelling house (Use Class C3) to a residential children’s home (Use Class C2) to accommodate up to four children aged between 8 and 17 years old
-
26/03046/FPA Awaiting decision
SUNNYBANK, THE HILLSIDE, ORPINGTON, BR6 7SD
Demolition of existing dwelling and garage and erection of custom/self-build dwelling with front boundary wall and gates, basement garage, EV charging point, solar panels and hard and soft landscaping
-
26/03045/FPA Awaiting decision
80 HIGH STREET, BECKENHAM, BR3 1ED
Retention of uPVC double glazed windows in east and south elevations at second and third floor level
-
26/01592/FPA Granted
LONDON SOUTH EAST COLLEGES BROMLEY CAMPUS, ROOKERY LANE, BROMLEY, BR2 8HE
Installation of external covered recreational seating area to south elevation (adjoining existing common room) with stepped and ramped access, installation of external seating/amphitheatre area to west elevation with visual screen and steps from first floor terrace to lower level and formation of planters for Peace Garden.